109 resultados para weekly forward contracting
Report on Urban Settlement Upgrading in Iraq: Kurani Ainkawa, Erbil: Moving Forward, Lessons Learned
Resumo:
In 2009 UN-HABITAT engaged in assisting the Kurdistan Regional Government (KRG) with the design and implementation of a ‘Improving the Housing Delivery System Project in Erbil’. This initiative built upon Iraq’s National Slum Upgrading Strategy (2005) and upon Phase II of UN-HABITAT’s 'Strengthening the Capacity of the Housing Sector in Iraq' project. Key to its initiative within the KRG has been a pilot project to upgrade an informal settlement in Erbil - Kurani Ainkawa. This report reflects on the pilot project’s achievements and lessons learned from pioneering a decentralized housing strategy.
Resumo:
Background: The aim of this study was to assess the efficacy, tolerability and safety of risedronate in adults with CF. Methods: Patients with a lumbar spine (LS), total hip (TH) or femoral neck (FN) bone mineral density (BMD) Z-score of -1 or less were randomised to receive risedronate 35mg weekly or placebo, and calcium (1g)+vitamin D (800IU). Results: At baseline, BMD Z-scores in the risedronate (n = 17) and placebo (n = 19) groups were similar. By 24. months, 7/17 risedronate patients vs 0/19 placebo patients stopped the study medication due to bone pain. After 24. months treatment, the mean difference (95% CI) in change in LS, TH and FN BMD between the risedronate vs placebo groups was 4.3% (0.4, 8.2) p = 0.03; 4.0% (-0.5, 8.6) p = 0.08; and 2.4% (-3.5, 8.2) p =0.41. Conclusions: After two years treatment there was a significant increase in LS BMD with weekly risedronate compared to placebo. © 2011 European Cystic Fibrosis Society.
Resumo:
The construction industry is renowned for spending vast sums in the resolution of disputes, but never in the prevention. The purpose of this paper is to analyse the New Engineering Contract (NEC) to determine whether or not adjudication has become misaligned with the contract’s objective of promoting effective management. In doing so, the paper examines dispute review boards in order to ascertain if they could be a viable alternative to adjudication. A sequential mixed methodology is adopted including a detailed literature review, eight semi-structured interviews, culminating in the circulation and analysis of a questionnaire, to record the significance of the factors identified. The research concludes that the majority of individuals agree that dispute review boards would be more aligned with the NEC. The familiarity of members, the potential to curb rogue behaviour of parties and the proactive nature of the board are flagged as positive features, however the cost aspect requires further investigation. The reservations made in the study about adjudication, such as the priority given to speed over accuracy and also the adversarial nature of the process, suggest that a preventative step prior to proceeding to adjudication would coincide more with the three core themes of the NEC Contract and therefore, be a positive addition.