53 resultados para dynamic performance appraisal
em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast
Resumo:
This article offers a replication for Britain of Brown and Heywood's analysis of the determinants of performance appraisal in Australia. Although there are some important limiting differences between our two datasets - the Australia Workplace Industrial Relations Survey (AWIRS) and the Workplace Employment Relations Survey (WERS) - we reach one central point of agreement and one intriguing shared insight. First, performance appraisal is negatively associated with tenure: where employers cannot rely on the carrot of deferred pay or the stick of dismissal to motivate workers, they will tend to rely more on monitoring, ceteris paribus. Second, employer monitoring and performance pay may be complementary. However, consonant with the disparate results from the wider literature, there is more modest agreement on the contribution of specific human resource management practices, and still less on the role of job control.
Resumo:
This paper presents a predictive current control strategy for doubly-fed induction generators (DFIG). The method predicts the DFIG’s rotor current variations in the synchronous reference frame fixed to the stator flux within a fixed sampling period. This is then used to directly calculate the required rotor voltage to eliminate the current errors at the end of the following sampling period. Space vector modulation is used to generate the required switching pulses within the fixed sampling period. The impact of sampling delay on the accuracy of the sampled rotor current is analyzed and detailed compensation methods are proposed to improve the current control accuracy and system stability. Experimental results for a 1.5 kW DFIG system illustrate the effectiveness and robustness of the proposed control strategy during rotor current steps and rotating speed variation. Tests during negative sequence current injection further demonstrate the excellent dynamic performance of the proposed PCC method.
Resumo:
Parallel robot (PR) is a mechanical system that utilized multiple computer-controlled limbs to support one common platform or end effector. Comparing to a serial robot, a PR generally has higher precision and dynamic performance and, therefore, can be applied to many applications. The PR research has attracted a lot of attention in the last three decades, but there are still many challenging issues to be solved before achieving PRs’ full potential. This chapter introduces the state-of-the-art PRs in the aspects of synthesis, design, analysis, and control. The future directions will also be discussed at the end.
Resumo:
Models of ground source heat pump (GSHP) systems are used as an aid for the correct design and optimization of the system. For this purpose, it is necessary to develop models which correctly reproduce the dynamic thermal behavior of each component in a short-term basis. Since the borehole heat exchanger (BHE) is one of the main components, special attention should be paid to ensuring a good accuracy on the prediction of the short-term response of the boreholes. The BHE models found in literature which are suitable for short-term simulations usually present high computational costs. In this work, a novel TRNSYS type implementing a borehole-to-ground (B2G) model, developed for modeling the short-term dynamic performance of a BHE with low computational cost, is presented. The model has been validated against experimental data from a GSHP system located at Universitat Politècnica de València, Spain. Validation results show the ability of the model to reproduce the short-term behavior of the borehole, both for a step-test and under normal operating conditions.
Resumo:
In this paper, we provide experimental evidence to show that enhanced bit error rate (BER) performance is possible using a retrodirective array operating in a dynamically varying multipath environment. The operation of such a system will be compared to that obtained by a conventional nonretrodirective array. The ability of the array to recover amplitude shift keyed encoded data transmitted from a remote location whose position is not known a priori is described. In addition, its ability to retransmit data inserted at the retrodirective array back to a spatially remote beacon location whose position is also not known beforehand is also demonstrated. Comparison with an equivalent conventional fixed beam antenna array utilizing an identical radiating aperture arrangement to that of the retrodirective array are given. These show that the retrodirective array can effectively exploit the presence of time varying multipath in order to give significant reductions in BER over what can be otherwise achieved. Additionally, the retrodirective system is shown to be able to deliver low BER regardless of whether line of sight is present or absent.
Resumo:
Complex collaboration in rapidly changing business environments create challenges for management capability in Utility Horizontal Supply Chains (UHSCs) involving the deploying and evolving of performance measures. The aim of the study is twofold. First, there is a need to explore how management capability can be developed and used to deploy and evolve Performance Measurement (PM), both across a UHSC and within its constituent organisations, drawing upon a theoretical nexus of Dynamic Capability (DC) theory and complementary Goal Theory. Second, to make a contribution to knowledge by empirically building theory using these constructs to show the management motivations and behaviours within PM-based DCs. The methodology uses an interpretive theory building, multiple case based approach (n=3) as part of a USHC. The data collection methods include, interviews (n=54), focus groups (n=10), document analysis and participant observation (reflective learning logs) over a five-year period giving longitudinal data. The empirical findings lead to the development of a conceptual framework showing that management capabilities in driving PM deployment and evolution can be represented as multilevel renewal and incremental Dynamic Capabilities, which can be further understood in terms of motivation and behaviour by Goal-Theoretic constructs. In addition three interrelated cross cutting themes of management capabilities in consensus building, goal setting and resource change were identified. These management capabilities require carefully planned development and nurturing within the UHSC.
Resumo:
Presented is a study that expands the body of knowledge on the effect of in-cycle speed fluctuations on performance of small engines. It uses the engine and drivetrain models developed previously by Callahan, et al. (1) to examine a variety of engines. The predicted performance changes due to drivetrain effects are shown in each case, and conclusions are drawn from those results. The single-cylinder, high performance four-stroke engine showed significant changes in predicted performance compared to the prediction with zero speed fluctuation in the model. Measured speed fluctuations from a firing Yamaha YZ426 engine were applied to the simulation in addition to data from a simple free mass model. Both methods predicted similar changes in performance. The multiple-cylinder, high performance two-stroke engine also showed significant changes in performance depending on the firing configuration. With both engines, the change in performance diminished with increasing mean engine speed. The low output, single-cylinder two-stroke engine simulation showed only a negligible change in performance, even with high amplitude speed fluctuations. Because the torque versus engine speed characteristic for the engine was so flat, this was expected. The cross-charged, multi-cylinder two-stroke engine also showed only a negligible change in performance. In this case, the combination of a relatively high inertia rotating assembly and the multiple cylinder firing events within the revolution smoothing the torque pulsations reduced the speed fluctuation amplitude itself.
Resumo:
Purpose The aim of this paper is to explore the issues involved in developing and applying performance management approaches within a large UK public sector department using a multiple stakeholder perspective and an accompanying theoretical framework. Design/methodology/approach An initial short questionnaire was used to determine perceptions about the implementation and effectiveness of the new performance management system across the organisation. In total, 700 questionnaires were distributed. Running concurrently with an ethnographic approach, and informed by the questionnaire responses, was a series of semi-structured interviews and focus groups. Findings Staff at all levels had an understanding of the new system and perceived it as being beneficial. However, there were concerns that the approach was not continuously managed throughout the year and was in danger of becoming an annual event, rather than an ongoing process. Furthermore, the change process seemed to have advanced without corresponding changes to appraisal and reward and recognition systems. Thus, the business objectives were not aligned with motivating factors within the organisation. Research limitations/implications Additional research to test the validity and usefulness of the theoretical model, as discussed in this paper, would be beneficial. Practical implications The strategic integration of the stakeholder performance measures and scorecards was found to be essential to producing an overall stakeholder-driven strategy within the case study organisation. Originality/value This paper discusses in detail the approach adopted and the progress made by one large UK public sector organisation, as it attempts to develop better relationships with all of its stakeholders and hence improve its performance. This paper provides a concerted attempt to link theory with practice.