42 resultados para Rationalization of construction

em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The use of recycled aggregates has increased greatly over the last decade owing to enhanced environmental sensitivities. The level of performance required by such materials is dependent upon the applications for which they are used. Many recycled construction wastes have adequate shear strength in relation to various geotechnical applications. However, a possible drawback of these materials is the risk of crushing during repeated loading. The work reported in this paper examined two waste materials: crushed concrete and building debris, both regarded as construction wastes. Tests were also performed on traditionally used crushed rock, in this case basalt. The materials were subjected to repeated loading in a large direct shear apparatus. The amount of crushing was quantified by performing particle size analysis of the tested material. The results have shown that both recycled construction wastes were susceptible to particle crushing. The amount of crushing was influenced by both the vertical pressure and the number of loading cycles. This leads to a marked decrease in peak friction angle

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The maintenance or even replacement of cracked pavements requires considerable financial resources and puts a large burden on the budgets of local councils. In addition to these costs, local councils also face liability claims arising from uneven or cracked pedestrian pavements. These currently cost the Manchester City Council and Preston City Council around £6 million a year each. Design procedures are empirical. A better understanding of the interaction between paving blocks, bedding sand and subbase was necessary in order to determine the mode of failure of pavements under load. Increasing applied stress was found to mobilise ‘‘rotational interlock’’, providing increased pavement stiffness and thus increased load dissipation resulting in lower transmitted stress on the subgrade. The indications from the literature
review were that pavements are designed to fail by excessive deformation and that paving blocks remained uncracked at failure. This was confirmed with experimental data which was obtained from tests on segments of pavements that were laid/constructed in a purpose built test frame in the laboratory.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research concentrates on the critical success factors driving construction quality and the barriers that must be overcome to achieve quality in Brunei. It hopes to identify methods of quality improvement and clearly justify investment in this area of local industry. Over the past number of years, Brunei has attempted to diversify its industry from the dominant oil and gas sector into secondary sectors,
including construction. To date, very little research has been carried out in many areas of construction management that take into account the specific industry context in Brunei. A comprehensive literature review has been employed to enable a questionnaire to be constructed and distributed among Brunei construction
professionals. The results have been analyzed through mean testing. This analysis reveals that the key barriers to construction quality in Brunei relate to lack of skills, lack of clarity in responsibility and communication and poor commitment among the design team. The critical success factors include issues relating to competency, capability, commitment and effectiveness, primarily among managers and decision-makers. The results of this study will hopefully contribute to fill the knowledge gap related to construction management in the context of Brunei and facilitate movement towards improved techniques and strategies that will foster higher quality in construction. The findings can be generalised across similar
developing economies and it is suggested that in general, the management concepts governing construction quality remain similar across the borders of East and West.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, we present an investigation into using fuzzy methodologies to guide the construction of high quality feasible examination timetabling solutions. The provision of automated solutions to the examination timetabling problem is achieved through a combination of construction and improvement. The enhancement of solutions through the use of techniques such as metaheuristics is, in some cases, dependent on the quality of the solution obtained during the construction process. With a few notable exceptions, recent research has concentrated on the improvement of solutions as opposed to focusing on investigating the ‘best’ approaches to the construction phase. Addressing this issue, our approach is based on combining multiple criteria in deciding on how the construction phase should proceed. Fuzzy methods were used to combine three single construction heuristics into three different pair wise combinations of heuristics in order to guide the order in which exams were selected to be inserted into the timetable solution. In order to investigate the approach, we compared the performance of the various heuristic approaches with respect to a number of important criteria (overall cost penalty, number of skipped exams, number of iterations of a rescheduling procedure required and computational time) on twelve well-known benchmark problems. We demonstrate that the fuzzy combination of heuristics allows high quality solutions to be constructed. On one of the twelve problems we obtained lower penalty than any previously published constructive method and for all twelve we obtained lower penalty than when any of the single heuristics were used alone. Furthermore, we demonstrate that the fuzzy approach used less backtracking when constructing solutions than any of the single heuristics. We conclude that this novel fuzzy approach is a highly effective method for heuristically constructing solutions and, as such, has particular relevance to real-world situations in which the construction of feasible solutions is often a difficult task in its own right.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this study is to explore the formative development of construction supply chain guidelines or proposals in a UK region’s schools’ estates procurement process to more effectively address a forthcoming increase in investment.

Design/methodology/approach – The research approach is interpretive. Using an action research approach, repeated semi-structured interviews and focus groups with a range of stakeholders are conducted.

Findings – The current construction supply chain in schools’ estate procurement has many difficulties, not least given the highly fragmented and disconnected nature of the projects. Synergies are being missed and there is little or no continuous improvement. Drawing on these findings, the research iteratively develops a range of proposals and guidelines to address this situation.

Research limitations/implications – This research adds weight to the current focus on pressing for change in the construction industry. It presents potentially valuable insights into the benefits of partnering arrangements and how these might usefully be incorporated into schools’ estate supply chain.

Practical implications – A set of guidelines is developed to guide the public procurement of schools’ estate in a UK region. These guidelines are set within the context of the Modernising and Rethinking Construction agenda.

Originality/value – The action research approach enabled the researchers to gain a unique insight into how public procurement and contractor personnel interact and to establish effective practical guidelines.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.