60 resultados para Questionnaire Survey


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Usage of anticoagulant rodenticides (ARs) is an integral component of modern agriculture and is essential for the control of commensal rodent populations. However, the extensive deployment of ARs has led to widespread exposure of a range of non-target predatory birds and mammals to some compounds, in particular the second-generation anticoagulant rodenticides (SCARS). As a result, there has been considerable effort placed into devising voluntary best practice guidelines that increase the efficacy of rodent control and reduce the risk of non-target exposure. Currently, there is limited published information on actual practice amongst users or implementation of best practice. We assessed the behaviour of a typical group of users using an on-farm questionnaire survey. Most baited for rodents every year using SGARs. Most respondents were apparently aware of the risks of non-target exposure and adhered to some of the best practice recommendations but total compliance was rare. Our questionnaire revealed that users of first generation anticoagulant rodenticides rarely protected or checked bait stations, and so took little effort to prevent primary exposure of non-targets. Users almost never searched for and removed poisoned carcasses and many baited for prolonged periods or permanently. These factors are all likely to enhance the likelihood of primary and secondary exposure of non-target species. (C) 2010 Published by Elsevier Ltd.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.

Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.

Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.

Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.

Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

There has been an increasing highlight of supply chain collaboration in UK construction. However, few studies have provided evidence for the current status. Based on the analysis of over 100 questionnaire responses in this research, it is found that the UK construction industry as a whole is experiencing an important change and moving towards supply chain collaboration. On the other hand, an unbalance is found for the change movement. In addition to the questionnaire survey, a series of expert interviews help to explore the specific characteristics of supply chain collaboration in construction and provide practical implications for collaboration strategy implementation.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to investigate the relationship between the facets of cultural intelligence (CQ) (cognitive, meta-cognitive, motivational and behavioural) and the dimensions of cross-cultural adjustment (interaction, general and work adjustment).

Design/methodology/approach: Interviews and questionnaire survey were carried out with British expatriates from the architectural, engineering and construction sector. A total of 191 respondents, with experience from 29 different countries, actively participated in this research. Structural equation model was subsequently developed to investigate the relationship between elements of CQ and cross-cultural adjustment.

Findings: Results of structural equation modelling revealed that collectively all the four aspects of CQ have significant influence on general, interaction and work adjustment, particularly motivational and cognitive CQ. Cognitive CQ which empowers the expatriates with in-depth knowledge about different cultures was a significant predictor of interaction and work adjustment, whereas, motivational CQ is a significant predictor for general and work adjustment. However, no support was gathered for meta-cognitive and behavioural aspects of CQ.

Practical implications: Globally, construction companies and projects are entering an era of increased internationalisation which has prompted the migration/promotion of British construction professionals to different parts of the world for their specialised capabilities and skills. Thus, it is of utmost importance that these professionals adjust to their new world of varied culture and still be productive in their work.

Originality/value: An understanding of these essential factors can actually help British construction organisations to select and mentor individuals and to provide necessary training for successful international assignments.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A questionnaire to obtain information on nematode control practices and sheep management was sent to over 1000 farmers in Northern Ireland. Replies were received from 305 flock owners, and data from 252 of them were analysed. Farms were divided into lowland and upland areas. Sizes of pasture and stocking rates on lowland and upland farms were 59.5 hectares, 6.99 sheep/hectare and 62.9 hectares and 10.01 sheep/hectare, respectively. Mean drenching rates for lambs and adults were 2.33 and 2.44, respectively, in lowland flocks and 2.73 and 2.71, respectively, in upland flocks. Between 2008 and 2011, the most frequently identified compounds in use were benzimidazoles and moxidectin in lowland flocks, and benzimidazoles and avermectins in upland flocks. Over the same period the most frequently identified commercial formulations were Tramazole (R), Panacur (R) and Allverm (R) (white drench), Levacide (R) (yellow drench), Oramec (R) (clear drench; avermectin), Cydectin (R) (clear drench; moxidectin) and Monepantel (R) (orange drench).

Most respondents (56.35%) treated their lambs at weaning and the most common time to treat ewes was identified to be pre-mating (67.86% of respondents).

