8 resultados para Document Management

em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aim This study aimed to document developments in rectal cancer services in a UK population and evaluate changes in outcome over a 10-year period.

Method Patients diagnosed with primary rectal carcinoma in 1996, 2001 and 2006 were identified by the Northern Ireland Cancer Registry. Data were retrospectively collected on presentation, investigation, treatment and staging. Differences over the period were analysed using the chi-squared test; Kaplan–Meier and Cox regression tests were used for survival analysis.

Results After exclusions there were 636 patients, including 187 presenting in 1996, 203 in 2001 and 246 in 2006. The use of preoperative MRI of the rectum, endorectal ultrasound and abdominal CT increased during the study period. For patients treated by surgery, total mesorectal excision (TME) increased from 19% in 1996 to 64% in 2006 (P < 0.001). The use of radiotherapy (27% in 1996, 47% in 2006) and chemotherapy (21% in 1996, 32% in 2006) increased. The overall 5-year survival improved significantly between 1996 and 2006 from 34% in 1996 to 45% in 2006 (P = 0.02). Among patients having surgery, 5-year survival increased from 43% in 1996 to 63% in 2006 (P < 0.001). Multivariate analysis showed that the improvement in survival was associated with TME and chemotherapy, while radiotherapy was not.

Conclusion Survival of patients with rectal cancer in Northern Ireland has improved significantly over the last decade, probably due to the increased use of TME and chemotherapy.

Keywords Surgery, rectum, oncology

What does this paper add to the literature?
This population-based study demonstrates a significant improvement in survival over recent years of rectal cancer patients in Northern Ireland. It concludes that surgical resection with TME and chemotherapy have had a significant impact on survival and that the improvement was not due to a stage-migration effect.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: Persistence of urinary incontinence post acquired brain injury (ABI) carries important prognostic significance. We undertook to document the incidence of urinary incontinence, its management and complications in rehabilitation inpatients following ABI and to assess adherence to post ABI bladder management guidelines. 

Method: A retrospective chart survey of a convenience sample of consecutive admissions to two adult neurorehabilitation units Forster Green Hospital, Belfast, and the Scottish Brain Injury Rehabilitation Service, Edinburgh (SBIRSE). Bladder continence and management on transfer to and discharge from rehabilitation, trial removal of catheter, use of bladder drill, ultrasound investigation, anticholinergic medication and complications were recorded. 

Results: One hundred and forty six patients were identified. Seventy-seven (52.7%) were independent and continent of urine at rehabilitation admission and 109 (74.7%) on discharge. In all, 13 patients had urinary tract infection, 7 had urethral stricture and 1 developed haematuria whilst catheterised. Ultrasound of renal tracts was underused. Trial removal of catheter after transfer to rehabilitation occurred at a median of 10 days. 

Conclusions: Urinary continence was achieved in almost half of incontinent ABI patients during rehabilitation. There is potential for increased use of investigation of the renal tracts. Rehabilitation physicians should consider urethral stricture in the management of continence post ABI. 

Implications for Rehabilitation:

- Persisting urinary incontinence post ABI is associated with increased morbidity.

- Urethral stricture is an under-recognised complication after ABI and should be considered as a potential cause of incontinence in this patient group.

- Gains in urinary continence are seen in patients post ABI, managed with various interventions.

- Goal setting offers an opportunity to focus on bladder management rather than simply continence and may allow improvement in rate of appropriate investigation

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Complex collaboration in rapidly changing business environments create challenges for management capability in Utility Horizontal Supply Chains (UHSCs) involving the deploying and evolving of performance measures. The aim of the study is twofold. First, there is a need to explore how management capability can be developed and used to deploy and evolve Performance Measurement (PM), both across a UHSC and within its constituent organisations, drawing upon a theoretical nexus of Dynamic Capability (DC) theory and complementary Goal Theory. Second, to make a contribution to knowledge by empirically building theory using these constructs to show the management motivations and behaviours within PM-based DCs. The methodology uses an interpretive theory building, multiple case based approach (n=3) as part of a USHC. The data collection methods include, interviews (n=54), focus groups (n=10), document analysis and participant observation (reflective learning logs) over a five-year period giving longitudinal data. The empirical findings lead to the development of a conceptual framework showing that management capabilities in driving PM deployment and evolution can be represented as multilevel renewal and incremental Dynamic Capabilities, which can be further understood in terms of motivation and behaviour by Goal-Theoretic constructs. In addition three interrelated cross cutting themes of management capabilities in consensus building, goal setting and resource change were identified. These management capabilities require carefully planned development and nurturing within the UHSC. 

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Large construction projects create numerous hazards, making it one of the most dangerous industries in which to work. This element of risk increases in urban areas and can have a negative impact on the external stakeholders associated with the project, along with their surrounding environments. The aim of this paper is to identify and document, in an urban context, the numerous issues encountered by on-site project managers from external stakeholders and how they affect a construction project. In addressing this aim, the core objective is to identify what issues are involved in the management of these stakeholders. In order to meet this requirement, a qualitative methodology encompassing an informative literature review followed by five individual case study interviews. The data gathered is assessed qualitatively using mind mapping software. A number of issues are identified which have an impact on the external stakeholders involved, and also how they affected proceedings on site. Collectively the most commonly occurring issues are environmental, legal, health and safety and communication issues. These ranged from road closures and traffic disruption to noise, dust and vibrations from site works. It is anticipated that the results of this study will assist and aid project managers in identifying issues considering external stakeholders, particularly on urban construction projects. A wide range of issues can develop depending on the complexity and nature of each project, but this research will illustrate and reinforce to project managers, that identifying issues early, effective communication and appropriate liaising can be used to manage the issues considering external stakeholders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this paper is to explore the role of Quality Management (QM) theory and practice using a contingency theory perspective. The study is grounded in the role of QM in improving strategic alignment within Small and Medium Sized Enterprises (SMEs) using Contingency Theory rather than adopting best practice approaches. An inductive theory building research methodology was used involving multiple case analyses of five SMEs, involving repeat interviews (n=45), focus groups (n=5) and document analysis. From the findings, it was found that Contingency Variables (strategy, culture, lifecycle and customer focus) and their respective typologies were found to interact with QM practices in helping to shape strategic alignment between the SMEs and their environments. This shaping process based on contingency approaches occurred in a manner unique to each SME and their respective environments rather than in an overarching best practice manner.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Resource Selection (or Query Routing) is an important step in P2P IR. Though analogous to document retrieval in the sense of choosing a relevant subset of resources, resource selection methods have evolved independently from those for document retrieval. Among the reasons for such divergence is that document retrieval targets scenarios where underlying resources are semantically homogeneous, whereas peers would manage diverse content. We observe that semantic heterogeneity is mitigated in the clustered 2-tier P2P IR architecture resource selection layer by way of usage of clustering, and posit that this necessitates a re-look at the applicability of document retrieval methods for resource selection within such a framework. This paper empirically benchmarks document retrieval models against the state-of-the-art resource selection models for the problem of resource selection in the clustered P2P IR architecture, using classical IR evaluation metrics. Our benchmarking study illustrates that document retrieval models significantly outperform other methods for the task of resource selection in the clustered P2P IR architecture. This indicates that clustered P2P IR framework can exploit advancements in document retrieval methods to deliver corresponding improvements in resource selection, indicating potential convergence of these fields for the clustered P2P IR architecture.