120 resultados para Complexity score
em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast
Resumo:
The motivation for this study was to reduce physics workload relating to patient- specific quality assurance (QA). VMAT plan delivery accuracy was determined from analysis of pre- and on-treatment trajectory log files and phantom-based ionization chamber array measurements. The correlation in this combination of measurements for patient-specific QA was investigated. The relationship between delivery errors and plan complexity was investigated as a potential method to further reduce patient-specific QA workload. Thirty VMAT plans from three treatment sites - prostate only, prostate and pelvic node (PPN), and head and neck (H&N) - were retrospectively analyzed in this work. The 2D fluence delivery reconstructed from pretreatment and on-treatment trajectory log files was compared with the planned fluence using gamma analysis. Pretreatment dose delivery verification was also car- ried out using gamma analysis of ionization chamber array measurements compared with calculated doses. Pearson correlations were used to explore any relationship between trajectory log file (pretreatment and on-treatment) and ionization chamber array gamma results (pretreatment). Plan complexity was assessed using the MU/ arc and the modulation complexity score (MCS), with Pearson correlations used to examine any relationships between complexity metrics and plan delivery accu- racy. Trajectory log files were also used to further explore the accuracy of MLC and gantry positions. Pretreatment 1%/1 mm gamma passing rates for trajectory log file analysis were 99.1% (98.7%-99.2%), 99.3% (99.1%-99.5%), and 98.4% (97.3%-98.8%) (median (IQR)) for prostate, PPN, and H&N, respectively, and were significantly correlated to on-treatment trajectory log file gamma results (R = 0.989, p < 0.001). Pretreatment ionization chamber array (2%/2 mm) gamma results were also significantly correlated with on-treatment trajectory log file gamma results (R = 0.623, p < 0.001). Furthermore, all gamma results displayed a significant correlation with MCS (R > 0.57, p < 0.001), but not with MU/arc. Average MLC position and gantry angle errors were 0.001 ± 0.002 mm and 0.025° ± 0.008° over all treatment sites and were not found to affect delivery accuracy. However, vari- ability in MLC speed was found to be directly related to MLC position accuracy. The accuracy of VMAT plan delivery assessed using pretreatment trajectory log file fluence delivery and ionization chamber array measurements were strongly correlated with on-treatment trajectory log file fluence delivery. The strong corre- lation between trajectory log file and phantom-based gamma results demonstrates potential to reduce our current patient-specific QA. Additionally, insight into MLC and gantry position accuracy through trajectory log file analysis and the strong cor- relation between gamma analysis results and the MCS could also provide further methodologies to both optimize the VMAT planning and QA process.
Resumo:
OBJECTIVE: To demonstrate the benefit of complexity metrics such as the modulation complexity score (MCS) and monitor units (MUs) in multi-institutional audits of volumetric-modulated arc therapy (VMAT) delivery.
METHODS: 39 VMAT treatment plans were analysed using MCS and MU. A virtual phantom planning exercise was planned and independently measured using the PTW Octavius(®) phantom and seven29(®) 2D array (PTW-Freiburg GmbH, Freiburg, Germany). MCS and MU were compared with the median gamma index pass rates (2%/2 and 3%/3 mm) and plan quality. The treatment planning systems (TPS) were grouped by VMAT modelling being specifically designed for the linear accelerator manufacturer's own treatment delivery system (Type 1) or independent of vendor for VMAT delivery (Type 2). Differences in plan complexity (MCS and MU) between TPS types were compared.
RESULTS: For Varian(®) linear accelerators (Varian(®) Medical Systems, Inc., Palo Alto, CA), MCS and MU were significantly correlated with gamma pass rates. Type 2 TPS created poorer quality, more complex plans with significantly higher MUs and MCS than Type 1 TPS. Plan quality was significantly correlated with MU for Type 2 plans. A statistically significant correlation was observed between MU and MCS for all plans (R = -0.84, p < 0.01).
CONCLUSION: MU and MCS have a role in assessing plan complexity in audits along with plan quality metrics. Plan complexity metrics give some indication of plan deliverability but should be analysed with plan quality.
ADVANCES IN KNOWLEDGE: Complexity metrics were investigated for a national rotational audit involving 34 institutions and they showed value. The metrics found that more complex plans were created for planning systems which were independent of vendor for VMAT delivery.
