19 resultados para EPA (Economic Partnership Agreement)
Resumo:
Faced with a WTO in a state of paralysis, large developed trading nations have shifted their attentions to other fora to pursue their trade policy objectives. In particular, preferential trade agreements (PTAs) are now being used to promote the regulatory disciplines that were previously rejected by developing countries at the multilateral level. These so-called ‘deep’ or ‘21st century’ PTAs address a variety of issues, from technical norms, procurement, investment protection and intellectual property rights to social and environmental protection. Moreover, recently, developed countries have sought to negotiate PTAs which are large in scale, both in terms of economic size and geographical reach, including the so-called ‘mega-regional’ PTAs, such as the EU-US Transatlantic Trade and Investment Partnership, the EU-Japan PTA, the Transpacific Partnership, and the China-backed Regional Comprehensive Economic Partnership. These mega-regional PTAs are distinctive not just in terms of their sheer size and the breadth and depth of issues addressed, but also because some of their proponents readily admit that one of the central aims pursued by such agreements is to design global rules on new trade issues. In other words, these agreements are being conceived as alternatives to multilateral rule making at the WTO level. The proliferation of 21st century trade deals raises important questions concerning the continued relevance of the WTO as a global rule-making venue, and the impact that the regulatory disciplines promoted in such agreements will have on both developing and developed countries. This paper discusses the emerging features of an international trading system that is increasingly populated by large-scale PTAs and discusses some of the points of tension that arise from such practice. Firstly, it examines instances of horizontal tension resulting from the proliferation of PTAs, particularly the extent to which such PTAs represent a threat or multilateral trade governance. Secondly, it looks at an example of vertical tension by examining the manner in which the imposition of regulatory disciplines through trade agreements can undermine the ability of countries, especially developing countries, to pursue legitimate public interest objectives. Finally, the paper considers a number of steps that could be considered to address some of the adverse effects associated with the fragmentation of the international trading system, including the option of embracing variable geometry within the WTO framework and the need to develop mechanisms that provide flexibility for developing countries in the implementation of regulatory disciplines.
Resumo:
In 1998 a historic agreement, commonly known as the Belfast or Good Friday Agreement, formed the basis of a negotiated settlement for the future of Northern Ireland. Since that time the level of violence in Northern Ireland has reduced but many problematic issues related to governance, sectarianism, and community relations remain on the political agenda and have destabilized the post-peace accord environment. Many of these issues can be viewed as either causes or consequences of the protracted conflict in Northern Ireland. This special issue examines some of these issues from a political psychology perspective. Economic, political, social, and psychological factors that have supported and hindered progress towards peace and stability are considered. While the paramilitary ceasefires have remained intact and certain aspects of life in Northern Ireland have been transformed, the road to peace has been hindered by both political and psychological intransigence. This paper offers an opportunity to reevaluate conceptualisations of conflict and its management in chronic situations, where divisions are deeply embedded within societal structures and relationships, and consider factors that may act as barriers to the development of a lasting peace.
Resumo:
Purpose The UK government argues that the benefits of public private partnership (PPP) in delivering public infrastructure stem from: transferring risks to the private sector within a structure in which financiers put their own capital at risk; and, the performance based payment mechanism, reinforced by the due diligence requirements imposed by the lenders financing the projects (HM Treasury, 2010). Prior studies of risk in PPPs have investigated ‘what’ risks are allocated and to ‘whom’, that is to the public or the private sector. The purpose of this study is to examine ‘how’ and ‘why’ PPP risks are diffused by their financiers. Design/methodology/approach This study focuses on the financial structure of PPPs and on their financiers. Empirical evidence comes from interviews conducted with equity and debt financiers. Findings The findings show that the financial structure of the deals generates risk aversion in both debt and equity financiers and that the need to attract affordable finance leads to risk diffusion through a network of companies using various means that include contractual mitigation through insurance, performance support guarantees, interest rate swaps and inflation hedges. Because of the complexity this process generates, both procurers and suppliers need expensive expert advice. The risk aversion and diffusion and the consequent need for advice add cost to the projects impacting on the government’s economic argument for risk transfer. Limitations and implications The empirical work covers the private finance initiative (PFI) type of PPP arrangements and therefore the risk diffusion mechanisms may not be generalisable to other forms of PPP, especially those that do not involve the use of high leverage or private finance. Moreover, the scope of this research is limited to exploring the diffusion of risk in the private sector. Further research is needed on how risk is diffused in other settings and on the value for money implication of risk diffusion in PPP contracts. Originality/value The expectation inherent in PPP is that the private sector will better manage those risks allocated to it and because private capital is at risk, financiers will perform due diligence with the ultimate outcome that only viable projects will proceed. This paper presents empirical evidence that raises questions about these expectations. Key words: public private partnership, risk management, diffusion, private finance initiative, financiers
Resumo:
OBJECTIVES: To determine effective and efficient monitoring criteria for ocular hypertension [raised intraocular pressure (IOP)] through (i) identification and validation of glaucoma risk prediction models; and (ii) development of models to determine optimal surveillance pathways.
