40 resultados para Construction industry Management Computer programs


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - To identify the critical factors causing construction disputes in Small to Medium Enterprises (SMEs) in Ireland during the recent recession period of 2007 to 2013.
Design/Methodology/Approach - A mixed method approach incorporating a literature review, case studies and questionnaire survey, with results analysed using exploratory (data reduction) factor analysis.
Findings - The results indicate seven core critical factors which result in construction disputes in SMEs in Ireland during a recession: Payment and extras; Physical work conditions; Poor financial/legal practise; Changes to the agreed scope of works; Time overrun; Defects; and Requests for increase in speed of project and long-term defects.
Research Limitations/Implications - With Ireland emerging from the current economic recession and the prevalence of SMEs to the construction sector, it is essential to document the core critical factors of construction disputes which emerge within this particular segment of the built environment.
Practical Implications - To address the adversarial nature of the construction sector and the prevalence of SMEs, it is essential to identify and document the critical factors of construction disputes within this remit. It is envisaged that the results of this research will be acknowledged, and the recommendations adopted, by construction SMEs, particularly within Ireland, as they emerge from the economic recession.
Originality/Value - This paper fulfils a gap in knowledge with the emergence of the economic recession and the identification of critical factors of construction dispute within SMEs in the Irish construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In comparison to the rest of the United Kingdom (UK) the Northern Irish Construction Industry was disproportionately affected by the recent economic recession. During this period, use of the New Engineering Contract (NEC) has proliferated in the public sector, however no study has been undertaken to examine the impact of the recession on this contract in Northern Ireland. The aim of this paper is to explore NEC contract implementation in Northern Ireland and the impact of the recession on its operation. A qualitative methodology is adopted using a literature review and semi structured interviews with six construction professionals. A qualitative analysis identifies themes and issues arising exploring connections and links between them using thematic coding. The initial findings are that the introduction of the NEC contract in Northern Ireland makes demands of contractors and consultants in terms of additional resources and training. Some consultants show a clear lack of understanding of the contract and its provisions. Whilst there is general agreement that the contract does help to stimulate good project management, the interviewees find the contract time consuming and complicated to administer, describing it as “unforgiving for the architect and unforgiving to the contractor.” Due to the impact of the recession, both contractors and consultants are still reporting a drop in income from pre-recession levels. Project resourcing levels have dropped significantly since the onset of the recession. Adversarial and opportunistic behaviour has increased. Many consultants and contractors are struggling to adequately administer the NEC contract at current income levels. The introduction of the NEC contract and the economic recession have exerted opposing forces on the implementation of the contract, hindering its execution. As the pressures exerted by the economic recession abate and a greater understanding of the contract develops, these opposing forces will ease leading to a more consistent implementation of the contract.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The importance of inter-organizational trust to project success has been increasingly highlighted in the construction industry. This study aims to explore the role of trust between project parties. It adopts a combination of quantitative and qualitative methodologies. Based on the analysis of the responses of a questionnaire survey, trust is demonstrated to have a significant contribution to the development of cooperative or collaborative relationships; fostering trust proves to have a major influence on the improvement of project performance; and some relationship and performance indicators are found to have closer associations with trust than others so that trust is more important to
the development of relationship and the improvement of performance in these aspects. The analysis of questionnaire responses also provides significant evidence for the reduction in monitoring and control following the increase of mutual trust. The questionnaire survey is followed by a series of expert interviews, both of which contribute to the establishment of a model that links trust with relationship and performance and distinguishes the new approach that is based on trust from the traditional mechanism that relies on monitoring and control.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Bridge construction responds to the need for environmentally friendly design of motorways and facilitates the passage through sensitive natural areas and the bypassing of urban areas. However, according to numerous research studies, bridge construction presents substantial budget overruns. Therefore, it is necessary early in the planning process for the decision makers to have reliable estimates of the final cost based on previously constructed projects. At the same time, the current European financial crisis reduces the available capital for investments and financial institutions are even less willing to finance transportation infrastructure. Consequently, it is even more necessary today to estimate the budget of high-cost construction projects -such as road bridges- with reasonable accuracy, in order for the state funds to be invested with lower risk and the projects to be designed with the highest possible efficiency. In this paper, a Bill-of-Quantities (BoQ) estimation tool for road bridges is developed in order to support the decisions made at the preliminary planning and design stages of highways. Specifically, a Feed-Forward Artificial Neural Network (ANN) with a hidden layer of 10 neurons is trained to predict the superstructure material quantities (concrete, pre-stressed steel and reinforcing steel) using the width of the deck, the adjusted length of span or cantilever and the type of the bridge as input variables. The training dataset includes actual data from 68 recently constructed concrete motorway bridges in Greece. According to the relevant metrics, the developed model captures very well the complex interrelations in the dataset and demonstrates strong generalisation capability. Furthermore, it outperforms the linear regression models developed for the same dataset. Therefore, the proposed cost estimation model stands as a useful and reliable tool for the construction industry as it enables planners to reach informed decisions for technical and economic planning of concrete bridge projects from their early implementation stages.