18 resultados para Panorama degli idrocarburi in Italia,Giacimenti in mare,Attività minerarie nazionali,Sicurezza offshore
em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast
Resumo:
A search for a submerged jet ski and the lost limb of its driver involved in a collision with a speedboat was made in a shallow lake in Northern Ireland. The location of both was crucial to establishing events at the time of the accident. Local intelligence suggested both objects were likely to be partially-buried by lacustrine silt. To avoid sediment churning, this required non-invasive, completely non-destructive assessment and mapping of the scene. A MALA RAMAC ground-penetrating radar system (GPR) mounted on floats for surveying from walkways and jetties or placed in a small rubber dinghy for offshore profiling was used. A grid was established and each line surveyed with 100, 200 and 400MHz antennae. In waters over 6m deep GPR data showed the form of the lake floor but excessive ringing occurred in the data. In waters less than 6m deep ringing diminished on both 100 and 200MHz data, the latter displaying the best trade-off between depth penetration and horizontal object resolution. 400MHz data failed to be of use in waters over 2m deep and at these depths showed only limited improvement of image quality compared to 200MHz data. Surface objects such as a wooden walkway caused interference on 200 and 400MHz data when antennae were oriented both normal and parallel to survey direction; this may be a function of the low attenuation of radar waves in freshwater, allowing excellent lateral and vertical radar wave penetration. On 200MHz data the damaged jet-ski was clearly imaged in a location that contradicted the speedboat driver's account of the accident.
Resumo:
The MaRINET project aims to build a synergy in the European marine renewable energy development infrastructure network, involving a total of 28 partners across the union. Its scope extends from small to large scale testing, in both tank and field. The main activities of the project are to standardize test procedures, to provide centralized free access for European technology developers, and to innovate for improving test infrastructures and techniques.
This paper presents the work carried in this last part, which focuses on research objectives identified to be current challenges for industrial development. They are distributed in 6 topics. On the one hand are issues that concern directly one of the 3 types of energy scoped in the project: wave, tidal, and offshore wind energy. Two examples are the real time estimation of incident waves, and the measurement of turbulence in tidal flows. On the other hand, collaborative effort is drawn on aspects that are common to those technologies: electrical components, environmental monitoring, and dedicated moorings.
Resumo:
The MaRINET FP7 project aims to build a synergy in the European marine renewable energy development infrastructure network, involving a total of 28 partners across the union. Its scope extends from small to large scale testing, in both tank and field. The main activities of the project are to standardize test procedures, to provide centralized free access for European technology developers, and to innovate for improving test infrastructures and techniques.
Two years to the end of the project, this paper presents an update of the work being carried in this last part. It focuses on research objectives identified to be current challenges for industrial development. They are distributed in 6 topics. On the one hand are issues directly related to one of the 3 types of energy scoped in the project: wave, tidal, and offshore wind. On the other hand, collaborative effort is drawn on aspects that are common to those technologies: electrical components, environmental monitoring, and dedicated moorings.
Theory and validation of new test techniques are presented, for example in the case of non-intrusive wave measurements. This is done in coordination with extensive experimental analysis of the phenomena implying tests, such as nonlinearities in moorings.
Resumo:
In July 2010, the Shanghai Donghai Bridge wind farm, the first commercial offshore wind project was connected to the main grid in China. Three months later, four contracts were handed out to build a total of 1GW wind power capacity in the first round of an offshore concession project by the Chinese central government. At that time, there was a worldwide expectation that Chinese offshore wind power capacity would expand rapidly. However, China only achieved a total offshore wind power installed capacity of 389.2 MW by the end of 2012. This paper studies the recent development of offshore wind power in China by dividing the offshore wind power projects into three categories. This paper presents the difficulties for the Chinese government to achieve its 12th Five Year Plan for offshore wind power. Some policy recommendations to overcome the current difficulties are made in the conclusions.
Resumo:
In the United Kingdom wind power is recognised as the main source of renewable energy to achieve the European Union 2020 renewable energy targets. Currently over 50% of renewable power is generated from onshore wind with a large number of offshore wind projects in development. Recently the government has re-iterated its commitment to offshore wind power and has announced that offshore wind subsidies are to increase from £135/MWh to £140/MWh until 2019. This paper provides a detailed overview of the offshore wind power industry in the United Kingdom in terms of market growth, policy development and offshore wind farm costs. The paper clearly shows that the United Kingdom is the world leader for installed offshore wind power capacity as pro-active policies and procedures have made it the most attractive location to develop offshore wind farm arrays. The key finding is that the United Kingdom has the potential to continue to lead the world in offshore wind power as it has over 48 GW of offshore wind power projects at different stages of operation and development. The growth of offshore wind power in the United Kingdom has seen offshore wind farm costs rise and level off at approximately £3 million/MW, which are higher than onshore wind costs at £1.5–2 million/MW. Considering the recent increase in offshore wind power subsidies and plans for 48 GW of offshore wind power could see more offshore wind power becoming increasingly financially competitive with onshore wind power. Therefore offshore wind power is likely to become a significant source of electricity in the United Kingdom beyond 2020.
