Resumo:
In the aftermath of recent natural disasters, NGOs have become increasingly involved in the permanent reconstruction of affected communities. These organizations, often operating well outside their expertise, encounter significant barriers as they implement reconstruction programmes. This paper presents the theoretical bedrock of a current research project, the overall goal of which is to design a competency-based framework model that can be used by NGOs in post-disaster reconstruction projects. Drawing on established theories of management, a unique perspective has been developed from which a competency-based reconstruction theory emerges. This theoretical framework brings together three distinct fields; Disaster Management, Strategic Management and Project Management, each vital to the success of the model. This theoretical study will incorporate a critical review of literature within each field. It is imperative that NGOs involved in post-disaster reconstruction familiarize themselves with concepts and strategies. It is hoped that the competence-based frame-work model that is produced on the basis of this theory will help define the standard of best practice to which future NGO projects might align themselves.
Resumo:
The change of supply chain relationships from the traditional adversarial to the collaborative has been increasing in the UK construction industry. To reflect this change, some attempts have been made to establish models for measuring and improving supply chain relationships in construction. However, there are obvious deficiencies in these existing models. This highlights the need for a systematic model for the assessment of construction supply chain relationships. Based on a review of the literature and an expert group discussion, an assessment framework is developed in this paper, which consists of assessment criteria, relationship levels, detailed descriptions, assessment classes and assessment procedures. The proposed framework is evaluated through expert interviews and case studies. This framework provides a roadmap for the improvement of supply chain relationships. It can help construction organisations to position their current relationship and identify key areas for relationship improvement in the future.
Resumo:
Natural hazards trigger disasters, the scale of which is largely determined by vulnerability. Developing countries suffer the most from disasters due to various conditions of vulnerability which exist and there is an opportunity after disasters to take mitigative action. NGOs implementing post-disaster rehabilitation projects must be able to address the issues causing communities to live at risk of disaster and therefore must build dynamic capacity, capabilities and competencies, enabling them to operate in unstable environments. This research is built upon a theoretical framework of dynamic competency established by combining elements of disaster management, strategic management and project management theory. A number of NGOs which have implemented reconstruction and rehabilitation projects both in Sri Lanka following the Asian Tsunami and Bangladesh following Cyclone Sidr are being investigated in great depth using a causal mapping procedure. ‘Event’ specific maps have been developed for each organization in each disaster. This data will be analysed with a view to discovering the strategies which lead to vulnerability reduction in post-disaster communities and the competencies that NGOs must possess in order to achieve favourable outcomes. It is hypothesized that by building organizational capacity, capabilities and competencies to be dynamic in nature, while focusing on a more emergent strategic approach, with emphasis on adaptive capability and innovation, NGOs will be better equipped to contribute to sustainable community development through reconstruction. We believe that through this study it will be possible to glean a new understanding of social processes that emerge within community rehabilitation projects.
Resumo:
The construction industry is inherently hazardous, with a significant number of accidents and incidents occurring, particularly on confined construction sites. This research identifies, clarifies and tabulates the various managerial health and safety issues encountered on confined construction sites, based on a qualitative approach, to aid in the management of the complex health and safety concerns. The methodology is based on qualitative research incorporating case studies, interviews, causal loop diagrams and mind mapping. The key findings in the managerial issues in the management of health and safety on confined construction sites can be summarised as follows; (1) A lack of space, (2) Increased management of site personnel, (3) Overcrowding of the work place. The implication for the industry is that due to the sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters. The value of such research is to aid management professionals successfully identify the various managerial issues highlighted, resulting in the successful management of health and safety on a confined construction site.
