59 resultados para Box Bridges


Relevância:

20.00% 20.00%

Publicador:

Resumo:

As a consequence of increased levels of flooding, largely attributable to urbanization of watersheds (and perhaps climate change, more frequent extreme rainfall events are occurring and threatening existing critical infrastructure. Many of which are short-span bridges over relatively small waterways (e.g., small rivers, streams and canals). Whilst these short-span bridges were designed, often many years ago, to pass relatively minor the then standard return-period floods, in recenttimes the failure incidence of such short-span bridges has been noticeably increasing. This is suggestive of insufficient hydraulic capacity or alternative failure mechanism not envisaged at the time of design e.g. foundation scour or undermining. This paper presen ts, and draws lessons, from bridge failures in Ireland and the USA. For example, in November 2009, the UK and Ireland were subjected to extraordinarily severe weather conditions for several days. The resulting flooding led to the collapse of three UK bridges that were generally 19th century masonry arch bridges, withrelatively shallow foundations. Parallel failure events have been observed in the USA. To date, knowledge of the combined effect of waterway erosion, bridge submergence, and geotechnical collapse has not been adequately studied. Recent research carried out considered the hydraulic analysis of short span bridges under flood conditions, but no consideration was given towards the likely damage to these structures due to erosive coupling of hydraulic and geotechnical factors. Some work has been done to predict the discharge downstream of an inundated arch, focusing onpredicting afflux, as opposed to bridge scour, under both pressurized and free-surface flows, but no ! predictive equation for scour under pressurized conditions was ever considered. The case studies this paper presents will be augmented by the initial findings from the laboratory experiments investigating the effects of surcharged flow and subsequent scour within the vicinity of single span arch bridges. Velocities profiles will be shown within the vicinity of the arch, in addition to the depth of consequent scour, for a series of flows and model spans. The data will be presented and correlated to the most recent predictive equations for submerged contraction and abutment scour. The accuracy of these equations is examined, and the findings used as a basis for developing further studies in relation to short span bridges.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Externally bonding of FRP composites is an effective technique for retrofitting historical masonry arch structures. A major failure mode in such strengthened structures is the debonding of FRP from the masonry. The bond behaviour between FRP and masonry thus plays a crucial role in these structures. Major challenges exist in the finite element modelling of such structures, such as modelling of mixed Mode-I and Mode-II bond behaviour between the FRP and the curved masonry substrate, modelling of existing damages in the masonry arches, consideration of loading history in the unstrengthened and strengthened structure etc. This paper presents a rigorous FE model for simulating FRP strengthened masonry arch structures. A detailed solid model was developed for simulating the masonry and a mixed-mode interface model was used for simulating the FRP-to-masonry bond behaviour. The model produces results in very close agreement with test results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bridge construction responds to the need for environmentally friendly design of motorways and facilitates the passage through sensitive natural areas and the bypassing of urban areas. However, according to numerous research studies, bridge construction presents substantial budget overruns. Therefore, it is necessary early in the planning process for the decision makers to have reliable estimates of the final cost based on previously constructed projects. At the same time, the current European financial crisis reduces the available capital for investments and financial institutions are even less willing to finance transportation infrastructure. Consequently, it is even more necessary today to estimate the budget of high-cost construction projects -such as road bridges- with reasonable accuracy, in order for the state funds to be invested with lower risk and the projects to be designed with the highest possible efficiency. In this paper, a Bill-of-Quantities (BoQ) estimation tool for road bridges is developed in order to support the decisions made at the preliminary planning and design stages of highways. Specifically, a Feed-Forward Artificial Neural Network (ANN) with a hidden layer of 10 neurons is trained to predict the superstructure material quantities (concrete, pre-stressed steel and reinforcing steel) using the width of the deck, the adjusted length of span or cantilever and the type of the bridge as input variables. The training dataset includes actual data from 68 recently constructed concrete motorway bridges in Greece. According to the relevant metrics, the developed model captures very well the complex interrelations in the dataset and demonstrates strong generalisation capability. Furthermore, it outperforms the linear regression models developed for the same dataset. Therefore, the proposed cost estimation model stands as a useful and reliable tool for the construction industry as it enables planners to reach informed decisions for technical and economic planning of concrete bridge projects from their early implementation stages.