Resumo:
Lo scopo del presente lavoro è delineare un nuovo modello inerente l'organizzazione, i processi e gli strumenti di programmazione e controllo a supporto della governance degli enti locali sulle loro aziende di gestione dei servizi pubblici, con particolare attenzione per la variabile strumentale. E' stata adottata una metodologia mista, deduttivo-induttiva. Nella fase deduttiva è stata analizzata la normativa italiana nonché la dottrina economico aziendale nazionale ed internazionale in tema di gestione dei servizi pubblici locali: in tal modo è stato estrapolato un modello normativo-dottrinale inerente l'organizzazione, i processi e gli strumenti di programmazione e controllo a supporto della governance degli enti locali sulle loro aziende di gestione dei servizi pubblici. Nella fase induttiva è stata realizzata un'indagine empirica che ha coinvolto i comuni capoluogo di Emilia-Romagna e Toscana, in modo tale da testare il livello di utilizzo del modello normativo-dottrinale precedentemente estrapolato Nella fase di feedback sono stati delineati i punti di forza e di debolezza del succitato modello emergenti dalla ricerca. Si è così cercato di proporre un nuovo modello, con particolare attenzione per la variabile strumentale, in grado di porre rimedio ai punti di debolezza e di potenziare i punti di forza del modello normativo-dottrinale.
Resumo:
A long-standing economic tradition maintains that labour supply reacts to market tightness; its sensitivity to job quality has received less attention. If firms hire workers with both temporary and open-ended contracts, does participation increase when more permanent jobs are available? We investigate this relationship within a policy evaluation framework; in particular, we examine how labour supply reacted in Italy to a recent subsidy in favour of open-ended contracts. This subsidy increased labour force participation by 1.4% in 2001 and 2.1% in 2002. This increase was concentrated on males aged 35-54, with a low or at most a secondary schooling level.
Resumo:
During various periods of Late Quaternary glaciation, small ice-sheets, -caps, -fields and valley glaciers, occupied the mountains and uplands of Far NE Russia (including the Verkhoyansk, Suntar-Khayata, and Chersky Mountains; the KolymaeAnyuy and Koryak Highlands; and much of the Kamchatka and Chukchi
Peninsulas). Here, the margins of former glaciers across this region are constrained through the comprehensive mapping of moraines from remote sensing data (Landsat 7 ETM+ satellite images; ASTER Global Digital Elevation Model (GDEM2); and Viewfinder Panorama DEM data). A total of 8414 moraines
are mapped, and this record is integrated with a series of published age-estimates (n = 25), considered to chronologically-constrain former ice-margin positions. Geomorphological and chronological data are compiled in a Geographic Information System (GIS) to produce ‘best estimate’ reconstructions of ice extent during the global Last Glacial Maximum (gLGM) and, to a lesser degree, during earlier phases of glaciation. The data reveal that much of Far NE Russia (~1,092,427 km2) preserves a glaciated landscape (i.e. is bounded by moraines), but there is no evidence of former ice masses having extended more than 270 km beyond mountain centres (suggesting that, during the Late Quaternary, the region has not been occupied by extensive ice sheets). During the gLGM, specifically, glaciers occupied ~253,000 km2, and rarely extended more than 50 km in length. During earlier (pre-gLGM) periods, glaciers were more extensive, though the timing of former glaciation, and the maximum Quaternary extent, appears to have been asynchronous across the region, and out-of-phase with ice-extent maxima elsewhere in the Northern Hemisphere. This glacial history is partly explained through consideration of climatic-forcing
(particularly moisture-availability, solar insolation and albedo), though topographic-controls upon the former extent and dynamics of glaciers are also considered, as are topographic-controls upon moraine deposition and preservation. Ultimately, our ability to understand the glacial and climatic history of this region is restricted when the geomorphological-record alone is considered, particularly as directly-dated glacial deposits are few, and topographic and climatic controls upon the moraine record are difficult to
distinguish.