28 resultados para management projects


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – This paper explores the factors which determine the degree of knowledge transfer in inter-firm new product development projects. We test a theoretical model exploring how inter-firm knowledge transfer is enabled or hindered by a buyer’s learning intent, the degree of supplier protectiveness, inter-firm knowledge ambiguity, and absorptive capacity. Design/methodology/approach – A sample of 153 R&D intensive manufacturing firms in the UK automotive, aerospace, pharmaceutical, electrical, chemical, and general manufacturing industries were used to test the framework. Two-step structural equation modeling in AMOS 7.0 was used to analyse the data. Findings – Our results indicate that a buyer’s learning intent increases inter-firm knowledge transfer, but also acts as an incentive for suppliers to protect their knowledge. Such defensive measures increase the degree of inter-firm knowledge ambiguity, encouraging buyer firms to invest in absorptive capacity as a means to interpret supplier knowledge, but also increase the degree of knowledge transfer. Practical implications – Our paper illustrates the effects of focusing on acquisition, rather than accessing, supplier technological knowledge. We show that an overt learning strategy can be detrimental to knowledge transfer between buyer-supplier, as supplier’s react by restricting the flow of information. Organisations are encouraged to consider this dynamic when engaging in multi-organisational new product development projects. Originality/value – This paper examines the dynamics of knowledge transfer within inter-firm NPD projects, showing how transfer is influenced by the buyer firm’s learning intention, supplier’s response, characteristics of the relationship and knowledge to be transferred.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Over the years, build-operate-transfer (BOT) has continuously attracted research interests. Many studies on BOT have been carried out. Variations of BOT such as build-own-operate-transfer and build-own-operate have also been reported in some relevant publications. However, few investigations thus far have been conducted for transfer-operate-transfer (TOT). Therefore, there is a knowledge gap in this particular field. TOT is a new model that is suitable for existing infrastructure and public utility projects formerly funded by the governments and currently operated by state-owned enterprises. It refers to the transfer of a running public project to a foreign business or domestic private entity. Based on four case studies carried out in the Chinese water supply industry, this paper examines why there is an increasing need for TOT projects and identifies the distinctive features of TOT practice in China. This is followed by an introduction of a framework of critical success factors (CSFs) for TOT projects. The most important factors include project profitability, asset quality, fair risk allocation, competitive tendering, internal coordination within government, employment of professional advisors, corporate governance, and government supervision. The identification of CSFs provides a useful guidance to project parties planning to participate in TOT practice.


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: This paper investigates the link between two knowledge areas that have not been previously linked conceptually; stakeholder management and corporate culture. Focussing on the UK Construction Industry, the research study demonstrates mutual dependency of each of these areas on the other and establishes a theoretical framework with real potential to impact positively upon industry.

Design/methodology/approach: The study utilises both qualitative and quantitative data collection and then analysis to produce results contributing to the final framework. Semi-structured interviews were used and analysed through a cognitive mapping procedure. The result of this stage, set in the context of previous research, facilitated a questionnaire to be developed which helped gather quantitative values from a larger sample to enhance the final framework.

Findings: The data suggests that stakeholder management and corporate culture are key areas of an organisation’s success, and that this importance will only grow in future. A clearly identifiable relationship was established between the two theoretical areas and a framework developed and quantified.

Originality/value: It is evident that change is needed within the UK Construction Industry. Companies must employ ethical and social stakeholder management and manage their corporate culture like any other aspect of their business. Successfully doing this will lead to more successful projects, better reputation and survival. The findings of this project begin to show how change may occur and how companies might intentionally deploy advantageous configurations of corporate culture and stakeholder management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper we seek to show how marketing activities inscribe value on business model innovation, representative of an act, or sequence of socially interconnecting acts. Theoretically we ask two interlinked questions: (1) how can value inscriptions contribute to business model innovations? (2) how can marketing activities support the inscription of value on business model innovations? Semi-structured in-depth interviews were conducted with the thirty-seven members from across four industrial projects commercializing disruptive digital innovations. Various individuals from a diverse range of firms are shown to cast relevant components of their agency and knowledge on business model innovations through negotiation as an ongoing social process. Value inscription is mutually constituted from the marketing activities, interactions and negotiations of multiple project members across firms and functions to counter destabilizing forces and tensions arising from the commercialization of disruptive digital innovations. This contributes to recent conceptual thinking in the industrial marketing literature, which views business models as situated within dynamic business networks and a context-led evolutionary process. A contribution is also made to debate in the marketing literature around marketing's boundary-spanning role, with marketing activities shown to span and navigate across functions and firms in supporting value inscriptions on business model innovations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Increased globalisation within the British AEC (Architectural, Engineering and Construction) sector has increased the need for companies to transfer staff to manage their overseas operations. To be able to perform abroad, expatriates must harmonise themselves to the conditions prevailing in the host country. These include getting accustomed to living, working and interacting with the host country nationals. The process is commonly referred to as 'cross-cultural adjustment'. Various factors influence the process of adjustment. In order to identify these issues, a qualitative study was undertaken, which mainly comprised of comprehensive literature review, individual interviews and focus group discussion with British expatriates working on international AEC assignments in Middle Eastern countries. Through interpretative approach, the current study aims to understand the concept of cross-cultural adjustment of British Expatriates based in Middle East and their influencing factors.

