5 resultados para construction productivity

em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Inner city, confined site construction is quickly becoming the norm within the construction sector. The aim of this paper is to identify and document the effect, if any, that a confined construction site environment has on the productivity of on-site personnel. In order to compile the relevant information and attain appropriate results on the matter in question, a qualitative analytical approach is adopted. This process incorporates multiple cases studies from Ireland, Northern Ireland and USA. From the resulting case studies, a minimum of three individual interviews and focus group seminars are conducted to aid in the collection of the data while also assisting in the confirmation of the factors identified from a critique of the relevant literature. From the resulting case studies and discussions, a list of the key issues pertaining to the on-site productivity of personnel emerged and is documented as follows; 1) Overcrowding of personnel at workstations, 2) Lack of space for the effective movement of personnel on-site, 3) Numerous trades working within the one space on-site. Through identifying the issues highlighted and proactively mitigating or eliminating the factors detailed, on-site management professionals can strive to ensure maximum productivity from the industry’s most important resource – people.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Construction Design and Management (CDM) Regulations (2007) is one of the most important set of health and safety regulations in the construction industry today. The aim of this research is to examine critical success factors for CDM compliance in small to medium size contractors in the UK construction industry. The objectives of the research include the identification of critical barriers in doing so along with the identification of success factors where CDM is incorporated. A mixed method approach is adopted in the identification and categorisation of the various factors encompassing a literature review, interviews and questionnaire survey. The key finding which emerge is the lack of knowledge and understanding with regards the CDM regulations with the recommendation to encourage small and medium contractor compliance through illustrating the benefits attainable. The practicality of the research is evident based on the significant uptake in the CDM by larger contractors, yet the research indicates that further insight and guidance is required to educate and inform those working within small to medium sized contractors in the UK. Where such acknowledgement and compliance is adopted, it is envisaged that this sector will benefit from reduced incidents and accidents, increased productivity while ultimately leading to a safer and more productive industry as a whole.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.