48 resultados para electric power plant


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Alkali activated binders, based on ash and slag, also known as geopolymers, can play a key role in reducing the carbon footprint of the construction sector by replacing ordinary Portland cement in some concretes. Since 1970s, research effort has been ongoing in many research institutions. In this study, pulverized fuel ash (pfa) from a UK power plant, ground granulated blast furnace slag (ggbs) and combinations of the two have been investigated as geopolymer binders for concrete applications. Activators used were sodium hydroxide and sodium silicate solutions. Mortars with sand/binder ratio of 2.75 with several pfa and ggbs combinations have been mixed and tested. The optimization of alkali dosage (defined as the Na2O/binder mass ratio) and modulus (defined as the Na2O/SiO2 mass ratio) resulted in strengths in excess of 70 MPa for tested mortars. Setting time and workability have been considered for the identification of the best combination of pfa/ggbs and alkali activator dosage for different precast concrete products. Geopolymer concrete building blocks have been replicated in laboratory and a real scale factory trial has been successfully carried out. Ongoing microstructural characterization is aiming to identify reaction products arising from pfa/ggbs combinations.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Power electronics plays an important role in the control and conversion of modern electric power systems. In particular, to integrate various renewable energies using DC transmissions and to provide more flexible power control in AC systems, significant efforts have been made in the modulation and control of power electronics devices. Pulse width modulation (PWM) is a well developed technology in the conversion between AC and DC power sources, especially for the purpose of harmonics reduction and energy optimization. As a fundamental decoupled control method, vector control with PI controllers has been widely used in power systems. However, significant power loss occurs during the operation of these devices, and the loss is often dissipated in the form of heat, leading to significant maintenance effort. Though much work has been done to improve the power electronics design, little has focused so far on the investigation of the controller design to reduce the controller energy consumption (leading to power loss in power electronics) while maintaining acceptable system performance. This paper aims to bridge the gap and investigates their correlations. It is shown a more thoughtful controller design can achieve better balance between energy consumption in power electronics control and system performance, which potentially leads to significant energy saving for integration of renewable power sources.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Displacement of fossil fuel-based power through biomass co-firing could reduce the greenhouse gas (GHG) emissions from fossil fuels. In this study, data-intensive techno-economic models were developed to evaluate different co-firing technologies as well as the configurations of these technologies. The models were developed to study 60 different scenarios involving various biomass feedstocks (wood chips, wheat straw, and forest residues) co-fired either with coal in a 500 MW subcritical pulverized coal (PC) plant or with natural gas in a 500 MW natural gas combined cycle (NGCC) plant to determine their technical potential and costs, as well as to determine environmental benefits. The results obtained reveal that the fully paid-off coal-fired power plant co-fired with forest residues is the most attractive option, having levelized costs of electricity (LCOE) of $53.12–$54.50/MW h and CO2 abatement costs of $27.41–$31.15/tCO2. When whole forest chips are co-fired with coal in a fully paid-off plant, the LCOE and CO2 abatement costs range from $54.68 to $56.41/MW h and $35.60 to $41.78/tCO2, respectively. The LCOE and CO2 abatement costs for straw range from $54.62 to $57.35/MW h and $35.07 to $38.48/tCO2, respectively.