The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents studies on the properties of fresh and hardened semilightweight self-consolidating concrete (SLWSCC) mixtures, produced with two types of manufactured coarse lightweight aggregates (LWA) and normal weight sand. The first type, a sintered pulverized fuel ash, was made from an industrial by-product, fly ash, whereas the second one, an expanded clay, was produced from a naturally sourced clay. For all mixtures, normal weight sand was used as a fine fraction of aggregates, and the portland cement was partially replaced with a limestone powder. The SLWSCC was produced with different water presaturation regimes of the LWAs. The desired initial slump-flow spread was set between 700 and 800 mm. The effect of three superplasticizers was evaluated by testing properties of SLWSCC, normal weight SCC, and paste mixtures. Three SCC fresh properties were measured: the slump-flow, the V-funnel flow time, and the J-ring blocking step. Moreover, the slump-flow loss was evaluated. The degree of segregation was assessed in both fresh and hardened states. Additionally, the hardened density and the compressive strengths were tested. All SLWSCC mixtures were produced with a desired range of slump-flow spread and with satisfactory passing ability assessed with the J-ring test. SLWSCCs prepared with the expanded clay LWA were less sensitive to the variation of water presaturation levels and showed lower viscosity than those made with the sintered pulverized fuel ash LWA. Only mixtures containing SP-3 superplasticizer showed acceptable workability loss resistance. The saturated surface-dry density of all of the mixtures varied in a range of 2,025–2,125??kg/m 3 . Mixtures containing 29% of coarse LWAs and 71% of sand (by mass) had 24-h and 28-day compressive strengths above 20 and 40 MPa, respectively, but the mixtures made with the expanded clay were slightly weaker.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the increase in construction in dense urban environments, the delays associated with managing the material supply chain to site is called into question. Purpose: The aim of this investigation is to gain the perspective of construction contractors operating in a dense urban environment and the resulting strategies adopted to reduce delays in the delivery of materials to site. Methodology: This is achieved through incorporating a comprehensive literature review on the subject in conjunction with industry interviews with construction professionals in the identification of various management issues and corresponding strategies in the reduction of delays in the delivery of materials to site. Findings: The key issue which emerges is the lack of space for unloading bays while the corresponding key strategy is to schedule deliveries outside peak congestion times. Practical Implication: With confined site construction evident throughout the industry and the noted importance of an effective supply chain, the findings here in further assist on-site management in the daily task of ensuring the effective delivery and off-loading of materials in a complex and hazardous environment. Originality/Value: This research aids on-site management of confined site environments in the coordination of the material supply chain to site.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Inner city, confined site construction is quickly becoming the norm within the construction sector. The aim of this paper is to identify and document the effect, if any, that a confined construction site environment has on the productivity of on-site personnel. In order to compile the relevant information and attain appropriate results on the matter in question, a qualitative analytical approach is adopted. This process incorporates multiple cases studies from Ireland, Northern Ireland and USA. From the resulting case studies, a minimum of three individual interviews and focus group seminars are conducted to aid in the collection of the data while also assisting in the confirmation of the factors identified from a critique of the relevant literature. From the resulting case studies and discussions, a list of the key issues pertaining to the on-site productivity of personnel emerged and is documented as follows; 1) Overcrowding of personnel at workstations, 2) Lack of space for the effective movement of personnel on-site, 3) Numerous trades working within the one space on-site. Through identifying the issues highlighted and proactively mitigating or eliminating the factors detailed, on-site management professionals can strive to ensure maximum productivity from the industry’s most important resource – people.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this paper is to identify various managerial issues encountered and resulting strategies adopted, with regards management of materials on confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, for the successful management of such confined environments within the realm of materials management.


Through conducting an extensive literature review and detailed interviews, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The following are the leading issues highlighted; (1)Lack of adequate storage space, (2)Work place becoming over-crowded, (3)Lack of adequate room for the effective handling of materials and (4)Difficult to transport materials around site. The leading managerial strategies to the management of materials on confined construction sites may be listed in order of importance, as follows; (1)Pre-fabrication and pre-assembly, (2)Providing adequate storage, (3)Space scheduling, (4)Just-In-Time delivery techniques, and (5)Effective design site layout.

Based on the research conducted, it can be concluded, that through effective management of the issues identified along with implementing the various strategies highlighted; successful materials management within a confined construction site environment is attainable.


Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) investigating the managerial issues and strategies relating to implementation of materials management in confined construction sites.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The reverse engineering of a skeleton based programming environment and redesign to distribute management activities of the system and thereby remove a potential single point of failure is considered. The Ore notation is used to facilitate abstraction of the design and analysis of its properties. It is argued that Ore is particularly suited to this role as this type of management is essentially an orchestration activity. The Ore specification of the original version of the system is modified via a series of semi-formally justified derivation steps to obtain a specification of the decentralized management version which is then used as a basis for its implementation. Analysis of the two specifications allows qualitative prediction of the expected performance of the derived version with respect to the original, and this prediction is borne out in practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Betelgeuse, a nearby red supergiant, is a runaway star with a powerful stellar wind that drives a bow shock into its surroundings. This picture has been challenged by the discovery of a dense and almost static shell that is three times closer to the star than the bow shock and has been decelerated by some external force. The two physically distinct structures cannot both be formed by the hydrodynamic interaction of the wind with the interstellar medium. Here we report that a model in which Betelgeuse's wind is photoionized by radiation from external sources can explain the static shell without requiring a new understanding of the bow shock. Pressure from the photoionized wind generates a standing shock in the neutral part of the wind and forms an almost static, photoionization-confined shell. Other red supergiants should have significantly more massive shells than Betelgeuse, because the photoionization-confined shell traps up to 35 per cent of all mass lost during the red supergiant phase, confining this gas close to the star until it explodes. After the supernova explosion, massive shells dramatically affect the supernova lightcurve, providing a natural explanation for the many supernovae that have signatures of circumstellar interaction.