63 resultados para office building design
Resumo:
Double Skin Façades (DSFs) are becoming increasingly popular architecture for commercial office buildings. Although DSFs are widely accepted to have the capacity to offer significant passive benefits and enable low energy building performance, there remains a paucity of knowledge with regard to their operation. Identification of the most determinant architectural parameters of DSFs is the focus of ongoing research. This paper presents an experimental and simulation study of a DSF installed on a commercial building in Dublin, Ireland. The DSF is south facing and acts to buffer the building from winter heat losses, but risks enhancing over-heating on sunny days. The façade is extensively monitored during winter months. Computational Fluid Dynamic (CFD) models are used to simulate the convective operation of the DSF. This research concludes DSFs as suited for passive, low energy architecture in temperature climates such as Ireland but identifies issues requiring attention in DSF design.
Resumo:
There is a broad consensus surrounding the ability of building information modelling (BIM) to positively impact a project by enabling greater collaboration. This paper aims to examine the development of BIM and how it can contribute to the evermore present and growing cold-formed steel (CFS) industry. This is achieved thorough a comprehensive literature review and four exploratory interviews with industry experts. Work has been carried out, for the first time, alongside one of the UK’s largest CFS Designer/Fabricators in conjunction with Northern Ireland’s leading Architectural and Town Planning Consultants in the identification and dissemination of information. The capabilities of BIM have been investigated through modeling of simple CFS structures n consultation with the project partners. By scrutinising the literature and associated interviews, the primary opportunities, as well as barriers, of BIM implementation have been investigated in the context of these companies. It is essential to develop greater understanding of the flexibility, adaptability and interoperability of BIM software as the UK construction industry faces a daunting challenge; fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. This paper, and the wider study that it stems from, approaches the problem from a new angle, from sections of the construction industry that have not yet fully embedded BIM.