Aim: The aim of this paper is to identify best practice relating to the effective management of materials in an urban, confined construction site, using structural equation modelling.

Methodology: A literature review, case study analysis and questionnaire survey are employed, with the results scrutinised using confirmatory factor analysis in the form of structural equation modelling.

Results: The following are the leading strategies in the management of materials in a confined urban site environment; (1) Consult and review the project programme, (2) Effective communication and delivery, (3) Implement site safety management plans, and (4) Proactive spatial monitoring and control.

Implication for Practice: With the relentless expansion of urban centres and the increasing high cost of materials, any potential savings made on-site would translate into significant monetary concessions on completion of a development.

Originality/Value: As on-site project management professionals successfully identify and implement the various strategies in the management of plant and materials on a confined urban site, successful resource management in this restrictive environment is attainable.

Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) together with a questionnaire survey from the industry, investigating the managerial strategies in the management of plant and material in confined urban site environments

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Inner city developments are a common feature within many urban environments. Where these construction sites are not managed effectively, they can negatively impact their surrounding community. The aim of this paper is to identify and document, in an urban context, the numerous issues encounter and subsequent strategies adopted by on-site contractors and local people, in the mitigation of factors which negatively impact their surrounding community. The objectives in achieving this aim are to identify what effect, if any, an urban construction site has on its surrounding environment, the issues and resulting strategies adopted by contractors on the factors identified, and also what measures are put in place to minimise such disturbances to the local community. In order to meet the requirements, a mixed methodology is adopted culminating in a literature review, case study analysis, contractor and community interviews, concluding in the development of two specific questions for both perspectives in question. The data is assessed using severity indices based on mean testing in the development of key findings. The results indicate that the main forms of disturbance to the local community from an urban development include noise, dust and traffic congestion. With respect to a contractor on-site, the key issues include damaging surrounding buildings, noise control and off-site parking. The resulting strategies identified in the mitigation of such issues include the implementation of noise and dust containment measures and minimising disruption to local infrastructure. It is envisaged that the results of this study will provide contractors operating in such environments, with the required information which can assist in minimising disruption and therefore, avoiding disputes with the local community members. By consulting with and surveying those most affected, this research will illustrate to on-site management, the difficulties faced by those who accommodate such developments within their living environment.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The objective of this paper is to identify the various managerial constraints, difficulties and issues encountered and resulting strategies adopted, to aid in the management of the various and often complex health and safety concerns, which occur within a confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, to ensure the successful management of such confined environments within the realm of health and safety. Through an extensive literature review and detailed interviews, a comprehensive insight into the health and safety concerns within a confined construction site environment is portrayed. The leading managerial strategies to the management of health and safety on confined construction sites may be listed as follows; (1) Traffic Management Plan, (2) Effective Resource Management Plan, (3) Temporary Facilities Management Plan, (4) Safe System of Work Plan, (5) Site Safety Plan, (6) Design Site Layout, (7) Space Management Plan, (8) Effective Program Management, and (9) Space Scheduling. Based on the research, it can be concluded, that through effective management of these issues identified coupled with implementing the various strategies highlighted; successful management of health and safety within a confined construction site environment is attainable.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction industry is inherently hazardous, with a significant number of accidents and incidents occurring, particularly on confined construction sites. This research identifies, clarifies and tabulates the various managerial health and safety issues encountered on confined construction sites, based on a qualitative approach, to aid in the management of the complex health and safety concerns. The methodology is based on qualitative research incorporating case studies, interviews, causal loop diagrams and mind mapping. The key findings in the managerial issues in the management of health and safety on confined construction sites can be summarised as follows; (1) A lack of space, (2) Increased management of site personnel, (3) Overcrowding of the work place. The implication for the industry is that due to the sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters. The value of such research is to aid management professionals successfully identify the various managerial issues highlighted, resulting in the successful management of health and safety on a confined construction site.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The objective of this paper is to identify various managerial issues encountered and resulting strategies adopted, with regards management of materials on confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, for the successful management of such confined environments within the realm of materials management.


Through conducting an extensive literature review and detailed interviews, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The following are the leading issues highlighted; (1)Lack of adequate storage space, (2)Work place becoming over-crowded, (3)Lack of adequate room for the effective handling of materials and (4)Difficult to transport materials around site. The leading managerial strategies to the management of materials on confined construction sites may be listed in order of importance, as follows; (1)Pre-fabrication and pre-assembly, (2)Providing adequate storage, (3)Space scheduling, (4)Just-In-Time delivery techniques, and (5)Effective design site layout.