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is continuing to evolve and develop as the construction industry progresses towards level 2 maturity. However, one of the core barriers in this progression is the aspect of interoperability between software packages. This research and paper stems from a Knowledge Transfer Partnership (KTP) where both industry and academia come together to address this shortcoming within the sector. One of the core objectives of this partnership and the aim of this study is investigating potential solutions to this barrier, while also developing best working practices to be applied in industry. Using one of the case studies from this partnership (a temporary steel structure), this paper demonstrates a potential solution to addressing interoperability within structural analysis and detailing packages, MasterSeries and Revit respectively. The findings of the research indicate that a process based approach rather than that of additional software coding as being the preferred solution. The results of this preliminary research will aid in the development of the topic of interoperability within the sector, while also developing the knowledge and competencies of the parties within the KTP. The findings are explored further, by providing an overview of the resolution process adopted in this case study, in overcoming the interoperability that arose as the project progressed. It is envisaged that this study will assist the construction sector and its adoption of BIM technologies, while also addressing the critical aspect of operability between software.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Early contractor involvement is a topic that has attracted attention from construction practitioners and researchers in the UK since the 1990s. It has been adopted to introduce construction knowledge and experience to the design process, and to integrate design with construction. In contrast with the limited number of previous studies on early contractor involvement, which used case studies, a questionnaire survey was conducted in this study, to investigate the application of early contractor involvement in current practice and its impact on project performance in terms of time, cost and quality. From an analysis of the questionnaire results, early contractor involvement is found to be increasingly used in the construction industry, and to have a significant impact on cost and time performance. This research provides empirical evidence related to the practice of early contractor involvement. It demonstrates the major influence of early contractor involvement on management processes and working relationships during a project, which contribute to performance improvement and project success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The risks associated with zoonotic infections transmitted by companion animals are a serious public health concern: the control of zoonoses incidence in domestic dogs, both owned and stray, is hence important to protect human health. Integrated dog population management (DPM) programs, based on the availability of information systems providing reliable data on the structure and composition of the existing dog population in a given area, are fundamental for making realistic plans for any disease surveillance and action system. Traceability systems, based on the compulsory electronic identification of dogs and their registration in a computerised database, are one of the most effective ways to ensure the usefulness of DPM programs. Even if this approach provides many advantages, several areas of improvement have emerged in countries where it has been applied. In Italy, every region hosts its own dog register but these are not compatible with one another. This paper shows the advantages of a web-based-application to improve data management of dog regional registers. The approach used for building this system was inspired by farm animal traceability schemes and it relies on a network of services that allows multi-channel access by different devices and data exchange via the web with other existing applications, without changing the pre-existing platforms. Today the system manages a database for over 300,000 dogs registered in three different Italian regions. By integrating multiple Web Services, this approach could be the solution to gather data at national and international levels at reasonable cost and creating a traceability system on a large scale and across borders that can be used for disease surveillance and development of population management plans. © 2012 Elsevier B.V.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Large construction projects create numerous hazards, making it one of the most dangerous industries in which to work. This element of risk increases in urban areas and can have a negative impact on the external stakeholders associated with the project, along with their surrounding environments. The aim of this paper is to identify and document, in an urban context, the numerous issues encountered by on-site project managers from external stakeholders and how they affect a construction project. In addressing this aim, the core objective is to identify what issues are involved in the management of these stakeholders. In order to meet this requirement, a qualitative methodology encompassing an informative literature review followed by five individual case study interviews. The data gathered is assessed qualitatively using mind mapping software. A number of issues are identified which have an impact on the external stakeholders involved, and also how they affected proceedings on site. Collectively the most commonly occurring issues are environmental, legal, health and safety and communication issues. These ranged from road closures and traffic disruption to noise, dust and vibrations from site works. It is anticipated that the results of this study will assist and aid project managers in identifying issues considering external stakeholders, particularly on urban construction projects. A wide range of issues can develop depending on the complexity and nature of each project, but this research will illustrate and reinforce to project managers, that identifying issues early, effective communication and appropriate liaising can be used to manage the issues considering external stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In May 2006, the NEC contract was introduced as the preferred contract for Northern Ireland public sector works. This was subsequently followed by the 2007 economic crash and ensuing recession, which continues to affect the Northern Ireland Construction Industry, to a greater extent than the remainder of the United Kingdom (UK). However, use of the NEC contract has increased during this period, particularly in the public sector. There has been debate in the literature regarding the impact of the NEC contract on adversarial behaviour, but little consideration of the impact of external economic factors on the use of the NEC contract. Using a sequential mixed method approach, the study aims to fill this gap in knowledge, through examination of the impact the economic downturn has had on the operation of the NEC contract in Northern Ireland. Qualitative and quantitative findings show that the demands placed by the NEC contract, and the effects of the economic recession, have exerted opposing forces contract implementation, thus hindering its execution. The findings can lead to a deeper understanding, in the context of both industry and academia, of situations where a lack of resources may negatively impact the operation of the NEC contract.