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Contemporary architecture has tended to increase envelope insulation levels in an unceasing effort to reduce U-values. Traditional masonry architecture in contrast was devoid of insulation, except for the inherent insulative nature of vernacular materials. Also the consistency of the outer membrane of the building skin diminished any impact due to bridging. In contemporary highly insulated walls bridges are numerous due to the necessity to bind inner and outer structural skins through insulation layers. This paper examines thermal bridging in an example of contemporary façade design and compares it with an example of traditional vernacular architecture currently being researched which is characterized by a lack of bridging elements. Focus is given to heavy weight materials of high thermal mass, which appropriately for passive architecture help moderate fluctuations in internal temperature. In an extensive experimental study samples of highly insulated precast concrete sandwich panels and lime rendered masonry walls are tested in a guarded hot-box. The building construction methods are compared for static and dynamic thermal transmittance, via heat flux and surface temperature differential measurements. Focus is given to the differential heat loss due to the thermal bridging in the sandwich panels and its associated impact on overall heat loss relative to traditional masonry construction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bridge structures are subject to continuous degradation due to the environment, ageing and excess loading. Monitoring of bridges is a key part of any maintenance strategy as it can give early warning if a bridge is becoming unsafe. This paper will theoretically assess the ability of a vehicle fitted with accelerometers on its axles to detect changes in damping of bridges, which may be the result of damage. Two vehicle models are used in this investigation. The first is a two degree-of-freedom quarter-car and the second is a four degree-of-freedom halfcar. The bridge is modelled as a simply supported beam and the interaction between the vehicle and the bridge is a coupled dynamic interaction algorithm. Both smooth and rough road profiles are used in the simulation and results indicate that changes in bridge damping can be detected by the vehicle models for a range of vehicle velocities and bridge spans.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes a ‘drive-by’ method of bridge inspection using an instrumented vehicle. Accelerometers on the vehicle are proposed as a means of detecting damage on the bridge in the time it takes for the vehicle to cross the bridge at full highway speed. For a perfectly smooth road profile, the method is shown to be feasible. Changes in bridge damping, which is an indicator of damage, are clearly visible in the acceleration signal of a quarter-car vehicle on a smooth road surface modelled using MatLab. When road profile is considered, the influence of changes in bridge damping on the vehicle acceleration signal is much less clear. However, when a half-car model is used on a road with a rough profile, it is again possible to detect changes in bridge damping, provided the vehicle has two identical axles.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PTF11iqb was initially classified as a TypeIIn event caught very early after explosion. It showed narrow Wolf-Rayet (WR) spectral features on day 2, but the narrow emission weakened quickly and the spectrum morphed to resemble those of Types II-L and II-P. At late times, Halpha emission exhibited a complex, multipeaked profile reminiscent of SN1998S. In terms of spectroscopic evolution, we find that PTF11iqb was a near twin of SN~1998S, although with weaker interaction with circumstellar material (CSM) at early times, and stronger CSM interaction at late times. We interpret the spectral changes as caused by early interaction with asymmetric CSM that is quickly (by day 20) enveloped by the expanding SN ejecta photosphere, but then revealed again after the end of the plateau when the photosphere recedes. The light curve can be matched with a simple model for weak CSM interaction added to the light curve of a normal SN~II-P. This plateau requires that the progenitor had an extended H envelope like a red supergiant, consistent with the slow progenitor wind speed indicated by narrow emission. The cool supergiant progenitor is significant because PTF11iqb showed WR features in its early spectrum --- meaning that the presence of such WR features in an early SN spectrum does not necessarily indicate a WR-like progenitor. [abridged] Overall, PTF11iqb bridges SNe~IIn with weaker pre-SN mass loss seen in SNe II-L and II-P, implying a continuum between these types.