173 resultados para wind tunnel
Resumo:
In the United Kingdom wind power is recognised as the main source of renewable energy to achieve the European Union 2020 renewable energy targets. Currently over 50% of renewable power is generated from onshore wind with a large number of offshore wind projects in development. Recently the government has re-iterated its commitment to offshore wind power and has announced that offshore wind subsidies are to increase from £135/MWh to £140/MWh until 2019. This paper provides a detailed overview of the offshore wind power industry in the United Kingdom in terms of market growth, policy development and offshore wind farm costs. The paper clearly shows that the United Kingdom is the world leader for installed offshore wind power capacity as pro-active policies and procedures have made it the most attractive location to develop offshore wind farm arrays. The key finding is that the United Kingdom has the potential to continue to lead the world in offshore wind power as it has over 48 GW of offshore wind power projects at different stages of operation and development. The growth of offshore wind power in the United Kingdom has seen offshore wind farm costs rise and level off at approximately £3 million/MW, which are higher than onshore wind costs at £1.5–2 million/MW. Considering the recent increase in offshore wind power subsidies and plans for 48 GW of offshore wind power could see more offshore wind power becoming increasingly financially competitive with onshore wind power. Therefore offshore wind power is likely to become a significant source of electricity in the United Kingdom beyond 2020.
Resumo:
Although pumped hydro storage is seen as a strategic key asset by grid operators, financing it is complicated in new liberalised markets. It could be argued that the optimum generation portfolio is now determined by the economic viability of generators based on a short to medium term return on investment. This has meant that capital intensive projects such as pumped hydro storage are less attractive for wholesale electricity companies because the payback periods are too long. In tandem a significant amount of wind power has entered the generation mix, which has resulted in operating and planning integration issues due to wind's inherent uncertain, varying spatial and temporal nature. These integration issues can be overcome using fast acting gas peaking plant or energy storage. Most analysis of wind power integration using storage to date has used stochastic optimisation for power system balancing or arbitrage modelling to examine techno-economic viability. In this research a deterministic dynamic programming long term generation expansion model is employed to optimise the generation mix, total system costs and total carbon dioxide emissions, and unlike other studies calculates reserve to firm wind power. The key finding of this study is that the incentive to build capital-intensive pumped hydro storage to firm wind power is limited unless exogenous market costs come very strongly into play. Furthermore it was demonstrated that reserve increases with increasing wind power showing the importance of ancillary services in future power systems. © 2014 Elsevier Ltd. All rights reserved.
Resumo:
This paper investigates the impacts of offshore wind power forecast error on the operation and management of a pool-based electricity market in 2050. The impact from offshore wind power forecast errors of up to 2000 MW on system generation costs, emission costs, dispatch-down of wind, number of start-ups and system marginal price are analysed. The main findings of this research are an increase in system marginal prices of approximately 1% for every percentage point rise in the offshore wind power forecast error regardless of the average forecast error sign. If offshore wind power generates less than forecasted (−13%) generation costs and system marginal prices increases by 10%. However, if offshore wind power generates more than forecasted (4%) the generation costs decrease yet the system marginal prices increase by 3%. The dispatch down of large quantities of wind power highlights the need for flexible interconnector capacity. From a system operator's perspective it is more beneficial when scheduling wind ahead of the trading period to forecast less wind than will be generated.
Resumo:
While the benefits of renewable energy are well known and used to influence government policy there are a number of problems which arise from having significant quantities of renewable energies on an electricity grid. The most notable problem stems from their intermittent nature which is often out of phase with the demands of the end users. This requires the development of either efficient energy storage systems, e.g. battery technology, compressed air storage etc. or through the creation of demand side management units which can utilise power quickly for manufacturing operations. Herein a system performing the conversion of synthetic biogas to synthesis gas using wind power and an induction heating system is shown. This approach demonstrates the feasibility of such techniques for stabilising the electricity grid while also providing a robust means of energy storage. This exemplar is also applicable to the production of hydrogen from the steam reforming of natural gas.
Resumo:
Tunnel construction planning requires careful consideration of the spoil management part, as this involves environmental, economic and legal requirements. In this paper a methodological approach that considers the interaction between technical and geological factors in determining the features of the resulting muck is proposed. This gives indications about the required treatments as well as laboratory and field characterisation tests to be performed to assess muck recovery alternatives. While this reuse is an opportunity for excavations in good quality homogeneous grounds (e.g. granitic mass), it is critical for complex formation. This approach has been validated, at present, for three different geo-materials resulting from a tunnel excavation carried out with a large diameter Earth Pressure Balance Shield (EPB) through a complex geological succession. Physical parameters and technological features of the three materials have been assessed, according to their valorisation potential, for defining re-utilisation patterns. The methodology proved to be effective and the laboratory tests carried out on the three materials allowed the suitability and treatment effectiveness for each muck recovery strategy to be defined. © 2014 Elsevier Ltd.
