178 resultados para nest building
em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast
Resumo:
In male birds, the gonadal hormone testosterone (T) is known to influence territorial and mating behaviour. Plasma levels of T show seasonal fluctuations which vary in relation to mating system and social instability. First, we determined the natural T profile of male blue tits Parus caeruleus during the breeding season. We found that plasma levels of T increased at the onset of nest building. Thus, the increase in circulating T was not associated with territory establishment, nor with the fertile period of the males' mates. In most individuals, T levels dropped to values close to zero during the period of chick feeding. Second, we investigated the relationship between plasma levels of T and male age, size, and singing behaviour. During the mating period, T levels did not differ between 1 yr old and older males and did not correlate with body size or condition. However, song output during the dawn chorus tended to be positively correlated with T levels. Therefore, if high T levels are costly, song output might be an honest indicator of male quality in blue tits. Finally, we show that plasma levels of T are significantly higher during the night than during the day. This pattern has also been observed in captive non-passerine birds, but its functional significance remains unknown.
Resumo:
Evolutionary conflicts among social hymenopteran nestmates are theoretically likely to arise over the production of males and the sex ratio. Analysis of these conflicts has become an important focus of research into the role of kin selection in shaping social traits of hymenopteran colonies. We employ microsatellite analysis of nestmates of one social hymenopteran, the primitively eusocial and monogynous bumblebee Bombus hypnorum, to evaluate these conflicts. In our 14 study colonies, B. hypnorum queens mated between one and six times (arithmetic mean 2.5). One male generally predominated, fathering most of the offspring, thus the effective number of matings was substantially lower (1–3.13; harmonic mean 1.26). In addition, microsatellite analysis allowed the detection of alien workers, those who could not have been the offspring of the queen, in approximately half the colonies. Alien workers within the same colony were probably sisters. Polyandry and alien workers resulted in high variation among colonies in their sociogenetic organization. Genetic data were consistent with the view that all males (n = 233 examined) were produced by a colony’s queen. Male parentage was therefore independent of the sociogenetic organization of the colony, suggesting that the queen, and not the workers, was in control of the laying of male-destined eggs. The population-wide sex ratio (fresh weight investment ratio) was weakly female biased. No evidence for colony-level adaptive sex ratio biasing could be detected.
Resumo:
A series of short and long term service load tests were undertaken on the sixth floor of the full-scale, seven storey, reinforced concrete building at the Large Building Test Facility of the Building Research Establishment at Cardington. By using internally strain gauged reinforcing bars cast into an internal and external floor bay during the construction process it was possible to gain a detailed record of slab strains resulting from the application of several arrangements of test loads. Short term tests were conducted in December 1998 and long term monitoring then ensued until April 2001. This paper describes the test programmes and presents results to indicate slab behaviour for the various loading regimes.
Resumo:
Abstract: Purpose – The aim of this paper is to examine and compare the performance of architects with respect to clients' rating of importance over a set of performance criteria in Nigerian public and private sector building projects. Design/methodology/approach – A survey involving clients from both public and private sectors of recently completed building projects in Nigeria was undertaken. Data analysis includes comparing similarities and differences using standardised ratio, Mann Whitney U and Wilcoxon tests. Findings – The results show that private sector clients are likely to be more concerned with cost, while public sector clients are more concerned with buildability of design. A total of 79 per cent of the criteria were similarly selected by both sectors with respect to importance of the criteria. Architects need to improve their performance significantly in about 82 per cent of the whole set of 28 criteria. The architects performed better in the public sector than the private sector and 14 per cent of the criteria were indicated as being statistically different in terms of architects' performance. Originality/value – The results provide feedback which can be incorporated in architects' future projects so as to ensure successful project implementation in the building delivery process.
Resumo:
The overall intent of this research is to provide architects with information that can be used to improve their performance so as to optimally satisfy the client's requirements and achieve high-quality overall project performance in Nigerian construction industry. Architect performance criteria were identified based on literature within the domain of architect responsibilities. The assessment of architects’ performance was carried out through a questionnaire survey of clients of recently completed building projects in Nigeria. Analysis of data includes comparison of criteria using importance–performance index analysis. Factor analysis was carried out on criteria where architects are falling below average, to group and explore the latent structure of the criteria in the data. The results showed that the architect needs to focus on management skills and ability, buildability, design quality, project communication, project integration and client focus. These results would encourage architects to perform better within their full responsibilities in the building delivery process and deliver high-quality projects within Nigerian construction industry.