DESIGN: A discrete event simulation economic modelling evaluation. Data from systematic reviews of risk prediction models and agreement between tonometers, secondary analyses of existing datasets (to validate identified risk models and determine optimal monitoring criteria) and public preferences were used to structure and populate the economic model.
SETTING: Primary and secondary care.
PARTICIPANTS: Adults with ocular hypertension (IOP > 21 mmHg) and the public (surveillance preferences).
INTERVENTIONS: We compared five pathways: two based on National Institute for Health and Clinical Excellence (NICE) guidelines with monitoring interval and treatment depending on initial risk stratification, 'NICE intensive' (4-monthly to annual monitoring) and 'NICE conservative' (6-monthly to biennial monitoring); two pathways, differing in location (hospital and community), with monitoring biennially and treatment initiated for a ≥ 6% 5-year glaucoma risk; and a 'treat all' pathway involving treatment with a prostaglandin analogue if IOP > 21 mmHg and IOP measured annually in the community.
MAIN OUTCOME MEASURES: Glaucoma cases detected; tonometer agreement; public preferences; costs; willingness to pay and quality-adjusted life-years (QALYs).
RESULTS: The best available glaucoma risk prediction model estimated the 5-year risk based on age and ocular predictors (IOP, central corneal thickness, optic nerve damage and index of visual field status). Taking the average of two IOP readings, by tonometry, true change was detected at two years. Sizeable measurement variability was noted between tonometers. There was a general public preference for monitoring; good communication and understanding of the process predicted service value. 'Treat all' was the least costly and 'NICE intensive' the most costly pathway. Biennial monitoring reduced the number of cases of glaucoma conversion compared with a 'treat all' pathway and provided more QALYs, but the incremental cost-effectiveness ratio (ICER) was considerably more than £30,000. The 'NICE intensive' pathway also avoided glaucoma conversion, but NICE-based pathways were either dominated (more costly and less effective) by biennial hospital monitoring or had a ICERs > £30,000. Results were not sensitive to the risk threshold for initiating surveillance but were sensitive to the risk threshold for initiating treatment, NHS costs and treatment adherence.
LIMITATIONS: Optimal monitoring intervals were based on IOP data. There were insufficient data to determine the optimal frequency of measurement of the visual field or optic nerve head for identification of glaucoma. The economic modelling took a 20-year time horizon which may be insufficient to capture long-term benefits. Sensitivity analyses may not fully capture the uncertainty surrounding parameter estimates.
CONCLUSIONS: For confirmed ocular hypertension, findings suggest that there is no clear benefit from intensive monitoring. Consideration of the patient experience is important. A cohort study is recommended to provide data to refine the glaucoma risk prediction model, determine the optimum type and frequency of serial glaucoma tests and estimate costs and patient preferences for monitoring and treatment.
FUNDING: The National Institute for Health Research Health Technology Assessment Programme.
Resumo:
This chapter sets out to explain the factors behind Ireland's exceptional period of economic growth from the early 1990s to the mid 2000s. It suggests that an unbending commitment to economic openness and an on-going effort to establish quality domestic institutions were the main drivers of the so-called ‘Celtic tiger’ phenomenon. The commitment to economic openness manifested itself in the relentless search for inward investment and a willingness to accept deep forms of European integration. Building domestic institutional capabilities involved adopting new-classical macroeconomic policies, creating a robust system of social partnership and reforming the educational system. The two factors positively interacted with each other to create dynamic effects.
Resumo:
This paper advances knowledge of how civil society organisations (CSOs) negotiate the shift from boom-time public expenditure to governmental austerity. The study focuses on the Republic of Ireland, where CSOs occupied an important role in providing a voice for ‘vulnerable’citizens in corporatism for over a decade. The global financial crisis and subsequent austerity measures caused the country’s model of corporatist-style ‘social partnership’ to collapse. The article connects CSOs’ adaptation to austerity measures when protecting the ‘people behind the cuts’ to broader questions about co-optation of civil society through state-led policymaking
institutions.
Resumo:
The paper presents a protocol for ‘A Randomized Controlled Trial of Functional Family Therapy (FFT): An Early Intervention Foundation (EIF) Partnership between Croydon Council and Queen's University Belfast’. The protocol describes a trial that uses FFT as an alternative intervention to current use of the youth justice system and local authority care with the aim of reducing crime/recidivism in young people referred to Croydon Council. The trial will take place over a period of 36 months and will involve up to 154 families. Croydon Council will employ a team of five Functional Family Therapists who will work with families to promote effective outcomes. The Centre for Effective Education at Queen’s University Belfast will act as independent evaluators of outcomes for families and young people. The work is supported from the United Kingdom Economic & Social Research Council/Early Intervention Foundation Grant Number ES/M006921/1.
Resumo:
In comparison to the rest of the United Kingdom (UK) the Northern Irish Construction Industry was disproportionately affected by the recent economic recession. During this period, use of the New Engineering Contract (NEC) has proliferated in the public sector, however no study has been undertaken to examine the impact of the recession on this contract in Northern Ireland. The aim of this paper is to explore NEC contract implementation in Northern Ireland and the impact of the recession on its operation. A qualitative methodology is adopted using a literature review and semi structured interviews with six construction professionals. A qualitative analysis identifies themes and issues arising exploring connections and links between them using thematic coding. The initial findings are that the introduction of the NEC contract in Northern Ireland makes demands of contractors and consultants in terms of additional resources and training. Some consultants show a clear lack of understanding of the contract and its provisions. Whilst there is general agreement that the contract does help to stimulate good project management, the interviewees find the contract time consuming and complicated to administer, describing it as “unforgiving for the architect and unforgiving to the contractor.” Due to the impact of the recession, both contractors and consultants are still reporting a drop in income from pre-recession levels. Project resourcing levels have dropped significantly since the onset of the recession. Adversarial and opportunistic behaviour has increased. Many consultants and contractors are struggling to adequately administer the NEC contract at current income levels. The introduction of the NEC contract and the economic recession have exerted opposing forces on the implementation of the contract, hindering its execution. As the pressures exerted by the economic recession abate and a greater understanding of the contract develops, these opposing forces will ease leading to a more consistent implementation of the contract.
Resumo:
Socioeconomic status (SES) differences in attitudes towards cancer have been implicated in the differential screening uptake and the timeliness of symptomatic presentation. However, the predominant emphasis of this work has been on cancer fatalism, and many studies focus on specific community subgroups. This study aimed to assess SES differences in positive and negative attitudes towards cancer in UK adults. A population-based sample of UK adults (n=6965, age≥50 years) completed the Awareness and Beliefs about Cancer scale, including six belief items: three positively framed (e.g. 'Cancer can often be cured') and three negatively framed (e.g. 'A cancer diagnosis is a death sentence'). SES was indexed by education. Analyses controlled for sex, ethnicity, marital status, age, self-rated health, and cancer experience. There were few education-level differences for the positive statements, and overall agreement was high (all>90%). In contrast, there were strong differences for negative statements (all Ps<0.001). Among respondents with lower education levels, 57% agreed that 'treatment is worse than cancer', 27% that cancer is 'a death sentence' and 16% 'would not want to know if I have cancer'. Among those with university education, the respective proportions were 34, 17 and 6%. Differences were not explained by cancer experience or health status. In conclusion, positive statements about cancer outcomes attract near-universal agreement. However, this optimistic perspective coexists alongside widespread fears about survival and treatment, especially among less-educated groups. Health education campaigns targeting socioeconomically disadvantaged groups might benefit from a focus on reducing negative attitudes, which is not necessarily achieved by promoting positive attitudes.
Resumo:
From 1987 to 2009, Irish social partnership operated as a national framework for industrial relations. The contribution of the article is twofold. We seek to link the institutional dynamics of social partnership with the Régulation School's notions of modes of accumulation and regimes of régulation. This framework is used to explain the rise and fall of social partnership in Ireland. We argue that the regime of social partnership in Ireland can be divided into two distinct periods. In the first, social partnership contributed positively to a benign productivity-led mode of accumulation. In the second, it lost its economic functionality due mostly to financialisation taking a grip in the Irish economy. The conclusion is that social partnership had both positive and negative features, but it is unlikely to be repeated in the foreseeable future, at least not in Ireland.
Resumo:
During the past two decades the UK has played a leading position in the development and application of Public Private Partnership (PPP) based infrastructure procurement through its Private Finance Initiative model. This model had been developed during the last years of the Major Government and expanded during the early years of the Blair Government. The banking and economic crisis of 2007-09 has created major challenges to the use of PPP in the UK, making the sustainability of past levels of PPP investment and the future direction of PPP based infrastructure procurement in that country uncertain. This chapter summarises key developments in UK PPP up to the crisis; reviews the economic issues that have led up to the crisis; discusses the immediate impact of the crisis on the UK PFI and PPP market together with the transition arrangements that were put into to place by the Brown government; and, lastly, looks at recent initiatives taken by Cameron’s Conservative-Liberal Coalition Government under the designation of Private Finance 2 (PF2).
Resumo:
In many developed and developing countries there has been a move toward an increased reliance on Public Private Partnerships (PPPs) for infrastructure development. This involves an engagement with, or participation of, private companies and the public sector in the financing and provision of infrastructure. In most countries these PPP arrangements have been aimed at overcoming broad public sector constraints in relation to either a lack of public capital; and/or a lack of public sector capacity, resources and specialized expertise to develop, manage, and operate infrastructure assets.
In a number of countries Public Private Partnerships are now commonly used to accelerate economic growth, development and infrastructure delivery and to achieve quality service delivery and good governance. The spectrum of nature and types of public private partnerships (PPPs) are vast, making a precise and complete definition of a PPP difficult. However, significant developments in the use of PPP in many countries have made it increasingly important to understand these practices, as well as to unveil any underlying common principles and problems and to capture and develop a body of good practices, where such can be achieved.