Resumo:
This presentation will explore the role that social acceptance of onshore wind can play in understanding and progressing the low carbon transition in Europe. Although this is commonly perceived as arising simply from the overall level of renewable energy generated (and ‘dirty’ energy displaced), its significance goes well beyond this as it helps us understand some of the key issues facing the electricity sector as a social-technical system. As such it is not only a matter of delivering the necessary infrastructure, but requires the long term mediation of complex multi-governmental arrangements involving a very wide range of actors. The interests of these actors engage hugely different timescales, geographic scales of concern and rationalities that make the arena of social acceptance a cauldron of complexity, mediating between overlapping and incompatible concerns. The presentation will briefly review the nature of some of these relationships and discuss what this means for how we conceive and act on the social acceptance of wind, and what this means for the long term low carbon transition
Resumo:
Light emitted from metal/oxide/metal tunnel junctions can originate from the slow-mode surface plasmon polariton supported in the oxide interface region. The effective radiative decay of this mode is constrained by competition with heavy intrinsic damping and by the need to scatter from very small scale surface roughness; the latter requirement arises from the mode's low phase velocity and the usual momentum conservation condition in the scattering process. Computational analysis of conventional devices shows that the desirable goals of decreased intrinsic damping and increased phase velocity are influenced, in order of priority, by the thickness and dielectric function of the oxide layer, the type of metal chosen for each conducting electrode, and temperature. Realizable devices supporting an optimized slow-mode plasmon polariton are suggested. Essentially these consist of thin metal electrodes separated by a dielectric layer which acts as a very thin (a few nm) electron tunneling barrier but a relatively thick (several 10's of nm) optically lossless region. (C) 1995 American Institute of Physics.
Resumo:
The light output from nominally smooth Al-Ox-Au tunnel junctions is observed to be substantially independent of the deposition rate of the Au film electrode. Films deposited quickly (2 nm s-1) and those deposited slowly (0.16 nm s-1) have similar spectral dependences and intensities. (This is in contrast to roughened films where those deposited quickly give out less light, especially towards the blue end of the spectrum.) The behaviour can be interpreted in terms of the ratio l(ph)/l(em) where l(ph) and l(em) are the mean free paths of surface plasmons between external photon emissions and internal electromagnetic absorptions respectively. Once l(ph)/l(em) exceeds 100, as it does on smooth films, grain size has little further effect on the spectral shape of the light output. In fast-deposited films there are two compensating effects on the output intensity: grain boundary scattering decreases it and greater surface roughness increases it.
Resumo:
Using a prism-air gap-sample (Otto) configuration we have optically excited surface plasmon polaritons at the Ag-air interface of passive Al-Al oxide-Ag tunnel junction structures at wavelength 632.8 nm. It is found that the internal damping of this excitation is more than a factor of 2 greater for samples with a very thin (approximately 15 nm) Ag electrode than for samples with a thicker (approximately 40 nm) Ag electrode. This observation is explained by the fact that the fields of the surface plasmon polariton penetrate more substantially into the lossy Al base electrode when the Ag top electrode is very thin.
Resumo:
Visible light is emitted from the Au-air interface of Al-I-Au thin-film tunnel junctions (deposited over a thin layer of CaF2 on glass) as a result of the decay of surface plasmon polaritons (SPPs). We show the surface topography of such a Au film and relate its large-scale features to the outcoupling of fast SPP's to photons. The absence of short-scale roughness features is explained by thier disappearance through surface diffusion. To confirm this a controlled sequence of 5-nm, 20-ms scanning tunneling microscope (STM) W tip crashes has been used to produce indentations 3 nm deep with a lateral dimension of 5-7 nm on a Au crystal in air at room temperature. Four sequences of indentations were drawn in the form of a square box. Right from the start, feature decay is observed and over a period of 2 h a succession of images shows that the structure disappears into the background as a result of surface diffusion. The surface diffusion constant is estimated to be 10(-18) cm2 s-1. The lack of light output via slow mode SPPs is an inevitable consequence of surface annealing.
Resumo:
An analysis for the cause of fracture failure of a cantilever steel sign post damaged by wind has been carried out. An unusual cause of failure has been identified, which is the subject of this paper. Microscopy and microanalysis of the fracture surface showed that the failure was due to pre-existing cracks, from the fabrication of the post. This conclusion was reached after detecting and analysing a galvanised layer on the fracture surfaces.