The results of the questionnaire survey revealed that lowland annual drench frequency was 233 and 2.44 in lambs and ewes, respectively, although drench frequencies were higher in upland flocks: 2.73 and 2.71 for lambs and ewes, respectively.

Annual drench rotation was practiced by 43.96% of flock owners, but whether this was true rotation or pseudo-rotation (i.e., substitution of one anthelmintic product by another product belonging to the same chemical group of anthelmintics) could not be explicitly determined. (C) 2012 Elsevier B.V. All rights reserved.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Background: The World Health Organisation recognises palliative care as a global public health issue and this is reflected at strategic level. Despite this, palliative care may not be universally welcomed. Surveys over the last decade have suggested that the general public have a lack of knowledge and negative perceptions towards palliative care. A detailed and comprehensive understanding of public views is needed in order to target education and policy campaigns and to manage future needs, expectations and resourcing of end of life care. The aim of this study was to establish the current levels of awareness and attitudes towards palliative care among the general public in Northern Ireland.

Methods: A community-based cross-sectional survey with a population of 3,557 individuals aged over 17 years was performed. Information was collected using a structured questionnaire consisting of 17 items. Open questions were subject to content analysis; closed questions were subject to descriptive statistics with inferential testing as appropriate.

Results: A total of 600 responses were obtained (response rate 17%). Responses indicated limited knowledge about palliative care. Female gender and previous experience influenced awareness in a positive direction. Respondents who worked in healthcare themselves or who had a close relative or friend who had used a palliative care service were more aware of palliative care and the availability of different palliative care services. Findings reveal the preferred place of care was the family home. The main barriers to raising awareness were fear, lack of interaction with health services and perception of lack of resources. A number of strategies to enhance awareness, access and community involvement in palliative care were suggested.

Conclusions: Public awareness of the concept of palliative care and of service availability remains insufficient for widespread effective and appropriate palliative care to be accepted as the norm. In particular, those without
previous family-related experiences lack awareness. This has implications for palliative care service provision and policy. An increased awareness of palliative care is needed, in order to improve knowledge of and access to services when required, empower individuals, involve communities and ultimately to realise the objectives contained within international strategies for palliative and end-of-life care.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Construction Design and Management (CDM) Regulations (2007) is one of the most important set of health and safety regulations in the construction industry today. The aim of this research is to examine critical success factors for CDM compliance in small to medium size contractors in the UK construction industry. The objectives of the research include the identification of critical barriers in doing so along with the identification of success factors where CDM is incorporated. A mixed method approach is adopted in the identification and categorisation of the various factors encompassing a literature review, interviews and questionnaire survey. The key finding which emerge is the lack of knowledge and understanding with regards the CDM regulations with the recommendation to encourage small and medium contractor compliance through illustrating the benefits attainable. The practicality of the research is evident based on the significant uptake in the CDM by larger contractors, yet the research indicates that further insight and guidance is required to educate and inform those working within small to medium sized contractors in the UK. Where such acknowledgement and compliance is adopted, it is envisaged that this sector will benefit from reduced incidents and accidents, increased productivity while ultimately leading to a safer and more productive industry as a whole.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The purpose of this paper is to identify best practice construction dispute resolution in small-to-medium enterprises (SMEs) within Ireland during the recent economic recession. A sequential mixed methodology encompassing a detailed literature review, case studies, and questionnaire survey is adopted, with results analyzed using both exploratory (data reduction) and confirmatory (structural equation modelling) factor analysis. The results show that four core aspects should be adopted by SMEs to achieve best practice construction dispute resolution in recession: third-party intervention, adoption of a streamlined process, proactive party characteristics, and the use of legal professionals. Numerous studies of this subject have been conducted; however, no research has been done to date documenting best practice in construction dispute resolution within SMEs, particularly in light of the economic recession in Ireland. It is clear that dispute resolution in Ireland is currently undergoing fundamental changes, and time is necessary to see if the new Construction Contracts Act 2013 will help this practice. Therefore, it is a fundamental requirement for project management and legal professionals to acknowledge the changing environment attributable to the economic downturn and the resultant SME best practices in dispute resolution. This paper fulfills a gap in knowledge with the emergence of the economic recession and the evolution of best practice in dispute resolution within SMEs in the Irish construction sector.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Since the first launch of the new engineering contract (NEC) in 1993, early warning of problems has been widely recognized as an important approach of proactive management during a construction or engineering project. Is early warning really effective for the improvement of problem solving and project performance? This is a research question that still lacks a good answer. For this reason, an empirical investigation was made in the United Kingdom (U.K.) to answer the question. This study adopts a combination of literature review, expert interview, and questionnaire survey. Nearly 100 questionnaire responses were collected from the U.K. construction industry, based on which the use of early warning under different forms of contract is compared in this paper. Problem solving and project performance are further compared between the projects using early warning and the projects not using early warning. The comparison provides clear evidence for the significant effect of early warning on problem solving and project performance in terms of time, cost, and quality. Subsequently, an input-process-output model is developed in this paper to explore the relationship among early warning, problem solving, and project
performance. All these help construction researchers and practitioners to better understand the role of early warning in ensuring project success.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The purpose of this research is to identify and assess the opportunities and challenges of implementing a Site Waste Management Plan (SWMP) on projects irrespective of size. In the UK, construction and demolition waste accounts for a third of all UK waste. There are a number of factors that influence the implementation of SWMPs. In order to identify and analyse these factors, 4 unstructured interviews were carried out and a sample of 56 participants completed a questionnaire survey. The scope of the study was limited to UK
construction industry professionals. The analysis revealed that more needs to be done if the industry is to meet government targets of reduction in construction related waste going to landfill. In addition, although SWMP may not yet be legally required on all construction projects, clients and contractors need to realise
the benefits to cut costs and implement best practice by adopting a SWMP. The benefits of implementing a SWMP will not only help to achieve this but also gain significant cost savings on projects and is also extremely beneficial to the environment. This study presents evidence that contractors need to do more to reduce waste and draws a clear link between waste reduction and the implementation of SWMPs. The findings are useful in the ongoing efforts to encourage the industry to find smarter, more efficient and less
damaging ways to operate

