53 resultados para Construction supply chain
em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast
Resumo:
The change of supply chain relationships from the traditional adversarial to the collaborative has been increasing in the UK construction industry. To reflect this change, some attempts have been made to establish models for measuring and improving supply chain relationships in construction. However, there are obvious deficiencies in these existing models. This highlights the need for a systematic model for the assessment of construction supply chain relationships. Based on a review of the literature and an expert group discussion, an assessment framework is developed in this paper, which consists of assessment criteria, relationship levels, detailed descriptions, assessment classes and assessment procedures. The proposed framework is evaluated through expert interviews and case studies. This framework provides a roadmap for the improvement of supply chain relationships. It can help construction organisations to position their current relationship and identify key areas for relationship improvement in the future.
Resumo:
Purpose – The purpose of this study is to explore the formative development of construction supply chain guidelines or proposals in a UK region’s schools’ estates procurement process to more effectively address a forthcoming increase in investment.
Design/methodology/approach – The research approach is interpretive. Using an action research approach, repeated semi-structured interviews and focus groups with a range of stakeholders are conducted.
Findings – The current construction supply chain in schools’ estate procurement has many difficulties, not least given the highly fragmented and disconnected nature of the projects. Synergies are being missed and there is little or no continuous improvement. Drawing on these findings, the research iteratively develops a range of proposals and guidelines to address this situation.
Research limitations/implications – This research adds weight to the current focus on pressing for change in the construction industry. It presents potentially valuable insights into the benefits of partnering arrangements and how these might usefully be incorporated into schools’ estate supply chain.
Practical implications – A set of guidelines is developed to guide the public procurement of schools’ estate in a UK region. These guidelines are set within the context of the Modernising and Rethinking Construction agenda.
Originality/value – The action research approach enabled the researchers to gain a unique insight into how public procurement and contractor personnel interact and to establish effective practical guidelines.
Resumo:
This study explores the special characteristics of the construction industry and develops a maturity model for measuring and improving the relationships between the key players of a construction supply chain. The model adopts the capability maturity methodology and defines four maturity levels of construction supply chain relationships. It is in a matrix format, consisting of 24 assessment criteria in eight categories at each maturity level. It also provides three different ways of using the model. The model is evaluated through a series of expert interviews. A case study is also presented to demonstrate the application of this model in practice.
Resumo:
There has been an increasing highlight of supply chain collaboration in UK construction. However, few studies have provided evidence for the current status. Based on the analysis of over 100 questionnaire responses in this research, it is found that the UK construction industry as a whole is experiencing an important change and moving towards supply chain collaboration. On the other hand, an unbalance is found for the change movement. In addition to the questionnaire survey, a series of expert interviews help to explore the specific characteristics of supply chain collaboration in construction and provide practical implications for collaboration strategy implementation.
Resumo:
With the increase in construction in dense urban environments, the delays associated with managing the material supply chain to site is called into question. Purpose: The aim of this investigation is to gain the perspective of construction contractors operating in a dense urban environment and the resulting strategies adopted to reduce delays in the delivery of materials to site. Methodology: This is achieved through incorporating a comprehensive literature review on the subject in conjunction with industry interviews with construction professionals in the identification of various management issues and corresponding strategies in the reduction of delays in the delivery of materials to site. Findings: The key issue which emerges is the lack of space for unloading bays while the corresponding key strategy is to schedule deliveries outside peak congestion times. Practical Implication: With confined site construction evident throughout the industry and the noted importance of an effective supply chain, the findings here in further assist on-site management in the daily task of ensuring the effective delivery and off-loading of materials in a complex and hazardous environment. Originality/Value: This research aids on-site management of confined site environments in the coordination of the material supply chain to site.
Resumo:
A generic, hierarchical, and multifidelity unit cost of acquisition estimating methodology for outside production machined parts is presented. The originality of the work lies with the method’s inherent capability of being able to generate multilevel and multifidelity cost relations for large volumes of parts utilizing process, supply chain costing data, and varying degrees of part design definition information. Estimates can be generated throughout the life cycle of a part using different grades of the combined information available. Considering design development for a given part, additional design definition may be used as it becomes available within the developed method to improve the quality of the resulting estimate. Via a process of analogous classification, parts are classified into groups of increasing similarity using design-based descriptors. A parametric estimating method is then applied to each subgroup of the machined part commodity in the direction of improved classification and using which, a relationship which links design variables to manufacturing cycle time may be generated. A rate cost reflective of the supply chain is then applied to the cycle time estimate for a given part to arrive at an estimate of make cost which is then totalled with the material and treatments cost components respectively to give an overall estimate of unit acquisition cost. Both the rate charge applied and the treatments cost calculated for a given procured part is derived via the use of ratio analysis.