The findings suggest that success of expatriation does not entirely rest on an expatriate's ability but also on organisational support and assistance that expatriates receive prior to and during the assignment. Organisational factors such as selection mechanisms, job design, training, logistical and social support, mentoring, etc., influence various facets of expatriate adjustment. Striking cultural contrasts between British and Arab culture both in work and non work situations also dictate the level of support required by the expatriate, suggesting that relocation to less developed, remote or politically unstable regions, demands additional support and consideration by the parent company. This study is relevant to the AEC companies employing British expatriates, who need to be cognisant of the issues highlighted above to make rational and informed decisions when handling international assignments in the Middle East.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Larsen and Toubro (L&T) Limited is India’s largest construction conglomerate. L&T’s expertise is harnessed to execute high value projects that demand adherence to stringent timelines in a scenario where disparate disciplines of engineering are required to be coordinated on a critical path. However, no company can acquire such a feat without systematic management of its human resource. An investigation on the human resource management practices in orienting L&T’s success can help to identify some of the ethical human resource practices, especially in the context of Indian market. Accordingly, a well-designed employee satisfaction survey was conducted for assessment of the HRM practices being followed in L&T. Unlike other companies, L&T aims to meet the long-term needs of its employees rather than short-term needs. There were however few areas of concerns, such as yearly appraisal system and equality to treat the employees. It is postulated that the inequality to treat the male and female employees is primarily a typical stereotype due to the fact that construction is conventionally believed to be a male dominant activity. A periodic survey intended to provide 360° feedback system can help to avoid such irregularities. This study is thus expected to provide healthy practices of HRM to nurture the young talents of India. This may help them to evaluate their decisions by analyzing the complex relationship between HRM practices and output of an organization.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ability of building information modeling (BIM) to positively impact projects in the AEC through greater collaboration and integration is widely acknowledged. This paper aims to examine the development of BIM and how it can contribute to the cold-formed steel (CFS) building industry. This is achieved through the adoption of a qualitative methodology encompassing a literature review, exploratory interviews with industry experts, culminating in the development of e-learning material for the sector. In doing so, the research team have collaborated with one of the United Kingdom’s largest cold-formed steel designer/fabricators. By demonstrating the capabilities of BIM software and providing technical and informative videos in its creation, this project has found two key outcomes. Firstly, to provide invaluable assistance in the transition from traditional processes to a fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. Secondly, to demonstrate BIM’s potential not only within CFS companies, but also within the AEC sector as a whole. As the flexibility, adaptability and interoperability of BIM software is alluded to, the results indicate that the introduction and development of BIM and the underlying ethos suggests that it is a key tool in the development of the industry as a whole.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Congenital anomalies (CA) are the paradigm example of rare diseases liable to primary prevention actions due to the multifactorial etiology of many of them, involving a number of environmental factors together with genetic predispositions. Yet despite the preventive potential, lack of attention to an integrated preventive strategy has led to the prevalence of CA remaining relatively stable in recent decades. The 2 European projects, EUROCAT and EUROPLAN, have joined efforts to provide the first science-based and comprehensive set of recommendations for the primary prevention of CA in the European Union. The resulting EUROCAT-EUROPLAN 'Recommendations on Policies to Be Considered for the Primary Prevention of Congenital Anomalies in National Plans and Strategies on Rare Diseases' were issued in 2012 and endorsed by EUCERD (European Union Committee of Experts on Rare Diseases) in 2013. The recommendations exploit interdisciplinary expertise encompassing drugs, diet, lifestyles, maternal health status, and the environment. The recommendations include evidence-based actions aimed at reducing risk factors and at increasing protective factors and behaviors at both individual and population level. Moreover, consideration is given to topics specifically related to CA (e.g. folate status, teratogens) as well as of broad public health impact (e.g. obesity, smoking) which call for specific attention to their relevance in the pre- and periconceptional period. The recommendations, reported entirely in this paper, are a comprehensive tool to implement primary prevention into national policies on rare diseases in Europe.