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper argues that the modern barn in Ireland is a complex social and architectural phenomena that is without, or has yet to find, a satisfactory discourse. Emerging in the middle third of the twentieth century, the modern barn – replete with corrugated iron and I-sections – continues to represent a presence in the Irish landscape whose ubiquity is as emphatic as its flexibility. It is, however, its universal properties that begin to suggest connections with wider narratives. The modernising aspects of the barn that appear in the 1920s and 30s begin to conflate with a rhetoric of architectural modernism which was simultaneously appearing across Europe. But while the relationship between high modernism’s critique of what it divined as the inspirational qualities of utilitarian buildings – Walter Gropius on grain silos, Le Corbusier on aircraft hangers etc. – has been well-documented, in Ireland this relationship perhaps contains another layer of complexity.
The barn’s consolidation as a modern type coincided with the search for a nation’s cultural identity after centuries of colonial rule. This tended to be an introspective vision that prioritised rural space over urban space, agriculture over industry, and imagined the small farm as a central tenet in the construction of a new State. This paper suggests that the twentieth-century barn – as a product of the mechanisation of agriculture promoted by the new administrations – is an iconic structure, emblematic of attempts to reconcile the contradictory forces and imagery of modernity with the mores of a traditional society. Moreover, given a cultural purview that was often ambivalent or even hostile to the ideologies and forms of modernity, the barn in Ireland is, perhaps, not so much the inspiration but the realisation of an architectural modernism in that country at its most pervasive, enduring and unself-conscious.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cancer clinical trials have been one of the key foundations for significant advances in oncology. However, there is a clear recognition within the academic, care delivery and pharmaceutical/biotech communities that our current model of clinical trial discovery and development is no longer fit for purpose. Delivering transformative cancer care should increasingly be our mantra, rather than maintaining the status quo of, at best, the often miniscule incremental benefits that are observed with many current clinical trials. As we enter the era of precision medicine for personalised cancer care (precision and personalised medicine), it is important that we capture and utilise our greater understanding of the biology of disease to drive innovative approaches in clinical trial design and implementation that can lead to a step change in cancer care delivery. A number of advances have been practice changing (e.g. imatinib mesylate in chronic myeloid leukaemia, Herceptin in erb-B2-positive breast cancer), and increasingly we are seeing the promise of a number of newer approaches, particularly in diseases like lung cancer and melanoma. Targeting immune checkpoints has recently yielded some highly promising results. New algorithms that maximise the effectiveness of clinical trials, through for example a multi-stage, multi-arm type design are increasingly gaining traction. However, our enthusiasm for the undoubted advances that have been achieved are being tempered by a realisation that these new approaches may have significant cost implications. This article will address these competing issues, mainly from a European perspective, highlight the problems and challenges to healthcare systems and suggest potential solutions that will ensure that the cost/value rubicon is addressed in a way that allows stakeholders to work together to deliver optimal cost-effective cancer care, the benefits of which can be transferred directly to our patients.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The potential benefits of combining the elegance of the stress ribbon concept with the robustness and speed of construction of the FlexiArch is discussed. In combination, multi-span pedestrian/cycle bridges which are innovative, highly durable and have optimal full life cycle costs can be produced with lengths of over 100 m. As the stress ribbon system is well known, the main emphasis of this paper will be on the FlexiArch. Since 1900 few arch bridges have been built, but with the development of the innovative FlexiArch this trend can be reversed as they can be installed rapidly, are cost competitive, have all the attributes of masonry arches and are very sustainable. Thus the FlexiArch represents a very attractive alternative to heavily reinforced cast in situ arches currently used in combination with stress ribbon deck systems.