48 resultados para Transport Construction Project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is continuing to evolve and develop as the construction industry progresses towards level 2 maturity. However, one of the core barriers in this progression is the aspect of interoperability between software packages. This research and paper stems from a Knowledge Transfer Partnership (KTP) where both industry and academia come together to address this shortcoming within the sector. One of the core objectives of this partnership and the aim of this study is investigating potential solutions to this barrier, while also developing best working practices to be applied in industry. Using one of the case studies from this partnership (a temporary steel structure), this paper demonstrates a potential solution to addressing interoperability within structural analysis and detailing packages, MasterSeries and Revit respectively. The findings of the research indicate that a process based approach rather than that of additional software coding as being the preferred solution. The results of this preliminary research will aid in the development of the topic of interoperability within the sector, while also developing the knowledge and competencies of the parties within the KTP. The findings are explored further, by providing an overview of the resolution process adopted in this case study, in overcoming the interoperability that arose as the project progressed. It is envisaged that this study will assist the construction sector and its adoption of BIM technologies, while also addressing the critical aspect of operability between software.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Early contractor involvement is a topic that has attracted attention from construction practitioners and researchers in the UK since the 1990s. It has been adopted to introduce construction knowledge and experience to the design process, and to integrate design with construction. In contrast with the limited number of previous studies on early contractor involvement, which used case studies, a questionnaire survey was conducted in this study, to investigate the application of early contractor involvement in current practice and its impact on project performance in terms of time, cost and quality. From an analysis of the questionnaire results, early contractor involvement is found to be increasingly used in the construction industry, and to have a significant impact on cost and time performance. This research provides empirical evidence related to the practice of early contractor involvement. It demonstrates the major influence of early contractor involvement on management processes and working relationships during a project, which contribute to performance improvement and project success.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Run Off Road (ROR) crashes are road accidents that often result in severe injuries or fatalities. To reduce the severity of ROR crashes, “forgiving roadsides” need to be designed and this includes identifying situations where there is a need for a Vehicle Restraint System (VRS) and what appropriate VRS should be selected for a specific location and traffic condition. Whilst there are standards covering testing, evaluation and classification of VRS within Europe (EN1317 parts 1 to 8), their selection, location and installation requirements are typically based upon national guidelines and standards, often produced by National Road Authorities (NRA) and/or overseeing organisations. Due to local conditions, these national guidelines vary across Europe.
The European SAVeRS project funded by CEDR has developed a practical and readily understandable VRS guidance document and a user-friendly software tool which allow designers and road administrations to select the most appropriate solution in different road and traffic conditions.
This paper describes the main outcomes of the project, the process to select the most appropriate roadside barrier, and the user friendly SAVeRS tool.