67 resultados para multi-site analysis


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The site Pilgrimstad in central Sweden has often been cited as a key locality for discussions of ice-free/ice-covered intervals during the Early and Middle Weichselian. Multi-proxy investigations of a recently excavated section at Pilgrimstad now provide a revised picture of the climatic and environmental development between similar to 80 and 36 ka ago. The combination of sedimentology, geochemistry, OSL and 14C dating, and macrofossil, siliceous microfossil and chironomid analyses shows: (i) a lower succession of glaciofluvial/fluvial, lacustrine and glaciolacustrine sediments; (ii) an upper lacustrine sediment sequence; and (iii) Last Glacial Maximum till cover. Microfossils in the upper lacustrine sediments are initially characteristic for oligo- to mesotrophic lakes, and macrofossils indicate arctic/sub-arctic environments and mean July temperatures > 8 degrees C. These conditions were, however, followed by a return to a low-nutrient lake and a cold and dry climate. The sequence contains several hiatuses, as shown by the often sharp contacts between individual units, which suggests that ice-free intervals alternated with possible ice advances during certain parts of the Early and Middle Weichselian.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.

Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.

Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.

Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.

Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper is concerned with assessing the building’s the energy efficiency and qualities of a modular design for the education industry, in order assess the long economic benefits. The research includes a life-cycle energy and cost analysis of the school building design, predicting the impact on the operational cost of the building as a result of the addition of photovoltaic panels. The paper also includes a comparative study between the ECO Modular Solutions building, and a current standard prefabricated school building, quantifying the savings in CO2 emissions and savings in cost.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Multi-vehicle cooperative formation control problem is an important and typical topic of research on multi-agent system. This paper presents a formation stability conjecture to conceive a new methodology for solving the decentralised multi-vehicle formation control problem. It employs the “extension-decomposition-aggregation” scheme to transform the complex multi-agent control problem into a group of sub-problems which is able to be solved conveniently. Based on this methodology, it is proved that if all the individual augmented subsystems can be stabilised by using any approach, the overall formation system is not only asymptotically but also exponentially stable in the sense of Lyapunov within a neighbourhood of the desired formation. Simulation study on 6-DOF aerial vehicles (Aerosonde UAVs) has been performed to verify the achieved formation stability result. The proposed multi-vehicle formation control strategy can be conveniently extended to other cooperative control problems of multi-agent systems.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper we make use of the 9-year old wave of the Growing Up in Ireland study to analyse multidimensional deprivation in Ireland. The Alkire and Foster adjusted head count ratio approach (AHCR; 2007, 2011a, 2011b) applied here constitutes a significant improvement on union and intersection approaches and allows for the decomposition of multidimensional poverty in terms of dimensions and sub-groups. The approach involves a censoring of data such that deprivations count only for those above the specified multidimensional threshold leading to a stronger set of interrelationships between deprivation dimensions. Our analysis shows that the composition of the adjusted head ratio is influenced by a range of socio-economic factors. For less-favoured socio-economic groups dimensions relating to material deprivation are disproportionately represented while for the more advantaged groups, those relating to behavioral and emotional issues and social interaction play a greater role. Notwithstanding such variation in composition, our analysis showed that the AHCR varied systematically across categories of household type, and the social class, education and age group of the primary care giver. Furthermore, these variables combined in a cumulative manner. The most systematic variation was in relation to the head count of those above the multidimensional threshold rather than intensity, conditional on being above that cut-off point. Without seeking to arbitrate on the relative value of composite indices versus disaggregated profiles, our analysis demonstrates that there is much to be gained from adopting an approach with clearly understood axiomatic properties. Doing so allows one to evaluate the consequences of the measurement strategy employed for the understanding of levels of multidimensional deprivation, the nature of such deprivation profiles and socio-economic risk patterns. Ultimately it permits an informed assessment of the strengths and weaknesses of the particular choices made.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Reducing wafer metrology continues to be a major target in semiconductor manufacturing efficiency initiatives due to it being a high cost, non-value added operation that impacts on cycle-time and throughput. However, metrology cannot be eliminated completely given the important role it plays in process monitoring and advanced process control. To achieve the required manufacturing precision, measurements are typically taken at multiple sites across a wafer. The selection of these sites is usually based on a priori knowledge of wafer failure patterns and spatial variability with additional sites added over time in response to process issues. As a result, it is often the case that in mature processes significant redundancy can exist in wafer measurement plans. This paper proposes a novel methodology based on Forward Selection Component Analysis (FSCA) for analyzing historical metrology data in order to determine the minimum set of wafer sites needed for process monitoring. The paper also introduces a virtual metrology (VM) based approach for reconstructing the complete wafer profile from the optimal sites identified by FSCA. The proposed methodology is tested and validated on a wafer manufacturing metrology dataset. © 2012 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper, the overall formation stability of unmanned multi-vehicle is mathematically presented under interconnection topologies. A novel definition of formation error is first given and followed by the proposed formation stability hypothesis. Based on this hypothesis, a unique extension-decomposition-aggregation scheme is then employed to support the stability analysis for the overall multi-vehicle formation under a mesh topology. It is proved that the overall formation control system consisting of N number of nonlinear vehicles is not only asymptotically, but also exponentially stable in the sense of Lyapunov within a neighbourhood of the desired formation. This technique is shown to be applicable for a mesh topology but is equally applicable for other topologies. Simulation study of the formation manoeuvre of multiple Aerosonde UAVs, in 3D-space, is finally carried out verifying the achieved formation stability result.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

BACKGROUND AND OBJECTIVE: Human research ethics committees provide essential review of research projects to ensure the ethical conduct of human research. Several recent reports have highlighted a complex process for successful application for human research ethics committee approval, particularly for multi-centre studies. Limited resources are available for the execution of human clinical research in Australia and around the world.

METHODS: This report overviews the process of ethics approval for a National Health and Medical Research Council-funded multi-centre study in Australia, focussing on the time and resource implications of such applications in 2007 and 2008.

RESULTS: Applications were submitted to 16 hospital and two university human research ethics committees. The total time to gain final approval from each committee ranged between 13 and 77 days (median = 46 days); the entire process took 16 months to complete and the research officer's time was estimated to cost $A34 143.

CONCLUSIONS: Obstacles to timely human research ethics committee approval are reviewed, including recent, planned and potential initiatives that could improve the ethics approval of multi-centre research.