Resumo:
Since the first launch of the new engineering contract (NEC) in 1993, early warning of problems has been widely recognized as an important approach of proactive management during a construction or engineering project. Is early warning really effective for the improvement of problem solving and project performance? This is a research question that still lacks a good answer. For this reason, an empirical investigation was made in the United Kingdom (U.K.) to answer the question. This study adopts a combination of literature review, expert interview, and questionnaire survey. Nearly 100 questionnaire responses were collected from the U.K. construction industry, based on which the use of early warning under different forms of contract is compared in this paper. Problem solving and project performance are further compared between the projects using early warning and the projects not using early warning. The comparison provides clear evidence for the significant effect of early warning on problem solving and project performance in terms of time, cost, and quality. Subsequently, an input-process-output model is developed in this paper to explore the relationship among early warning, problem solving, and project
performance. All these help construction researchers and practitioners to better understand the role of early warning in ensuring project success.
Resumo:
BACKGROUND: Head and neck (H&N) cancers are a heterogeneous group of malignancies, affecting various sites, with different prognoses. The aims of this study are to analyse survival for patients with H&N cancers in relation to tumour location, to assess the change in survival between European countries, and to investigate whether survival improved over time.
METHODS: We analysed about 250,000 H&N cancer cases from 86 cancer registries (CRs). Relative survival (RS) was estimated by sex, age, country and stage. We described survival time trends over 1999-2007, using the period approach. Model based survival estimates of relative excess risks (RERs) of death were also provided by country, after adjusting for sex, age and sub-site.
RESULTS: Five-year RS was the poorest for hypopharynx (25%) and the highest for larynx (59%). Outcome was significantly better in female than in male patients. In Europe, age-standardised 5-year survival remained stable from 1999-2001 to 2005-2007 for laryngeal cancer, while it increased for all the other H&N cancers. Five-year age-standardised RS was low in Eastern countries, 47% for larynx and 28% for all the other H&N cancers combined, and high in Ireland and the United Kingdom (UK), and Northern Europe (62% and 46%). Adjustment for sub-site narrowed the difference between countries. Fifty-four percent of patients was diagnosed at advanced stage (regional or metastatic). Five-year RS for localised cases ranged between 42% (hypopharynx) and 74% (larynx).
CONCLUSIONS: This study shows survival progresses during the study period. However, slightly more than half of patients were diagnosed with regional or metastatic disease at diagnosis. Early diagnosis and timely start of treatment are crucial to reduce the European gap to further improve H&N cancers outcome.
Resumo:
Objective To prospectively evaluate and quantify the efficacy of cadaveric fascia lata (CFL) as an allograft material in pubovaginal sling placement to treat stress urinary incontinence (SUI).
Patients and methods Thirty-one women with SUI (25 type II and six type III; mean age 63 years, range 40-75) had a CFL pubovaginal sling placed transvaginally. The operative time, blood loss, surgical complications and mean hospital stay were all documented. Before and at 4 months and 1 year after surgery each patient completed a 3-day voiding diary and validated voiding questionnaires (functional inquiry into voiding habits, Urogenital Distress Inventory and Incontinence Impact Questionnaire, including visual analogue scales).
Results The mean (range) operative time was 71 (50-120) min, blood loss 78.7 (20-250) mL and hospital stay 1.2 (1-2) days; there were no surgical complications. Over the mean follow-up of 13.5 months, complete resolution of SUI was reported by 29 (93%) patients. Overactive bladder symptoms were present in 23 (74%) patients before surgery, 21 (68%) at 4 months and two (6%) at 1 year; 80% of patients with low (<15 cmH (2) O) voiding pressures before surgery required self-catheterization afterward, as did 36% at 4 months, but only one (3%) at 1 year. Twenty-four (77%) patients needed to adopt specific postures to facilitate voiding. After surgery there was a significant reduction in daytime frequency, leakage episodes and pad use (P <0.05). The severity of leak and storage symptoms was also significantly less (P <0.002), whilst the severity of obstructive symptoms remained unchanged. Mean subjective levels of improvement were 69% at 4 months and 85% at 1 year, with corresponding objective satisfaction levels of 61% and 69%, respectively. At 1 year, approximate to 80% of the patients said they would undergo the procedure again and/or recommend it to a friend.
Conclusion Placing a pubovaginal sling of CFL allograft is a highly effective, safe surgical approach for resolving SUI, with a short operative time and rapid recovery. Storage symptoms are significantly improved, and subjective improvement and satisfaction rates are high.
Resumo:
Symposium Chair: Dr Jennifer McGaughey
Title: Early Warning Systems: problems, pragmatics and potential
Early Warning Systems (EWS) provide a mechanism for staff to recognise, refer and manage deteriorating patients on general hospital wards. Implementation of EWS in practice has required considerable change in the delivery of critical care across hospitals. Drawing their experience of these changes the authors will demonstrate the problems and potential of using EWS to improve patient outcomes.
The first paper (Dr Jennifer McGaughey: Early Warning Systems: what works?) reviews the research evidence regarding the factors that support or constrain the implementation of Early Warning System (EWS) in practice. These findings explain those processes which impact on the successful achievement of patient outcomes. In order to improve detection and standardise practice National EWS have been implemented in the United Kingdom. The second paper (Catherine Plowright: The implementation of the National EWS in a District General Hospital) focuses on the process of implementing and auditing a National EWS. This process improvement is essential to contribute to future collaborative research and collection of robust datasets to improve patient safety as recommended by the Royal College of Physicians (RCP 2012). To successfully implement NEWS in practice requires strategic planning and staff education. The practical issues of training staff is discussed in the third paper. This paper (Collette Laws-Chapman: Simulation as a modality to embed the use of Early Warning Systems) focuses on using simulation and structured debrief to enhance learning in the early recognition and management of deteriorating patients. This session emphasises the importance of cognitive and social skills developed alongside practical skills in the simulated setting.
Resumo:
Early contractor involvement is a topic that has attracted attention from construction practitioners and researchers in the UK since the 1990s. It has been adopted to introduce construction knowledge and experience to the design process, and to integrate design with construction. In contrast with the limited number of previous studies on early contractor involvement, which used case studies, a questionnaire survey was conducted in this study, to investigate the application of early contractor involvement in current practice and its impact on project performance in terms of time, cost and quality. From an analysis of the questionnaire results, early contractor involvement is found to be increasingly used in the construction industry, and to have a significant impact on cost and time performance. This research provides empirical evidence related to the practice of early contractor involvement. It demonstrates the major influence of early contractor involvement on management processes and working relationships during a project, which contribute to performance improvement and project success.