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Aim: The aim of this paper is to identify best practice relating to the effective management of materials in an urban, confined construction site, using structural equation modelling.

Methodology: A literature review, case study analysis and questionnaire survey are employed, with the results scrutinised using confirmatory factor analysis in the form of structural equation modelling.

Results: The following are the leading strategies in the management of materials in a confined urban site environment; (1) Consult and review the project programme, (2) Effective communication and delivery, (3) Implement site safety management plans, and (4) Proactive spatial monitoring and control.

Implication for Practice: With the relentless expansion of urban centres and the increasing high cost of materials, any potential savings made on-site would translate into significant monetary concessions on completion of a development.

Originality/Value: As on-site project management professionals successfully identify and implement the various strategies in the management of plant and materials on a confined urban site, successful resource management in this restrictive environment is attainable.

Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) together with a questionnaire survey from the industry, investigating the managerial strategies in the management of plant and material in confined urban site environments

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose - To identify the critical factors causing construction disputes in Small to Medium Enterprises (SMEs) in Ireland during the recent recession period of 2007 to 2013.
Design/Methodology/Approach - A mixed method approach incorporating a literature review, case studies and questionnaire survey, with results analysed using exploratory (data reduction) factor analysis.
Findings - The results indicate seven core critical factors which result in construction disputes in SMEs in Ireland during a recession: Payment and extras; Physical work conditions; Poor financial/legal practise; Changes to the agreed scope of works; Time overrun; Defects; and Requests for increase in speed of project and long-term defects.
Research Limitations/Implications - With Ireland emerging from the current economic recession and the prevalence of SMEs to the construction sector, it is essential to document the core critical factors of construction disputes which emerge within this particular segment of the built environment.
Practical Implications - To address the adversarial nature of the construction sector and the prevalence of SMEs, it is essential to identify and document the critical factors of construction disputes within this remit. It is envisaged that the results of this research will be acknowledged, and the recommendations adopted, by construction SMEs, particularly within Ireland, as they emerge from the economic recession.
Originality/Value - This paper fulfils a gap in knowledge with the emergence of the economic recession and the identification of critical factors of construction dispute within SMEs in the Irish construction industry.