148 resultados para Building inspection
Resumo:
Background
Currently, there is growing interest in developing ante and post mortem meat inspection (MI) to incorporate measures of pig health and welfare for use as a diagnostic tool on pig farms. However, the success of the development of the MI process requires stakeholder engagement with the process. Knowledge gaps and issues of trust can undermine the effective exchange and utilisation of information across the supply chain. A social science research methodology was employed to establish stakeholder perspectives towards the development of MI to include measures of pig health and welfare. In this paper the findings of semi-structured telephone interviews with 18 pig producers from the Republic of Ireland and Northern Ireland are presented.
Results
Producers recognised the benefit of the utilisation of MI data as a health and welfare diagnostic tool. This acknowledgment, however, was undermined for some by dissatisfaction with the current system of MI information feedback, by trust and fairness concerns, and by concerns regarding the extent to which data would be used in the producers’ interests. Tolerance of certain animal welfare issues may also have a negative impact on how producers viewed the potential of MI data. The private veterinary practitioner was viewed as playing a vital role in assisting them with the interpretation of MI data for herd health planning.
Conclusions
The development of positive relationships based on trust, commitment and satisfaction across the supply chain may help build a positive environment for the effective utilisation of MI data in improving pig health and welfare. The utilisation of MI as a diagnostic tool would benefit from the development of a communication strategy aimed at building positive relationships between stakeholders in the pig industry.
Resumo:
A series of short and long term service load tests were undertaken on the sixth floor of the full-scale, seven storey, reinforced concrete building at the Large Building Test Facility of the Building Research Establishment at Cardington. By using internally strain gauged reinforcing bars cast into an internal and external floor bay during the construction process it was possible to gain a detailed record of slab strains resulting from the application of several arrangements of test loads. Short term tests were conducted in December 1998 and long term monitoring then ensued until April 2001. This paper describes the test programmes and presents results to indicate slab behaviour for the various loading regimes.
Resumo:
Abstract: Purpose – The aim of this paper is to examine and compare the performance of architects with respect to clients' rating of importance over a set of performance criteria in Nigerian public and private sector building projects. Design/methodology/approach – A survey involving clients from both public and private sectors of recently completed building projects in Nigeria was undertaken. Data analysis includes comparing similarities and differences using standardised ratio, Mann Whitney U and Wilcoxon tests. Findings – The results show that private sector clients are likely to be more concerned with cost, while public sector clients are more concerned with buildability of design. A total of 79 per cent of the criteria were similarly selected by both sectors with respect to importance of the criteria. Architects need to improve their performance significantly in about 82 per cent of the whole set of 28 criteria. The architects performed better in the public sector than the private sector and 14 per cent of the criteria were indicated as being statistically different in terms of architects' performance. Originality/value – The results provide feedback which can be incorporated in architects' future projects so as to ensure successful project implementation in the building delivery process.
Resumo:
The overall intent of this research is to provide architects with information that can be used to improve their performance so as to optimally satisfy the client's requirements and achieve high-quality overall project performance in Nigerian construction industry. Architect performance criteria were identified based on literature within the domain of architect responsibilities. The assessment of architects’ performance was carried out through a questionnaire survey of clients of recently completed building projects in Nigeria. Analysis of data includes comparison of criteria using importance–performance index analysis. Factor analysis was carried out on criteria where architects are falling below average, to group and explore the latent structure of the criteria in the data. The results showed that the architect needs to focus on management skills and ability, buildability, design quality, project communication, project integration and client focus. These results would encourage architects to perform better within their full responsibilities in the building delivery process and deliver high-quality projects within Nigerian construction industry.