135 resultados para design and operation

em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Received for publication October 31, 2002. Design and operation of Fe0 permeable reactive barriers (PRBs) can be improved by understanding the long-term mineralogical transformations that occur within PRBs. Changes in mineral precipitates, cementation, and corrosion of Fe0 filings within an in situ pilot-scale PRB were examined after the first 30 months of operation and compared with results of a previous study of the PRB conducted 15 months earlier using X-ray diffraction and scanning electron microscopy employing energy dispersive X-ray and backscatter electron analyses. Iron (oxy)hydroxides, aragonite, and maghemite and/or magnetite occurred throughout the cores collected 30 mo after installation. Goethite, lepidocrocite, mackinawite, aragonite, calcite, and siderite were associated with oxidized and cemented areas, while green rusts were detected in more reduced zones. Basic differences from our last detailed investigation include (i) mackinawite crystallized from amorphous FeS, (ii) aragonite transformed into calcite, (iii) akaganeite transformed to goethite and lepidocrocite, (iv) iron (oxy)hydroxides and calcium and iron carbonate minerals increased, (v) cementation was greater in the more recent study, and (vi) oxidation, corrosion, and disintegration of Fe0 filings were greater, especially in cemented areas, in the more recent study. If the degree of corrosion and cementation that was observed from 15 to 30 mo after installation continues, certain portions of the PRB (i.e., up-gradient entrance of the ground water to the Fe0 section of the PRB) may last less than five more years, thus reducing the effectiveness of the PRB to mitigate contaminants. Abbreviations: EDX, energy dispersive X-ray • Fe0, zerovalent iron • PRB, permeable reactive barrier • SEM, scanning electron microscopy • XRD, X-ray diffraction

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The School of Mechanical and Aerospace Engineering at Queen’s University Belfast introduced a new degree programme in Product Design and Development (PDD) in 2004. As well as setting out to meet all UK-SPEC requirements, the entirely new curriculum was developed in line with the syllabus and standards defined by the CDIO Initiative, an international collaboration of universities aiming to improve the education of engineering students. The CDIO ethos is that students are taught in the context of conceiving, designing, implementing and operating a product or system. Fundamental to this is an integrated curriculum with multiple Design-Build-Test (DBT) experiences at the core. Unlike most traditional engineering courses the PDD degree features group DBT projects in all years of the programme. The projects increase in complexity and challenge in a staged manner, with learning outcomes guided by Bloom’s taxonomy of learning domains. The integrated course structure enables the immediate application of disciplinary knowledge, gained from other modules, as well as development of professional skills and attributes in the context of the DBT activity. This has a positive impact on student engagement and the embedding of these relevant skills, identified from a stakeholder survey, has also been shown to better prepare students for professional practice. This paper will detail the methodology used in the development of the curriculum, refinements that have been made during the first five years of operation and discuss the resource and staffing issues raised in facilitating such a learning environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Design and operation of Fe0 permeable reactive barriers (PRBs) can be improved by understanding the long-term mineralogical transformations that occur within PRBs. Changes in mineral precipitates, cementation, and corrosion of Fe0 filings within an in situ pilot-scale PRB were examined after the first 30 months of operation and compared with results of a previous study of the PRB conducted 15 months earlier using X-ray diffraction and scanning electron microscopy employing energy dispersive X-ray and backscatter electron analyses. Iron (oxy)hydroxides, aragonite, and maghemite and/or magnetite occurred throughout the cores collected 30 mo after installation. Goethite, lepidocrocite, mackinawite, aragonite, calcite, and siderite were associated with oxidized and cemented areas, while green rusts were detected in more reduced zones. Basic differences from our last detailed investigation include (i) mackinawite crystallized from amorphous FeS, (ii) aragonite transformed into calcite, (iii) akaganeite transformed to goethite and lepidocrocite, (iv) iron (oxy)hydroxides and calcium and iron carbonate minerals increased, (v) cementation was greater in the more recent study, and (vi) oxidation, corrosion, and disintegration of Fe0 filings were greater, especially in cemented areas, in the more recent study. If the degree of corrosion and cementation that was observed from 15 to 30 mo after installation continues, certain portions of the PRB (i.e., up-gradient entrance of the ground water to the Fe0 section of the PRB) may last less than five more years, thus reducing the effectiveness of the PRB to mitigate contaminants.

Relevância:

100.00% 100.00%

Publicador: