20 resultados para Asset Management Contracts


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Over the last thirty years, there has been an increased demand for better management of public sector organisations (PSOs). This requires that they are answerable for the inputs that they are given but also for what they achieve with these inputs (Hood 1991; Hood 1995). It is suggested that this will improve the management of the organisation through better planning and control, and the achievement of greater accountability (Smith 1995). However, such a rational approach with clear goals and the means to measure achievement can cause difficulties for many PSOs. These difficulties include the distinctive nature of the public sector due to the political environment within which the public sector manager operates (Stewart and Walsh 1992) and the fact that PSOs will have many stakeholders, each of whom will have their own specific objectives based on their own perspective (Boyle 1995). This can
result in goal ambiguity which means that there is leeway in interpreting the results of the PSO. The National Asset Management Agency (NAMA) was set up to bring stability to the financial system by buying loans from the banks (which were in most cases, non-performing loans). The intention was to cleanse the banks of these loans so that they could return to their normal business of taking deposits and making loans. However, the legislation, also gave NAMA a wide range of other responsibilities including responsibility for facilitating credit in the economy and protecting the interests of taxpayers. In more recent times, NAMA has been given responsibility for building social housing. This wide-range of activities is a clear example of a PSO being given multiple goals which may conflict and is therefore likely to lead to goal ambiguity. This makes it very difficult to evaluate NAMA’s performance as they are attempting to meet numerous goals at the same time and also highlights the complexity of policy making in the public sector. The purpose of this paper is to examine how NAMA dealt with goal ambiguity. This will be done through a thematic analysis of its annual reports over the last five years. The paper’s will contribute to the ongoing debate about the evaluation of PSOs and the complex environment within which they operate which makes evaluation difficult as they are
answerable to multiple stakeholders who have different objectives and different criteria for measuring success.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose: This paper investigates the link between two knowledge areas that have not been previously linked conceptually; stakeholder management and corporate culture. Focussing on the UK Construction Industry, the research study demonstrates mutual dependency of each of these areas on the other and establishes a theoretical framework with real potential to impact positively upon industry.

Design/methodology/approach: The study utilises both qualitative and quantitative data collection and then analysis to produce results contributing to the final framework. Semi-structured interviews were used and analysed through a cognitive mapping procedure. The result of this stage, set in the context of previous research, facilitated a questionnaire to be developed which helped gather quantitative values from a larger sample to enhance the final framework.

Findings: The data suggests that stakeholder management and corporate culture are key areas of an organisation’s success, and that this importance will only grow in future. A clearly identifiable relationship was established between the two theoretical areas and a framework developed and quantified.

Originality/value: It is evident that change is needed within the UK Construction Industry. Companies must employ ethical and social stakeholder management and manage their corporate culture like any other aspect of their business. Successfully doing this will lead to more successful projects, better reputation and survival. The findings of this project begin to show how change may occur and how companies might intentionally deploy advantageous configurations of corporate culture and stakeholder management.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The UK’s transport infrastructure is one of the most heavily used in the world. The performance of these networks is critically dependent on the performance of cutting and embankment slopes which make up £20B of the £60B asset value of major highway infrastructure alone. The rail network in particular is also one of the oldest in the world: many of these slopes are suffering high incidents of instability (increasing with time). This paper describes the development of a fundamental understanding of earthwork material and system behaviour, through the systematic integration of research across a range of spatial and temporal scales. Spatially these range from microscopic studies of soil fabric, through elemental materials behaviour to whole slope modelling and monitoring and scaling up to transport networks. Temporally, historical and current weather event sequences are being used to understand and model soil deterioration processes, and climate change scenarios to examine their potential effects on slope performance in futures up to and including the 2080s. The outputs of this research are being mapped onto the different spatial and temporal scales of infrastructure slope asset management to inform the design of new slopes through to changing the way in which investment is made into aging assets. The aim ultimately is to help create a more reliable, cost effective, safer and more resilient transport system.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Traditional business models in the aerospace industry are based on a conventional supplier to customer relationship based on the design, manufacture and subsequent delivery of the physical product. Service provision, from the manufacturer's perspective, is typically limited to the supply of procedural documentation and the provision of spare parts to the end user as the product passes through the latter stages of its intended lifecycle. Challenging economic and political conditions have resulted in end users re-structuring their core business activities, particularly in the defence sector. This has resulted in the need for original equipment manufacturers (OEMs) to integrate and manage support service activities in partnership with the customer to deliver platform availability. This improves the probability of commercial sustainability for the OEM through shared operational risks while reducing the cost of platform ownership for the customer. The need for OEMs to evolve their design, manufacture and supply strategies by focusing on customer requirements has revealed a need for reconstruction of traditional internal behaviours and design methodologies. Application of organisational learning is now a well recognised principle for innovative companies to achieve long term growth and sustained technical development, and hence, greater market command. It focuses on the process by which the organisation's knowledge and value base changes, leading to improved problem solving ability and capacity for action. From the perspective of availability contracting, knowledge and the processes by which it is generated, used and retained, become primary assets within the learning organisation. This paper will introduce the application of digital methods to asset management by demonstrating how the process of learning can benefit from a digital approach, how product and process design can be integrated within a virtual framework and finally how the approach can be applied in a service context.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Best concrete research paper by a student - Research has shown that the cost of managing structures puts high strain on the infrastructure budget, with
estimates of over 50% of the European construction budget being dedicated to repair and maintenance. If reinforced concrete
structures are not suitably designed and adequately maintained, their service life is compromised, resulting in the full economic
value of the investment not realised. The issue is more prevalent in coastal structures as a result of combinations of aggressive
actions, such as those caused by chlorides, sulphates and cyclic freezing and thawing.
It is a common practice nowadays to ensure durability of reinforced concrete structures by specifying a concrete mix and a
nominal cover at the design stage to cater for the exposure environment. This in theory should produce the performance required
to achieve a specified service life. Although the European Standard EN 206-1 specifies variations in the exposure environment,
it does not take into account the macro and micro climates surrounding structures, which have a significant influence on their
performance and service life. Therefore, in order to construct structures which will perform satisfactorily in different exposure
environments, the following two aspects need to be developed: a performance based specification to supplement EN 206-1
which will outline the expected performance of the structure in a given environment; and a simple yet transferrable procedure
for assessing the performance of structures in service termed KPI Theory. This will allow the asset managers not only to design
structures for the intended service life, but also to take informed maintenance decisions should the performance in service fall
short of what was specified. This paper aims to discuss this further.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