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The management of public sector risk is increasingly seen as a priority area of UK government policy. This has been highlighted recently by the Prime Minister Gordon Brown who stated that “the issue of public risk is one of the most challenging areas of policy-making for any government” (Strategic Risk, 2008). In response to these challenges, the UK Prime Minister has appointed a new body - the Risk and Regulation Advisory Council (RRAC) which is tasked with improving the way risk to the public is understood and managed. One area of particular concern with regard to the governance of public sector risks involves projects procured via the Private Finance Initiative (PFI). These projects involve long-term contracts, complex multi-party interactions and thus create various risks to public sector clients. Today, most PFI actors acknowledge the potentially adverse effects of these risks and make an effort to prevent or mitigate undesirable results. As a consequence, issues of risk allocation, risk transfer and risk management have become central to the PFI procurement process. This paper provides an overview of the risk categories and risk types which are relevant to the public sector in PFI projects. It analyses risk as a feature of uncertain future project-related events and examines potential pitfalls which can be associated with PFI risk management on the basis of a case study of a high-profile PFI hospital in Scotland. The paper concludes that, despite the trend towards diminished risk profiles during the operational phase, the public sector continues to be exposed to significant risks when engaging in PFI-based procurement.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The UK government introduced the Private Finance Initiative (PFI) and, latterly, the Local Improvement Finance Trust (LIFT) in an attempt to improve public service provision. As a variant of PFI, LIFT seeks to create a framework for the effective provision of primary care facilities. Like conventional PFI procurement, LIFT projects involve long-term contracts, complex multi-party interactions and thus create various risks to public sector clients. This paper investigates the advantages and disadvantages of LIFT with a focus on how this approach facilitates or impedes risk management from the public sector client perspective. Our paper concludes that LIFT has a potential for creating additional problems, including the further reduction of public sector control, conflicts of interest, the inappropriate use of enabling funds, and higher than market rental costs affecting the uptake of space in the buildings by local health care providers. However, there is also evidence that LIFT has facilitated new investment and that Primary Care Trusts (PCTs) have themselves started addressing some of the weaknesses of this procurement format through the bundling of projects and other forms of regional co-operation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Without human beings, and human activities, hazards can strike but disasters cannot occur, they are not just natural phenomena but a social event (Van Der Zon, 2005). The rapid demand for reconstruction after disastrous events can result in the impacts of projects not being carefully considered from the outset and the opportunity to improve long-term physical and social community structures being neglected. The events that struck Banda Aceh in 2004 have been described as
a story of ‘two tsunamis’, the first being the natural hazard that struck and the second being the destruction of social structures that occurred as a result of unplanned, unregulated and uncoordinated response (Syukrizal et al, 2009). Measures must be in place to ensure that, while aiming to meet reconstruction
needs as rapidly as possible, the risk of re-occurring disaster impacts are reduced through both the physical structures and the capacity of the community who inhabit them. The paper explores issues facing reconstruction in a post-disaster scenario, drawing on the connections between physical and social reconstruction in order to address long term recovery solutions. It draws on a study of relevant literature and a six week pilot study spent in Haiti exploring the progress of recovery in the Haitian capital and the limitations still restricting reconstruction efforts. The study highlights the need for recovery management strategies that recognise the link between social and physical reconstruction and the significance of community based initiatives that see local residents driving recovery in terms of debris handling and rebuilding. It demonstrates how a community driven approach to physical reconstruction could also address the social impacts of events that, in the case of places such as Haiti, are still dramatically restricting recovery efforts.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Large construction projects create numerous hazards, making it one of the most dangerous industries in which to work. This element of risk increases in urban areas and can have a negative impact on the external stakeholders associated with the project, along with their surrounding environments. The aim of this paper is to identify and document, in an urban context, the numerous issues encountered by on-site project managers from external stakeholders and how they affect a construction project. In addressing this aim, the core objective is to identify what issues are involved in the management of these stakeholders. In order to meet this requirement, a qualitative methodology encompassing an informative literature review followed by five individual case study interviews. The data gathered is assessed qualitatively using mind mapping software. A number of issues are identified which have an impact on the external stakeholders involved, and also how they affected proceedings on site. Collectively the most commonly occurring issues are environmental, legal, health and safety and communication issues. These ranged from road closures and traffic disruption to noise, dust and vibrations from site works. It is anticipated that the results of this study will assist and aid project managers in identifying issues considering external stakeholders, particularly on urban construction projects. A wide range of issues can develop depending on the complexity and nature of each project, but this research will illustrate and reinforce to project managers, that identifying issues early, effective communication and appropriate liaising can be used to manage the issues considering external stakeholders.