Based on the research conducted, it can be concluded, that through effective management of the issues identified along with implementing the various strategies highlighted; successful materials management within a confined construction site environment is attainable.


Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) investigating the managerial issues and strategies relating to implementation of materials management in confined construction sites.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction industry in Northern Ireland is one of the major contributors of construction waste to landfill each year. The aim of this research paper is to identify the core on-site management causes of material waste on construction sites in Northern Ireland and to illustrate various methods of prevention which can be adopted. The research begins with a detailed literature review and is complemented with the conduction of semi-structured interviews with 6 professionals who are experienced and active within the Northern Ireland construction industry. Following on from the literature review and interviews analysis, a questionnaire survey is developed to obtain further information in relation to the subject area. The questionnaire is based on the key findings of the previous stages to direct the research towards the most influential factors. The analysis of the survey responses reveals that the core causes of waste generation include a rushed program, poor handling and on-site damage of materials, while the principal methods of prevention emerge as the adequate storage, the reuse of material on-site and efficient material ordering. Furthermore, the role of the professional background in the shaping of perceptions relevant to waste management is also investigated and significant differences are identified. The findings of this research are beneficial for the industry as they enhance the understanding of construction waste generation causes and highlight the practices required to reduce waste on-site in the context of sustainable development.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.

Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.

Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.

Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.

Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Genetic studies with Burkholderia cepacia complex isolates are hampered by the limited availability of cloning vectors and by the inherent resistance of these isolates to the most common antibiotics used for genetic selection. Also, some of the promoters widely employed for gene expression in Escherichia coli are inefficient in B. cepacia. In this study, we have utilized the backbone of the vector pME6000, a derivative of the pBBR1 plasmid that was originally isolated from Bordetella bronchiseptica, to construct a set of vectors useful for gene expression in B. cepacia. These vectors contain either the constitutive promoter of the S7 ribosomal protein gene from Burkholderia sp. strain LB400 or the arabinose-inducible P(BAD) promoter from E. coli. Promoter sequences were placed immediately upstream of multiple cloning sites in combination with the minimal sequence of pME6000 required for plasmid maintenance and mobilization. The functionality of both vectors was assessed by cloning the enhanced green fluorescent protein gene (e-gfp) and determining the levels of enhanced green fluorescent protein expression and fluorescence emission for a variety of clinical and environmental isolates of the B. cepacia complex. We also demonstrate that B. cepacia carrying these constructs can readily be detected intracellularly by fluorescence microscopy following the infection of Acanthamoeba polyphaga.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Climate change, whether gradual or sudden, has frequently been invoked as a causal factor to explain many aspects of cultural change during the prehistoric and early historic periods. Critiquing such theories has often proven difficult, not least because of the imprecise dating of many aspects of the palaeoclimate or archaeological records and the difficulties of merging the two strands of research. Here we consider one example of the archaeological record – peatland site construction in Ireland – which has previously been interpreted in terms of social response to climate change and examine whether close scrutiny of the archaeological and palaeoenvironmental records uphold the climatically deterministic hypotheses. We evaluate evidence for phasing in the temporal distribution of trackways and related sites in Irish peatlands, of which more than 3,500 examples have been recorded, through the examination of ~350 dendrochronological and 14C dates from these structures. The role of climate change in influencing when such sites were constructed is assessed by comparing visually and statistically the frequency of sites over the last 4,500 years with well-dated, multi-proxy climate reconstructions from Irish peatlands. We demonstrate that national patterns of “peatland activity” exist that indicate that the construction of sites in bogs was neither a constant nor random phenomenon. Phases of activity (i.e. periods in which the number of structures increased), as well as the ‘lulls’ that separate them, show no consistent correlation with periods of wetter or drier conditions on the bogs, suggesting that the impetus for the start or cessation of such activity was not climatically-determined. We propose that trigger(s) for peatland site construction in Ireland must instead also be sought within the wider, contemporary social background. Perhaps not surprisingly, a comparison with archaeological and palynological evidence shows that peatland activity tends to occur at times of more expansive settlement and land-use, suggesting that the bogs were used when the landscape was being more widely occupied. Interestingly, the lulls in peatland site construction coincide with transitional points between nominal archaeological phases, typically defined on the basis of their material culture, implying that there may indeed have been a cultural discontinuity at these times. © 2012 Elsevier Ltd. All rights reserved.