3 resultados para WIP-Vrp1

em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast


Relevância:

20.00% 20.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Patients often spend time as inpatients in hospitals outside their home area because of the need to access specialist services. If there is a need for ongoing care after the need for specialist care has passed, patients are transferred (or ‘repatriated’) back to the inpatient care of a hospital in their local Health and Social Care Trust. The need for bed space in specialist units means that there is pressure for this transition to occur in a timely way. We investigated the flow of patients through a trauma and orthopaedics unit using the 6M Design® framework and Vitals Charts® in order to investigate concerns about delayed repatriation. We found that repatriation was part of a complex system that had interdependent components. There was considerable variation in the number of discharges (to any destination) by day of week, with a reduction on Saturdays and Sundays. Understanding that the pressure for quicker repatriation was really due to high work-in-progress led us to model the effects of strategies to address the high work-in-progress. We found that, because only a small proportion of patients require repatriation, expediting the repatriation process by one day for each patient would only reduce WIP by an average of 1.6 patients. Reducing the average length of stay for all trauma and orthopaedics inpatients by one day would reduce the WIP by 10 patients, which would make a much greater impact on the problem of high bed occupancy. Though the smooth and timely repatriation of patients to rehabilitation units is desirable, it is unlikely that efforts to achieve this will have a substantial impact on the problem of high WIP, so other strategies will be required. We will model the effects of strategies to reduce variation in daily discharges by the day of week in a future essay.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Supply Chain Simulation (SCS) is applied to acquire information to support outsourcing decisions but obtaining enough detail in key parameters can often be a barrier to making well informed decisions.
One aspect of SCS that has been relatively unexplored is the impact of inaccurate data around delays within the SC. The impact of the magnitude and variability of process cycle time on typical performance indicators in a SC context is studied.
System cycle time, WIP levels and throughput are more sensitive to the magnitude of deterministic deviations in process cycle time than variable deviations. Manufacturing costs are not very sensitive to these deviations.
Future opportunities include investigating the impact of process failure or product defects, including logistics and transportation between SC members and using alternative costing methodologies.