As part of a UK-China science bridge project - a UK government funded initiative linking leading universities and businesses in selective partnering countries in 2009 a collaborative research programme was initiated between Queen's University and the Research Institute of High Performance Concrete (part of the Central Research Institute of Building and Construction) in Beijing.

For further details email b.magee@ulster.ac.uk

Relevância:

30.00% 30.00%

Publicador:

Resumo:

What is a benchmark bond? We provide a formal theoretical treatment of this concept that relates endogenously determined benchmark status to the location of price discovery and we derive its implications. We describe a rich but little used econometric technique for identifying the benchmark that is congruent with our theoretical framework. We apply this in the context of the US corporate bond market and to the natural experiment that occurred when benchmark status was contested in the European sovereign bond markets after the introduction of the Euro. We show that France provides the benchmark at most maturities in the Euro-denominated sovereign bond market and that IBM provides the benchmark in the 10 year maturity in the US corporate bond market.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article examines operational Private Finance Initiative (PFI) school projects and reports the experiences of UK headteachers. It considers the impact of project size on value for money (VFM). Headteachers involved in small projects are more satisfied with costs than those involved in large projects, but headteachers involved in larger projects are more satisfied with affordability. Generally, heads are more satisfied with the buildings than with the services. The authors question the government’s recent policy changes to increase the size of PFI projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Within the context of New Public Management (NPM), successive UK governments have claimed that PFI projects provide more accountability, and arguably, more value for money (VFM) than conventional procurement for the public (HM Treasury 1995, 2000, 2003a and 2003b). However, recent empirical research in the UK on PFI has indicated its potential limitations for accountability and VFM (Broadbent, Gill and Laughlin, 2004; Edwards, Shaoul, Stafford and Arblaster, 2004; Shaoul, 2005; and Ismail and Pendlebury, 2006) albeit these are based on either published accounts or a limited number of key stakeholders. This paper attempts to partially redress this gap in the literature by presenting an interesting case of the impact of PFI on accountability and VFM in Northern Ireland's education sector. The findings of this research, based on forty two interviews with a wide range of key stakeholders, suggest that stakeholders have different and often conflicting expectations and the actual PFI accountability and VFM benefits are much more obfuscated than those claimed in Government publications.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We propose a simple and flexible framework for forecasting the joint density of asset returns. The multinormal distribution is augmented with a polynomial in (time-varying) non-central co-moments of assets. We estimate the coefficients of the polynomial via the Method of Moments for a carefully selected set of co-moments. In an extensive empirical study, we compare the proposed model with a range of other models widely used in the literature. Employing a recently proposed as well as standard techniques to evaluate multivariate forecasts, we conclude that the augmented joint density provides highly accurate forecasts of the “negative tail” of the joint distribution.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is an implicit assumption in the UK Treasury’s publications on public-private partnerships (PPP) – also more commonly known in the United Kingdom as private finance initiative (PFI) - that accountability and value for money (VFM) are related concepts. While recent academic studies on PPP/PFI (from now on as PFI) have focused on VFM, there is a notable absence of studies exploring the ‘presumed’ relationships between accountability and VFM. Drawing on Dubnick’s (Dubnick and Romzek, 1991, 1993; Dubnick, 1996, 1998, 2003, 2005; Dubnick and Justice, 2002) framework for accountability and PFI literature, we develop a research framework for exploring potential relationships between accountability and VFM in PFI projects by proposing alternative accountability cultures, processes and mechanisms for PFI. The PFI accountability model is then exposed to four criteria - warrantability, tractability, measurability and feasibility. Our preliminary interviews provide us guidance in identifying some of the cultures, processes and mechanisms indicated in our model which should enable future researchers to test not only the UK Government’s claimed relationships between accountability and VFM using more specific PFI empirical data, but also a potential relationship between accountability and performance in general.