34 resultados para management of design and scope definition
em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast
Resumo:
The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.
Resumo:
There is a requirement for better integration between design and analysis tools, which is difficult due to their different objectives, separate data representations and workflows. Currently, substantial effort is required to produce a suitable analysis model from design geometry. Robust links are required between these different representations to enable analysis attributes to be transferred between different design and analysis packages for models at various levels of fidelity.
This paper describes a novel approach for integrating design and analysis models by identifying and managing the relationships between the different representations. Three key technologies, Cellular Modeling, Virtual Topology and Equivalencing, have been employed to achieve effective simulation model management. These technologies and their implementation are discussed in detail. Prototype automated tools are introduced demonstrating how multiple simulation models can be linked and maintained to facilitate seamless integration throughout the design cycle.
Resumo:
This note develops a behavioral framework to classify individual contingent valuation (CV) respondents in terms of the warm glow and altruistic motives in their WTP responses. We suggest that at least five possible behavioral categories for CV responses may exist, depending on the type of underlying preferences and whether respondents are satiated or non-satiated with respect to the good. An empirical example suggests that the warm glow motive may be present in the majority of bids, although its presence does not necessarily preclude scope sensitivity to the quantity/quality of an environmental good. (C) 2000 Elsevier Science B.V. All rights reserved.
Resumo:
The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.
Resumo:
In contrast to most empirical investigations of the efficiency of multiproduct financial institutions, which either estimate scale and scope economies with a given state of technology, or only analyse technical change in the presence of overall scale economies, this study estimates overall scale economies, product-specific scale economies and scope economies in the presence of both neutral and non-neutral technical change. Also, in contrast to most other empirical studies in this area, standard errors are computed for all relevant statistics. The findings indicate diseconomies of scope; overall diseconomies of scale; product-specific economies are decreasing for investments and increasing for loans; in addition to substantial neutral technical change, biased technical change is labour- and capital-saving and deposits-using in character.
Resumo:
An erythrocytosis occurs when there is an increased red-cell mass. The causes of erythrocytosis are divided into primary, when there is an intrinsic defect in the erythroid cell, and secondary, when the cause is extrinsic to the erythroid cell. An idiopathic erythrocytosis occurs when the increased red-cell mass has no identifiable cause. Primary and secondary defects can be further classified as either congenital or acquired causes. The diagnostic pathway starts with a careful history and examination followed by measurement of the erythropoietin (EPO) levels. This allows a division of those patients with a low EPO level, who can then be investigated for primary causes of erythrocytosis, and those with a normal or high EPO level, where the oxygen-sensing pathway needs to be explored further. Physiological studies in those with congenital defects in the oxygen-sensing pathway show many changes in the downstream metabolism adapting to the defect, which has a bearing on the management of the disorders. Low-dose aspirin and venesection to an achievable target are the main therapeutic options that can be considered in the management of erythrocytosis. Specific guidance on venesection options should be considered with certain causes such as high oxygen-affinity hemoglobins.
Resumo:
This paper details the implementation and operational performance of a minimum-power 2.45-GHz pulse receiver and a companion on-off keyed transmitter for use in a semi-active duplex RF biomedical transponder. A 50-Ohm microstrip stub-matched zero-bias diode detector forms the heart of a body-worn receiver that has a CMOS baseband amplifier consuming 20 microamps from +3 V and achieves a tangential sensitivity of -53 dBm. The base transmitter generates 0.5 W of peak RF output power into 50 Ohms. Both linear and right-hand circularly polarized Tx-Rx antenna sets were employed in system reliability trials carried out in a hospital Coronary Care Unit, For transmitting antenna heights between 0.3 and 2.2 m above floor level, transponder interrogations were 95% reliable within the 67-m-sq area of the ward, falling to an average of 46 % in the surrounding rooms and corridors. Overall, the circular antenna set gave the higher reliability and lower propagation power decay index.
Resumo:
These guidelines provide a practical and evidence-based resource for the management of patients with Barrett's oesophagus and related early neoplasia. The Appraisal of Guidelines for Research and Evaluation (AGREE II) instrument was followed to provide a methodological strategy for the guideline development. A systematic review of the literature was performed for English language articles published up until December 2012 in order to address controversial issues in Barrett's oesophagus including definition, screening and diagnosis, surveillance, pathological grading for dysplasia, management of dysplasia, and early cancer including training requirements. The rigour and quality of the studies was evaluated using the SIGN checklist system. Recommendations on each topic were scored by each author using a five-tier system (A+, strong agreement, to D+, strongly disagree). Statements that failed to reach substantial agreement among authors, defined as >80% agreement (A or A+), were revisited and modified until substantial agreement (>80%) was reached. In formulating these guidelines, we took into consideration benefits and risks for the population and national health system, as well as patient perspectives. For the first time, we have suggested stratification of patients according to their estimated cancer risk based on clinical and histopathological criteria. In order to improve communication between clinicians, we recommend the use of minimum datasets for reporting endoscopic and pathological findings. We advocate endoscopic therapy for high-grade dysplasia and early cancer, which should be performed in high-volume centres. We hope that these guidelines will standardise and improve management for patients with Barrett's oesophagus and related neoplasia.
Resumo:
PURPOSE:
To assess the noneconomic value of tests used in the diagnosis and management of glaucoma, and explore the contexts and factors that determine such value.
DESIGN:
Perspective.
METHODS:
Selected articles from primary and secondary sources were reviewed and interpreted in the context of the authors' clinical and research experience, influenced by our perspectives on the tasks of reducing the global problem of irreversible blindness caused by glaucoma. The value of any test used in glaucoma is addressed by 3 questions regarding: its contexts, its kind of value, and its implicit or explicit benefits.
RESULTS:
Tonometry, slit-lamp gonioscopy, and optic disc evaluation remain the foundation of clinic-based case finding, whether in areas of more or less abundant resources. In resource-poor areas, there is urgency in identifying patients at risk for severe functional loss of vision; screening strategies have proven ineffective, and efforts are hindered by the inadequate allocation of support. In resource-abundant areas, the wider spectrum of glaucoma is addressed, with emphasis on early detection of structural changes of little functional consequence; these are increasingly the focus of new and expensive technologies whose clinical value has not been established in longitudinal and population-based studies. These contrasting realities in part reflect differences among the value ascribed, often implicitly, to the tests used in glaucoma.
CONCLUSIONS:
The value of any test is determined by 3 aspects: its context of usage; its comparative worth and to whom its benefit accrues; and how we define historically what we are testing. These multiple factors
Resumo:
The objective of this paper is to identify the various managerial constraints, difficulties and issues encountered and resulting strategies adopted, to aid in the management of the various and often complex health and safety concerns, which occur within a confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, to ensure the successful management of such confined environments within the realm of health and safety. Through an extensive literature review and detailed interviews, a comprehensive insight into the health and safety concerns within a confined construction site environment is portrayed. The leading managerial strategies to the management of health and safety on confined construction sites may be listed as follows; (1) Traffic Management Plan, (2) Effective Resource Management Plan, (3) Temporary Facilities Management Plan, (4) Safe System of Work Plan, (5) Site Safety Plan, (6) Design Site Layout, (7) Space Management Plan, (8) Effective Program Management, and (9) Space Scheduling. Based on the research, it can be concluded, that through effective management of these issues identified coupled with implementing the various strategies highlighted; successful management of health and safety within a confined construction site environment is attainable.