140 resultados para Private Matching


Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is an implicit assumption in the UK Treasury’s publications on public-private partnerships (PPP) – also more commonly known in the United Kingdom as private finance initiative (PFI) - that accountability and value for money (VFM) are related concepts. While recent academic studies on PPP/PFI (from now on as PFI) have focused on VFM, there is a notable absence of studies exploring the ‘presumed’ relationships between accountability and VFM. Drawing on Dubnick’s (Dubnick and Romzek, 1991, 1993; Dubnick, 1996, 1998, 2003, 2005; Dubnick and Justice, 2002) framework for accountability and PFI literature, we develop a research framework for exploring potential relationships between accountability and VFM in PFI projects by proposing alternative accountability cultures, processes and mechanisms for PFI. The PFI accountability model is then exposed to four criteria - warrantability, tractability, measurability and feasibility. Our preliminary interviews provide us guidance in identifying some of the cultures, processes and mechanisms indicated in our model which should enable future researchers to test not only the UK Government’s claimed relationships between accountability and VFM using more specific PFI empirical data, but also a potential relationship between accountability and performance in general.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose
This study was designed to investigate methods to help patients suffering from unilateral tinnitus synthesizing an auditory replica of their tinnitus.

Materials and methods
Two semi-automatic methods (A and B) derived from the auditory threshold of the patient and a method (C) combining a pure tone and a narrow band-pass noise centred on an adjustable frequency were devised and rated on their likeness over two test sessions. A third test evaluated the stability over time of the synthesized tinnitus replica built with method C, and its proneness to merge with the patient's tinnitus. Patients were then asked to try and control the lateralisation of this single percept through the adjustment of the tinnitus replica level.

Results
The first two tests showed that seven out of ten patients chose the tinnitus replica built with method C as their preferred one. The third test, performed on twelve patients, revealed pitch tuning was rather stable over a week interval. It showed that eight patients were able to consistently match the central frequency of the synthesized tinnitus (presented to the contralateral ear) to their own tinnitus, which leaded to a unique tinnitus percept. The lateralisation displacement was consistent across patients and revealed an average range of 29dB to obtain a full lateral shift from the ipsilateral to the contralateral side.

Conclusions
Although spectrally simpler than the semi-automatic methods, method C could replicate patients' tinnitus, to some extent. When a unique percept between synthesized tinnitus and patients' tinnitus arose, lateralisation of this percept was achieved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose The UK government argues that the benefits of public private partnership (PPP) in delivering public infrastructure stem from: transferring risks to the private sector within a structure in which financiers put their own capital at risk; and, the performance based payment mechanism, reinforced by the due diligence requirements imposed by the lenders financing the projects (HM Treasury, 2010). Prior studies of risk in PPPs have investigated ‘what’ risks are allocated and to ‘whom’, that is to the public or the private sector. The purpose of this study is to examine ‘how’ and ‘why’ PPP risks are diffused by their financiers. Design/methodology/approach This study focuses on the financial structure of PPPs and on their financiers. Empirical evidence comes from interviews conducted with equity and debt financiers. Findings The findings show that the financial structure of the deals generates risk aversion in both debt and equity financiers and that the need to attract affordable finance leads to risk diffusion through a network of companies using various means that include contractual mitigation through insurance, performance support guarantees, interest rate swaps and inflation hedges. Because of the complexity this process generates, both procurers and suppliers need expensive expert advice. The risk aversion and diffusion and the consequent need for advice add cost to the projects impacting on the government’s economic argument for risk transfer. Limitations and implications The empirical work covers the private finance initiative (PFI) type of PPP arrangements and therefore the risk diffusion mechanisms may not be generalisable to other forms of PPP, especially those that do not involve the use of high leverage or private finance. Moreover, the scope of this research is limited to exploring the diffusion of risk in the private sector. Further research is needed on how risk is diffused in other settings and on the value for money implication of risk diffusion in PPP contracts. Originality/value The expectation inherent in PPP is that the private sector will better manage those risks allocated to it and because private capital is at risk, financiers will perform due diligence with the ultimate outcome that only viable projects will proceed. This paper presents empirical evidence that raises questions about these expectations. Key words: public private partnership, risk management, diffusion, private finance initiative, financiers

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Two techniques are demonstrated to produce ultrashort pulse trains capable of quasi-phase-matching high-harmonic generation. The first technique makes use of an array of birefringent crystals and is shown to generate high-contrast pulse trains with constant pulse spacing. The second technique employs a grating-pair stretcher, a multiple-order wave plate, and a linear polarizer. Trains of up to 100 pulses are demonstrated with this technique, with almost constant inter-pulse separation. It is shown that arbitrary pulse separation can be achieved by introducing the appropriate dispersion. This principle is demonstrated by using an acousto-optic programmable dispersive filter to introduce third-and fourth-order dispersions leading to a linear and quadratic variation of the separation of pulses through the train. Chirped-pulse trains of this type may be used to quasi-phase-match high-harmonic generation in situations where the coherence length varies through the medium. (C) 2010 Optical Society of America

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A collection of essays based on the conference of the International Federation for Research in Women's History which was held in Queen's University Belfast in August 2003.

Relevância:

20.00% 20.00%

Publicador: