171 resultados para Managing projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cameron’s flagship policy of the ‘Big Society’ rests on a society/government dichotomy, diagnosing a ‘broken society’ caused by ‘big government’ having assumed the role communities once played. The remedy is greater social responsibility and the ‘Big Society’. This article argues that the dichotomy is
deceptive. We aim to show that the Big Society is big government, as it employs techniques for managing the conduct of individuals and communities such that the mentality of government, far from being removed or reduced, is bettered and made more efficient. To illustrate this, we explore two major initiatives: the National Citizen Service and the Community Resilience programme. These
projects demonstrate how practices of informing and guiding the conduct of individuals both produce agents and normalise certain values, resulting in the population being better known and controlled. Thus, far from lessening government and empowering people, the Big Society extends governmentality
throughout the social body.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The cycle of the academic year impacts on efforts to refine and improve major group design-build-test (DBT) projects since the time to run and evaluate projects is generally a full calendar year. By definition these major projects have a high degree of complexity since they act as the vehicle for the application of a range of technical knowledge and skills. There is also often an extensive list of desired learning outcomes which extends to include professional skills and attributes such as communication and team working. It is contended that student project definition and operation, like any other designed product, requires a number of iterations to achieve optimisation. The problem however is that if this cycle takes four or more years then by the time a project’s operational structure is fine tuned it is quite possible that the project theme is no longer relevant. The majority of the students will also inevitably experience a sub-optimal project experience over the 5 year development period. It would be much better if the ratio were flipped so that in 1 year an optimised project definition could be achieved which had sufficient longevity that it could run in the same efficient manner for 4 further years. An increased number of parallel investigators would also enable more varied and adventurous project concepts to be examined than a single institution could undertake alone in the same time frame.
This work-in-progress paper describes a parallel processing methodology for the accelerated definition of new student DBT project concepts. This methodology has been devised and implemented by a number of CDIO partner institutions in the UK & Ireland region. An agreed project theme was operated in parallel in one academic year with the objective of replacing a multi-year iterative cycle. Additionally the close collaboration and peer learning derived from the interaction between the coordinating academics facilitated the development of faculty teaching skills in line with CDIO standard 10.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this research is to identify and assess the opportunities and challenges of implementing a Site Waste Management Plan (SWMP) on projects irrespective of size. In the UK, construction and demolition waste accounts for a third of all UK waste. There are a number of factors that influence the implementation of SWMPs. In order to identify and analyse these factors, 4 unstructured interviews were carried out and a sample of 56 participants completed a questionnaire survey. The scope of the study was limited to UK
construction industry professionals. The analysis revealed that more needs to be done if the industry is to meet government targets of reduction in construction related waste going to landfill. In addition, although SWMP may not yet be legally required on all construction projects, clients and contractors need to realise
the benefits to cut costs and implement best practice by adopting a SWMP. The benefits of implementing a SWMP will not only help to achieve this but also gain significant cost savings on projects and is also extremely beneficial to the environment. This study presents evidence that contractors need to do more to reduce waste and draws a clear link between waste reduction and the implementation of SWMPs. The findings are useful in the ongoing efforts to encourage the industry to find smarter, more efficient and less
damaging ways to operate

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper a model of grid computation that supports both heterogeneity and dynamicity is presented. The model presupposes that user sites contain software components awaiting execution on the grid. User sites and grid sites interact by means of managers which control dynamic behaviour. The orchestration language ORC [9,10] offers an abstract means of specifying operations for resource acquisition and execution monitoring while allowing for the possibility of non-responsive hardware. It is demonstrated that ORC is sufficiently expressive to model typical kinds of grid interactions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Risk management in software engineering has become a recognized project management practice but it seems that not all companies are systematically applying it. At the same time, agile methods have become popular, partly because proponents claim that agile methods implicitly reduce risks due
to, for example, more frequent and earlier feedback, shorter periods of development time and easier prediction of cost. Therefore, there is a need to investigate how risk management can be usable in iterative and evolutionary software development processes. This paper investigates the gathering of empirical data on risk management from the project environment and presents
a novel approach to manage risk in agile projects. Our approach is based on a prototype tool, Agile Risk Tool (ART). This tool reduces human effort in risk management by using software agents to identify, assess and monitor risk, based on input and data collected from the project environment and by applying
some designated rules. As validation, groups of student project data were used to provide evidence of the efficacy of this approach. We demonstrate the approach and the feasibility of using a lightweight risk management tool to alert, assess and monitor risk with reduced human effort.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Prior research on NGO accountability argued that in the process of upward accountability to donors NGOs’ accountability towards beneficiaries had been compromised. With a focus on beneficiary accountability this paper undertakes a comparative examination of a donor funded project and a non-donor funded project. The study has been carried out in the context of a large Bangladeshi NGO with international operations. While the above conclusion on NGO accountability generally holds our study shows a somewhat different picture. Drawing on a comprehensive set of empirical evidence from various sources such as documentary analysis, interviews, focus groups and observations we show that beneficiary accountability can be better in donor funded projects as compared to non-donor funded projects. We theorise the circumstances under which it can happen. This finding has significant implications for the policy makers and donors in the context of recent drive for the self-sustainability of NGOs and its impact on the crucial issue of beneficiary accountability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We hypothesised that early life events are not routinely considered by most respiratory specialists.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The water and wastewater industry in the UK accounts for around 3% of total energy use and just over 1% of total UK greenhouse gas emissions. Targets for greenhouse gas emissions reduction and higher renewable energy penetration, coupled with rising energy costs, growing demand for wastewater services and tightening EU water quality requirements, have led to an increased interest in alternative wastewater treatment methods. The use of short rotation coppice (SRC) willow for the treatment of wastewater effluent is one such alternative, which brings with it the dual benefits of wastewater treatment and production of biomass for energy. In order to assess the effectiveness of SRC willow, it is important to analyse the overall energy balance in terms of energy input versus energy output. This paper carries out an energy life cycle analysis of a specific SRC willow plantation in Northern Ireland to which farmyard washings (dirty water) are applied. The system boundaries include the establishment, maintenance, and harvesting of the plantation, along with the transport and drying of the wood for biomass combustion. The analysis shows that the overall energy balance is positive, and that the direct and indirect energy demands are 12% and 8% of gross energy production respectively. The energy demands of the plantation are compared with the energy required to treat an equivalent nutrient load in a conventional wastewater treatment plant. While a conventional plant consumes 2.6 MJ/m3 , the irrigation system consumes 1.6 MJ/m3 and the net energy production of the scenario is 48 MJ/m3 .