24 resultados para OPM3 (Organizational Project Management Model Maturity)

em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The ability of building information modeling (BIM) to positively impact projects in the AEC through greater collaboration and integration is widely acknowledged. This paper aims to examine the development of BIM and how it can contribute to the cold-formed steel (CFS) building industry. This is achieved through the adoption of a qualitative methodology encompassing a literature review, exploratory interviews with industry experts, culminating in the development of e-learning material for the sector. In doing so, the research team have collaborated with one of the United Kingdom’s largest cold-formed steel designer/fabricators. By demonstrating the capabilities of BIM software and providing technical and informative videos in its creation, this project has found two key outcomes. Firstly, to provide invaluable assistance in the transition from traditional processes to a fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. Secondly, to demonstrate BIM’s potential not only within CFS companies, but also within the AEC sector as a whole. As the flexibility, adaptability and interoperability of BIM software is alluded to, the results indicate that the introduction and development of BIM and the underlying ethos suggests that it is a key tool in the development of the industry as a whole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Large construction projects create numerous hazards, making it one of the most dangerous industries in which to work. This element of risk increases in urban areas and can have a negative impact on the external stakeholders associated with the project, along with their surrounding environments. The aim of this paper is to identify and document, in an urban context, the numerous issues encountered by on-site project managers from external stakeholders and how they affect a construction project. In addressing this aim, the core objective is to identify what issues are involved in the management of these stakeholders. In order to meet this requirement, a qualitative methodology encompassing an informative literature review followed by five individual case study interviews. The data gathered is assessed qualitatively using mind mapping software. A number of issues are identified which have an impact on the external stakeholders involved, and also how they affected proceedings on site. Collectively the most commonly occurring issues are environmental, legal, health and safety and communication issues. These ranged from road closures and traffic disruption to noise, dust and vibrations from site works. It is anticipated that the results of this study will assist and aid project managers in identifying issues considering external stakeholders, particularly on urban construction projects. A wide range of issues can develop depending on the complexity and nature of each project, but this research will illustrate and reinforce to project managers, that identifying issues early, effective communication and appropriate liaising can be used to manage the issues considering external stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Few studies to date have paid attention to relationship management when addressing performance problems. To bridge the knowledge gap, a questionnaire survey is conducted to analyze the impact of relationship management on project performance in construction. The analysis reveals that the deterioration of working relationships may increase the likelihood of poor performance. Poor performance can be effectively reduced by improving some aspects of working relationships. Collaborative working contributes to performance improvement, in which long-term collaboration is more effective than short-term collaboration. In addition to the questionnaire survey, a series of expert interviews provide a deeper insight into effective relationship management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to add to current discussions on the use of Lacanian psychoanalysis in organizational change. Specifically, It argues that critiques of Lacan's work must be acknowledged and incorporated into these discussions. To date, there remains a silence surrounding these critiques within organization studies.
Design/methodology/approach: The paper presents the existing studies that draw upon Lacan's work in the context of organizational change initiatives. It highlights the value of this theory. Next, it outlines critiques of Lacan's concepts of phallus and incest taboo, and show how these concepts can be exclusionary.
Findings: The paper finds that there remains little debate within organization studies around such critiques. Lacan tends to be employed in ways that risk reproducing particular, exclusionary aspects of his theory. A homophobic and patriarchal legacy persists in appropriations of his writing. It outlines alternative ways of reading Lacan, which aim to avoid such exclusions. It shows how introducing such alternatives is a difficult project, first, given the silence surrounding critiques of Lacan in the organizational change literature. Second, following Foucault, It argues that language has power: a patriarchal schema is self-reinforcing in its persistence within a particular discipline, and thus difficult to dislodge.
Research limitations/implications: Given these findings, the paper concludes that organization theorists and practitioners ought to engage with critiques of Lacan's work, when employing it in their own. The silence surrounding such legacies is dangerous. It argues that the first step in engaging with Lacan's work should be to give voice to such critiques, if his writing is to be employed in the practice and study of organizational change.
Originality/value: This paper provides a unique engagement with Lacan's work in the context of the study and practice of organizational change interventions. It presents an evaluation of well-known critiques and useful recommendations for theorists and practitioners considering a Lacanian approach to this area of management studies. © Emerald Group Publishing Limited.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Aim: The aim of this paper is to identify best practice relating to the effective management of materials in an urban, confined construction site, using structural equation modelling.

Methodology: A literature review, case study analysis and questionnaire survey are employed, with the results scrutinised using confirmatory factor analysis in the form of structural equation modelling.

Results: The following are the leading strategies in the management of materials in a confined urban site environment; (1) Consult and review the project programme, (2) Effective communication and delivery, (3) Implement site safety management plans, and (4) Proactive spatial monitoring and control.

Implication for Practice: With the relentless expansion of urban centres and the increasing high cost of materials, any potential savings made on-site would translate into significant monetary concessions on completion of a development.

Originality/Value: As on-site project management professionals successfully identify and implement the various strategies in the management of plant and materials on a confined urban site, successful resource management in this restrictive environment is attainable.

Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) together with a questionnaire survey from the industry, investigating the managerial strategies in the management of plant and material in confined urban site environments

Relevância:

100.00% 100.00%

Publicador:

Resumo:

For those working in the humanitarian sector, achieving positive outcomes for postdisaster communities through reconstruction projects is a pressing concern. In the wake of recent natural disasters, NGOs have become increasingly involved in the permanent reconstruction of affected communities. They have encountered significant barriers as they implement reconstruction programmes and this paper argues that it is important to address the visible lack of innovation that is partially to blame. The theoretical bedrock of a current research project will be used as the starting point for this argument, the overall goal of which is to design a competency-based framework model that can be used by NGOs in post-disaster reconstruction projects. Drawing on established theories of management, a unique perspective has been developed from which a competency-based reconstruction theory emerges. This theoretical framework brings together 3 distinct fields; Disaster Management, Strategic Management and Project Management, each vital
to the success of the model. The objectives of this paper are a) to investigate the role of NGOs in post-disaster reconstruction and establish the current standard of practice b) to determine the extent to which NGOs have the opportunity to contribute to sustainable community development through reconstruction c) to outline the main factors of a theoretical framework first proposed by Von Meding et al. 2009 and d) to identify the innovative measures that can be taken by NGOs to achieve more positive outcomes in their interventions. It is important that NGOs involved in post-disaster reconstruction become familiar with concepts and strategies such as those contained in this paper. Competency-based organizational change on the basis of this theory has the potential to help define the standard of best practice to which future NGO projects might align themselves.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the aftermath of recent natural disasters, NGOs have become increasingly involved in the permanent reconstruction of affected communities. These organizations, often operating well outside their expertise, encounter significant barriers as they implement reconstruction programmes. This paper presents the theoretical bedrock of a current research project, the overall goal of which is to design a competency-based framework model that can be used by NGOs in post-disaster reconstruction projects. Drawing on established theories of management, a unique perspective has been developed from which a competency-based reconstruction theory emerges. This theoretical framework brings together three distinct fields; Disaster Management, Strategic Management and Project Management, each vital to the success of the model. This theoretical study will incorporate a critical review of literature within each field. It is imperative that NGOs involved in post-disaster reconstruction familiarize themselves with concepts and strategies. It is hoped that the competence-based frame-work model that is produced on the basis of this theory will help define the standard of best practice to which future NGO projects might align themselves.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The change of supply chain relationships from the traditional adversarial to the collaborative has been increasing in the UK construction industry. To reflect this change, some attempts have been made to establish models for measuring and improving supply chain relationships in construction. However, there are obvious deficiencies in these existing models. This highlights the need for a systematic model for the assessment of construction supply chain relationships. Based on a review of the literature and an expert group discussion, an assessment framework is developed in this paper, which consists of assessment criteria, relationship levels, detailed descriptions, assessment classes and assessment procedures. The proposed framework is evaluated through expert interviews and case studies. This framework provides a roadmap for the improvement of supply chain relationships. It can help construction organisations to position their current relationship and identify key areas for relationship improvement in the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This case study examines how the lean ideas behind the Toyota production system can be applied to software project management. It is a detailed investigation of the performance of a nine-person software development team employed by BBC Worldwide based in London. The data collected in 2009 involved direct observations of the development team, the kanban boards, the daily stand-up meetings, semistructured interviews with a wide variety of staff, and statistical analysis. The evidence shows that over the 12-month period, lead time to deliver software improved by 37%, consistency of delivery rose by 47%, and defects reported by customers fell 24%. The significance of this work is showing that the use of lean methods including visual management, team-based problem solving, smaller batch sizes, and statistical process control can improve software development. It also summarizes key differences between agile and lean approaches to software development. The conclusion is that the performance of the software development team was improved by adopting a lean approach. The faster delivery with a focus on creating the highest value to the customer also reduced both technical and market risks. The drawbacks are that it may not fit well with existing corporate standards.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Natural hazards trigger disasters, the scale of which is largely determined by vulnerability. Developing countries suffer the most from disasters due to various conditions of vulnerability which exist and there is an opportunity after disasters to take mitigative action. NGOs implementing post-disaster rehabilitation projects must be able to address the issues causing communities to live at risk of disaster and therefore must build dynamic capacity, capabilities and competencies, enabling them to operate in unstable environments. This research is built upon a theoretical framework of dynamic competency established by combining elements of disaster management, strategic management and project management theory. A number of NGOs which have implemented reconstruction and rehabilitation projects both in Sri Lanka following the Asian Tsunami and Bangladesh following Cyclone Sidr are being investigated in great depth using a causal mapping procedure. ‘Event’ specific maps have been developed for each organization in each disaster. This data will be analysed with a view to discovering the strategies which lead to vulnerability reduction in post-disaster communities and the competencies that NGOs must possess in order to achieve favourable outcomes. It is hypothesized that by building organizational capacity, capabilities and competencies to be dynamic in nature, while focusing on a more emergent strategic approach, with emphasis on adaptive capability and innovation, NGOs will be better equipped to contribute to sustainable community development through reconstruction. We believe that through this study it will be possible to glean a new understanding of social processes that emerge within community rehabilitation projects.