43 resultados para Parks--Ontario--Planning|vCase studies.
em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast
Resumo:
The potential introduction of third party planning appeals in the UK as a result of the Human Rights Act 1998 has increased interest in those countries that have established third party appeal procedures. The closest of these is the Republic of Ireland, which has had a third party right of appeal since 1963. This paper describes the impact these appeals have had on planning in the Irish Republic by explaining the appeal process, describing past trends and providing background information on the parties that engage in third party appeals. An overall assessment of the Republic’s experience is given and the paper concludes with a few comparative remarks relating this to planning and rights discourse in the UK
Resumo:
There is a perception that teaching space in universities is a rather scarce resource. However, some studies have revealed that in many institutions it is actually chronically under-used. Often, rooms are occupied only half the time, and even when in use they are often only half full. This is usually measured by the ‘utilization’ which is defined as the percentage of available ‘seat-hours’ that are employed. Within real institutions, studies have shown that this utilization can often take values as low as 20–40%. One consequence of such a low level of utilization is that space managers are under pressure to make more efficient use of the available teaching space. However, better management is hampered because there does not appear to be a good understanding within space management (near-term planning) of why this happens. This is accompanied, within space planning (long-term planning) by a lack of experise on how best to accommodate the expected low utilizations. This motivates our two main goals: (i) To understand the factors that drive down utilizations, (ii) To set up methods to provide better space planning. Here, we provide quantitative evidence that constraints arising from timetabling and location requirements easily have the potential to explain the low utilizations seen in reality. Furthermore, on considering the decision question ‘Can this given set of courses all be allocated in the available teaching space?’ we find that the answer depends on the associated utilization in a way that exhibits threshold behaviour: There is a sharp division between regions in which the answer is ‘almost always yes’ and those of ‘almost always no’. Through analysis and understanding of the space of potential solutions, our work suggests that better use of space within universities will come about through an understanding of the effects of timetabling constraints and when it is statistically likely that it will be possible for a set of courses to be allocated to a particular space. The results presented here provide a firm foundation for university managers to take decisions on how space should be managed and planned for more effectively. Our multi-criteria approach and new methodology together provide new insight into the interaction between the course timetabling problem and the crucial issue of space planning.
Resumo:
This article examines the interaction between development control and economic development in the countryside within the context of contemporary debates on shifts in the agricultural sector from productivism to multi-functionality. Using planning application decisions from the case of Northern Ireland for the period 1994–95 to 2005–06, together with insights from high-level key informants with planning, economic development and environmental management expertise, the article critiques a perception that regulatory planning is in line with rural development ambitions to foster a multi-functional countryside. While the quantitative data indicate a high approval rate for economic development projects, the qualitative evidence points to limitations within the policy content and operational practices of the planning system. The article argues that regulatory planning must engage more deeply with rural development objectives.
Resumo:
This study describes a study of 14 software companies, on how they initiate and pre-plan software projects. The aim was to obtain an indication of the range of planning activities carried out. The study, using a convenience sample, was carried out using structured interviews, with questions about early software project planning activities. The study offers evidence that an iterative and incremental development process presents extra difficulties in the case of fixed-contract projects. The authors also found evidence that feasibility studies were common, but generally informal in nature. Documentation of the planning process, especially for project scoping, was variable. For incremental and iterative development projects, an upfront decision on software architecture was shown to be preferred over allowing the architecture to just ‘emerge’. There is also evidence that risk management is recognised but often performed incompletely. Finally appropriate future research arising from the study is described.