Resumo:
This study aims to evaluate the use of Varian radiotherapy dynamic treatment log (DynaLog) files to verify IMRT plan delivery as part of a routine quality assurance procedure. Delivery accuracy in terms of machine performance was quantified by multileaf collimator (MLC) position errors and fluence delivery accuracy for patients receiving intensity modulated radiation therapy (IMRT) treatment. The relationship between machine performance and plan complexity, quantified by the modulation complexity score (MCS) was also investigated. Actual MLC positions and delivered fraction of monitor units (MU), recorded every 50 ms during IMRT delivery, were extracted from the DynaLog files. The planned MLC positions and fractional MU were taken from the record and verify system MLC control file. Planned and delivered beam data were compared to determine leaf position errors with and without the overshoot effect. Analysis was also performed on planned and actual fluence maps reconstructed from the MLC control file and delivered treatment log files respectively. This analysis was performed for all treatment fractions for 5 prostate, 5 prostate and pelvic node (PPN) and 5 head and neck (H&N) IMRT plans, totalling 82 IMRT fields in ∼5500 DynaLog files. The root mean square (RMS) leaf position errors without the overshoot effect were 0.09, 0.26, 0.19 mm for the prostate, PPN and H&N plans respectively, which increased to 0.30, 0.39 and 0.30 mm when the overshoot effect was considered. Average errors were not affected by the overshoot effect and were 0.05, 0.13 and 0.17 mm for prostate, PPN and H&N plans respectively. The percentage of pixels passing fluence map gamma analysis at 3%/3 mm was 99.94 ± 0.25%, which reduced to 91.62 ± 11.39% at 1%/1 mm criterion. Leaf position errors, but not gamma passing rate, were directly related to plan complexity as determined by the MCS. Site specific confidence intervals for average leaf position errors were set at -0.03-0.12 mm for prostate and -0.02-0.28 mm for more complex PPN and H&N plans. For all treatment sites confidence intervals for RMS errors with the overshoot was set at 0-0.50 mm and for the percentage of pixels passing a gamma analysis at 1%/1 mm a confidence interval of 68.83% was set also for all treatment sites. This work demonstrates the successful implementation of treatment log files to validate IMRT deliveries and how dynamic log files can diagnose delivery errors not possible with phantom based QC. Machine performance was found to be directly related to plan complexity but this is not the dominant determinant of delivery accuracy.
Resumo:
The characterization and the definition of the complexity of objects is an important but very difficult problem that attracted much interest in many different fields. In this paper we introduce a new measure, called network diversity score (NDS), which allows us to quantify structural properties of networks. We demonstrate numerically that our diversity score is capable of distinguishing ordered, random and complex networks from each other and, hence, allowing us to categorize networks with respect to their structural complexity. We study 16 additional network complexity measures and find that none of these measures has similar good categorization capabilities. In contrast to many other measures suggested so far aiming for a characterization of the structural complexity of networks, our score is different for a variety of reasons. First, our score is multiplicatively composed of four individual scores, each assessing different structural properties of a network. That means our composite score reflects the structural diversity of a network. Second, our score is defined for a population of networks instead of individual networks. We will show that this removes an unwanted ambiguity, inherently present in measures that are based on single networks. In order to apply our measure practically, we provide a statistical estimator for the diversity score, which is based on a finite number of samples.
Resumo:
Potential explanatory variables often co-vary in studies of species richness. Where topography varies within a survey it is difficult to separate area and habitat-diversity effects. Topographically complex surfaces may contain more species due to increased habitat diversity or as a result of increased area per se. Fractal geometry can be used to adjust species richness estimates to control for increases in area on complex surfaces. Application of fractal techniques to a survey of rocky shores demonstrated an unambiguous area-independent effect of topography on species richness in the Isle of Man. In contrast, variation in species richness in south-west England reflected surface availability alone. Multivariate tests and variation in limpet abundances also demonstrated regional variation in the area-independent effects of topography. Community composition did not vary with increasing surface complexity in south-west England. These results suggest large-scale gradients in the effects of heterogeneity on community processes or demography.
Resumo:
Purpose The aim of this paper is to explore the issues involved in developing and applying performance management approaches within a large UK public sector department using a multiple stakeholder perspective and an accompanying theoretical framework. Design/methodology/approach An initial short questionnaire was used to determine perceptions about the implementation and effectiveness of the new performance management system across the organisation. In total, 700 questionnaires were distributed. Running concurrently with an ethnographic approach, and informed by the questionnaire responses, was a series of semi-structured interviews and focus groups. Findings Staff at all levels had an understanding of the new system and perceived it as being beneficial. However, there were concerns that the approach was not continuously managed throughout the year and was in danger of becoming an annual event, rather than an ongoing process. Furthermore, the change process seemed to have advanced without corresponding changes to appraisal and reward and recognition systems. Thus, the business objectives were not aligned with motivating factors within the organisation. Research limitations/implications Additional research to test the validity and usefulness of the theoretical model, as discussed in this paper, would be beneficial. Practical implications The strategic integration of the stakeholder performance measures and scorecards was found to be essential to producing an overall stakeholder-driven strategy within the case study organisation. Originality/value This paper discusses in detail the approach adopted and the progress made by one large UK public sector organisation, as it attempts to develop better relationships with all of its stakeholders and hence improve its performance. This paper provides a concerted attempt to link theory with practice.
Interpreting spatial complexity of decay features on a sandstone wall: St. Matthew’s Church, Belfast