8 resultados para Contractor

em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Construction Design and Management (CDM) Regulations (2007) is one of the most important set of health and safety regulations in the construction industry today. The aim of this research is to examine critical success factors for CDM compliance in small to medium size contractors in the UK construction industry. The objectives of the research include the identification of critical barriers in doing so along with the identification of success factors where CDM is incorporated. A mixed method approach is adopted in the identification and categorisation of the various factors encompassing a literature review, interviews and questionnaire survey. The key finding which emerge is the lack of knowledge and understanding with regards the CDM regulations with the recommendation to encourage small and medium contractor compliance through illustrating the benefits attainable. The practicality of the research is evident based on the significant uptake in the CDM by larger contractors, yet the research indicates that further insight and guidance is required to educate and inform those working within small to medium sized contractors in the UK. Where such acknowledgement and compliance is adopted, it is envisaged that this sector will benefit from reduced incidents and accidents, increased productivity while ultimately leading to a safer and more productive industry as a whole.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Early contractor involvement is a topic that has attracted attention from construction practitioners and researchers in the UK since the 1990s. It has been adopted to introduce construction knowledge and experience to the design process, and to integrate design with construction. In contrast with the limited number of previous studies on early contractor involvement, which used case studies, a questionnaire survey was conducted in this study, to investigate the application of early contractor involvement in current practice and its impact on project performance in terms of time, cost and quality. From an analysis of the questionnaire results, early contractor involvement is found to be increasingly used in the construction industry, and to have a significant impact on cost and time performance. This research provides empirical evidence related to the practice of early contractor involvement. It demonstrates the major influence of early contractor involvement on management processes and working relationships during a project, which contribute to performance improvement and project success.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this study is to explore the formative development of construction supply chain guidelines or proposals in a UK region’s schools’ estates procurement process to more effectively address a forthcoming increase in investment.

Design/methodology/approach – The research approach is interpretive. Using an action research approach, repeated semi-structured interviews and focus groups with a range of stakeholders are conducted.

Findings – The current construction supply chain in schools’ estate procurement has many difficulties, not least given the highly fragmented and disconnected nature of the projects. Synergies are being missed and there is little or no continuous improvement. Drawing on these findings, the research iteratively develops a range of proposals and guidelines to address this situation.

Research limitations/implications – This research adds weight to the current focus on pressing for change in the construction industry. It presents potentially valuable insights into the benefits of partnering arrangements and how these might usefully be incorporated into schools’ estate supply chain.

Practical implications – A set of guidelines is developed to guide the public procurement of schools’ estate in a UK region. These guidelines are set within the context of the Modernising and Rethinking Construction agenda.

Originality/value – The action research approach enabled the researchers to gain a unique insight into how public procurement and contractor personnel interact and to establish effective practical guidelines.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Public private partnerships (PPP) are an established model for most governments internationally to provide infrastructure-based services, using private finance. Typically the public authority will sign a contract with a special purpose vehicle (SPV), which, because of the holistic nature of PPP, in turn sub-contracts the finance, design, construction, maintenance and soft services to companies that are often related to its shareholders. Thus there is a considerable network of linked organisations that together procure and provide the PPP project. While there is an increasing body of research that examines these PPP projects, much of it is interview or case study based so that the evidence is drawn from a small number of interviews or cases in specific sectors. It also focuses on the public sector procurer and the private sector contractor in the network of organisations. Although it has been recognised that the perceptions of the financiers may vary from those of other key PPP players there is much less research that focuses on the financiers. In this paper we report the results of a postal questionnaire survey, administered to 109 providers of senior debt and equity, from which the response rate was just less than 40%. We supplement these findings with a small number of illustrative quotes from interviewees, where the cited quote represents a commonly held view. We used SPSS and Nvivo to analyse the data. The findings show that when assessing PPPs financiers perceive a very wide range of risks as important, and that it is important to them that many of these risks are either insured or allocated to sub-contractors. When considering participating in PPPs, financiers agree that working with familiar partners on familiar projects and in familiar sectors is important, which may raise barriers to entry and undermine competitive processes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In comparison to the rest of the United Kingdom (UK) the Northern Irish Construction Industry was disproportionately affected by the recent economic recession. During this period, use of the New Engineering Contract (NEC) has proliferated in the public sector, however no study has been undertaken to examine the impact of the recession on this contract in Northern Ireland. The aim of this paper is to explore NEC contract implementation in Northern Ireland and the impact of the recession on its operation. A qualitative methodology is adopted using a literature review and semi structured interviews with six construction professionals. A qualitative analysis identifies themes and issues arising exploring connections and links between them using thematic coding. The initial findings are that the introduction of the NEC contract in Northern Ireland makes demands of contractors and consultants in terms of additional resources and training. Some consultants show a clear lack of understanding of the contract and its provisions. Whilst there is general agreement that the contract does help to stimulate good project management, the interviewees find the contract time consuming and complicated to administer, describing it as “unforgiving for the architect and unforgiving to the contractor.” Due to the impact of the recession, both contractors and consultants are still reporting a drop in income from pre-recession levels. Project resourcing levels have dropped significantly since the onset of the recession. Adversarial and opportunistic behaviour has increased. Many consultants and contractors are struggling to adequately administer the NEC contract at current income levels. The introduction of the NEC contract and the economic recession have exerted opposing forces on the implementation of the contract, hindering its execution. As the pressures exerted by the economic recession abate and a greater understanding of the contract develops, these opposing forces will ease leading to a more consistent implementation of the contract.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Inner city developments are a common feature within many urban environments. Where these construction sites are not managed effectively, they can negatively impact their surrounding community. The aim of this paper is to identify and document, in an urban context, the numerous issues encounter and subsequent strategies adopted by on-site contractors and local people, in the mitigation of factors which negatively impact their surrounding community. The objectives in achieving this aim are to identify what effect, if any, an urban construction site has on its surrounding environment, the issues and resulting strategies adopted by contractors on the factors identified, and also what measures are put in place to minimise such disturbances to the local community. In order to meet the requirements, a mixed methodology is adopted culminating in a literature review, case study analysis, contractor and community interviews, concluding in the development of two specific questions for both perspectives in question. The data is assessed using severity indices based on mean testing in the development of key findings. The results indicate that the main forms of disturbance to the local community from an urban development include noise, dust and traffic congestion. With respect to a contractor on-site, the key issues include damaging surrounding buildings, noise control and off-site parking. The resulting strategies identified in the mitigation of such issues include the implementation of noise and dust containment measures and minimising disruption to local infrastructure. It is envisaged that the results of this study will provide contractors operating in such environments, with the required information which can assist in minimising disruption and therefore, avoiding disputes with the local community members. By consulting with and surveying those most affected, this research will illustrate to on-site management, the difficulties faced by those who accommodate such developments within their living environment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Arch bridges are strong, durable, aesthetically pleasing and require little maintenance but very few have been built since the early 1900s. However, this trend has changed as more than 60 FlexiArch bridges have been installed since the system was launched in 2007. The FlexiArch uses precast concrete voussoirs, requires neither corrodible reinforcement, nor centring, can be installed in hours and is contractor friendly. Details of this innovative method of construction and installation of arch bridges are given and the enormous potential of the system for multi-span
viaducts is also highlighted.