43 resultados para project management tools

em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The ability of building information modeling (BIM) to positively impact projects in the AEC through greater collaboration and integration is widely acknowledged. This paper aims to examine the development of BIM and how it can contribute to the cold-formed steel (CFS) building industry. This is achieved through the adoption of a qualitative methodology encompassing a literature review, exploratory interviews with industry experts, culminating in the development of e-learning material for the sector. In doing so, the research team have collaborated with one of the United Kingdom’s largest cold-formed steel designer/fabricators. By demonstrating the capabilities of BIM software and providing technical and informative videos in its creation, this project has found two key outcomes. Firstly, to provide invaluable assistance in the transition from traditional processes to a fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. Secondly, to demonstrate BIM’s potential not only within CFS companies, but also within the AEC sector as a whole. As the flexibility, adaptability and interoperability of BIM software is alluded to, the results indicate that the introduction and development of BIM and the underlying ethos suggests that it is a key tool in the development of the industry as a whole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Large construction projects create numerous hazards, making it one of the most dangerous industries in which to work. This element of risk increases in urban areas and can have a negative impact on the external stakeholders associated with the project, along with their surrounding environments. The aim of this paper is to identify and document, in an urban context, the numerous issues encountered by on-site project managers from external stakeholders and how they affect a construction project. In addressing this aim, the core objective is to identify what issues are involved in the management of these stakeholders. In order to meet this requirement, a qualitative methodology encompassing an informative literature review followed by five individual case study interviews. The data gathered is assessed qualitatively using mind mapping software. A number of issues are identified which have an impact on the external stakeholders involved, and also how they affected proceedings on site. Collectively the most commonly occurring issues are environmental, legal, health and safety and communication issues. These ranged from road closures and traffic disruption to noise, dust and vibrations from site works. It is anticipated that the results of this study will assist and aid project managers in identifying issues considering external stakeholders, particularly on urban construction projects. A wide range of issues can develop depending on the complexity and nature of each project, but this research will illustrate and reinforce to project managers, that identifying issues early, effective communication and appropriate liaising can be used to manage the issues considering external stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Few studies to date have paid attention to relationship management when addressing performance problems. To bridge the knowledge gap, a questionnaire survey is conducted to analyze the impact of relationship management on project performance in construction. The analysis reveals that the deterioration of working relationships may increase the likelihood of poor performance. Poor performance can be effectively reduced by improving some aspects of working relationships. Collaborative working contributes to performance improvement, in which long-term collaboration is more effective than short-term collaboration. In addition to the questionnaire survey, a series of expert interviews provide a deeper insight into effective relationship management.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to focus on the growing interest of the role of business in society, commonly referred to as CSR. Historically CSR can be traced back to the 1950s, although in very recent times there has been a virtual explosion of interest in its use and applicability in organisations. However, there are many unresolved issues, most notably in terms of how CSR should or can be implemented and embedded in an organisation. This paper therefore seeks to explore the relationship and potential synergies between quality management and CSR. Design/methodology/approach – The qualitative exploratory study in this paper represents the first stage of an ongoing research programme, and is based on an in-depth analysis of quality award submission documentation from six case organisations that have recently been recognised as winners in relation to their quest for business improvement. Findings – The paper finds that substantial evidence from each of the case organisations demonstrates the breadth and depth of activities in which they are engaging under the broad headings of workplace, environment, social impact, and economic impact. However, whilst there is no doubting the sincerity of the actions, the approaches and activities, a strategic focus on CSR is still very much in its infancy. Research limitations/implications – In this paper there is a paucity of empirical research examining how existing management tools, techniques and methodologies can be used to further the CSR debate. This paper represents an important first step in redressing this imbalance. Practical implications – The paper suggests that the quality management and business excellence frameworks can offer a strong foundation from which to develop CSR strategies, behaviours and activities in an organisation. Originality/value – This paper represents an important first step in understanding how and where CSR “fits” into an organisation and potentially how existing quality methodologies, tools and frameworks can be used to aid the implementation of CSR.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This case study examines how the lean ideas behind the Toyota production system can be applied to software project management. It is a detailed investigation of the performance of a nine-person software development team employed by BBC Worldwide based in London. The data collected in 2009 involved direct observations of the development team, the kanban boards, the daily stand-up meetings, semistructured interviews with a wide variety of staff, and statistical analysis. The evidence shows that over the 12-month period, lead time to deliver software improved by 37%, consistency of delivery rose by 47%, and defects reported by customers fell 24%. The significance of this work is showing that the use of lean methods including visual management, team-based problem solving, smaller batch sizes, and statistical process control can improve software development. It also summarizes key differences between agile and lean approaches to software development. The conclusion is that the performance of the software development team was improved by adopting a lean approach. The faster delivery with a focus on creating the highest value to the customer also reduced both technical and market risks. The drawbacks are that it may not fit well with existing corporate standards.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

To date, the processing of wildlife location data has relied on a diversity of software and file formats. Data management and the following spatial and statistical analyses were undertaken in multiple steps, involving many time-consuming importing/exporting phases. Recent technological advancements in tracking systems have made large, continuous, high-frequency datasets of wildlife behavioral data available, such as those derived from the global positioning system (GPS) and other animal-attached sensor devices. These data can be further complemented by a wide range of other information about the animals’ environment. Management of these large and diverse datasets for modelling animal behaviour and ecology can prove challenging, slowing down analysis and increasing the probability of mistakes in data handling. We address these issues by critically evaluating the requirements for good management of GPS data for wildlife biology. We highlight that dedicated data management tools and expertise are needed. We explore current research in wildlife data management. We suggest a general direction of development, based on a modular software architecture with a spatial database at its core, where interoperability, data model design and integration with remote-sensing data sources play an important role in successful GPS data handling.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.

Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.

Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.

Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.

Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.