Resumo:
Increased globalisation within the British AEC (Architectural, Engineering and Construction) sector has increased the need for companies to transfer staff to manage their overseas operations. To be able to perform abroad, expatriates must harmonise themselves to the conditions prevailing in the host country. These include getting accustomed to living, working and interacting with the host country nationals. The process is commonly referred to as 'cross-cultural adjustment'. Various factors influence the process of adjustment. In order to identify these issues, a qualitative study was undertaken, which mainly comprised of comprehensive literature review, individual interviews and focus group discussion with British expatriates working on international AEC assignments in Middle Eastern countries. Through interpretative approach, the current study aims to understand the concept of cross-cultural adjustment of British Expatriates based in Middle East and their influencing factors.
The findings suggest that success of expatriation does not entirely rest on an expatriate's ability but also on organisational support and assistance that expatriates receive prior to and during the assignment. Organisational factors such as selection mechanisms, job design, training, logistical and social support, mentoring, etc., influence various facets of expatriate adjustment. Striking cultural contrasts between British and Arab culture both in work and non work situations also dictate the level of support required by the expatriate, suggesting that relocation to less developed, remote or politically unstable regions, demands additional support and consideration by the parent company. This study is relevant to the AEC companies employing British expatriates, who need to be cognisant of the issues highlighted above to make rational and informed decisions when handling international assignments in the Middle East.
Resumo:
Inner city, confined site construction is quickly becoming the norm within the construction sector. The aim of this paper is to identify and document the effect, if any, that a confined construction site environment has on the productivity of on-site personnel. In order to compile the relevant information and attain appropriate results on the matter in question, a qualitative analytical approach is adopted. This process incorporates multiple cases studies from Ireland, Northern Ireland and USA. From the resulting case studies, a minimum of three individual interviews and focus group seminars are conducted to aid in the collection of the data while also assisting in the confirmation of the factors identified from a critique of the relevant literature. From the resulting case studies and discussions, a list of the key issues pertaining to the on-site productivity of personnel emerged and is documented as follows; 1) Overcrowding of personnel at workstations, 2) Lack of space for the effective movement of personnel on-site, 3) Numerous trades working within the one space on-site. Through identifying the issues highlighted and proactively mitigating or eliminating the factors detailed, on-site management professionals can strive to ensure maximum productivity from the industry’s most important resource – people.
Resumo:
The purpose of this paper is to identify best practice construction dispute resolution in small-to-medium enterprises (SMEs) within Ireland during the recent economic recession. A sequential mixed methodology encompassing a detailed literature review, case studies, and questionnaire survey is adopted, with results analyzed using both exploratory (data reduction) and confirmatory (structural equation modelling) factor analysis. The results show that four core aspects should be adopted by SMEs to achieve best practice construction dispute resolution in recession: third-party intervention, adoption of a streamlined process, proactive party characteristics, and the use of legal professionals. Numerous studies of this subject have been conducted; however, no research has been done to date documenting best practice in construction dispute resolution within SMEs, particularly in light of the economic recession in Ireland. It is clear that dispute resolution in Ireland is currently undergoing fundamental changes, and time is necessary to see if the new Construction Contracts Act 2013 will help this practice. Therefore, it is a fundamental requirement for project management and legal professionals to acknowledge the changing environment attributable to the economic downturn and the resultant SME best practices in dispute resolution. This paper fulfills a gap in knowledge with the emergence of the economic recession and the evolution of best practice in dispute resolution within SMEs in the Irish construction sector.
Resumo:
Aim: The aim of this paper is to identify best practice relating to the effective management of materials in an urban, confined construction site, using structural equation modelling.
Methodology: A literature review, case study analysis and questionnaire survey are employed, with the results scrutinised using confirmatory factor analysis in the form of structural equation modelling.
Results: The following are the leading strategies in the management of materials in a confined urban site environment; (1) Consult and review the project programme, (2) Effective communication and delivery, (3) Implement site safety management plans, and (4) Proactive spatial monitoring and control.
Implication for Practice: With the relentless expansion of urban centres and the increasing high cost of materials, any potential savings made on-site would translate into significant monetary concessions on completion of a development.
Originality/Value: As on-site project management professionals successfully identify and implement the various strategies in the management of plant and materials on a confined urban site, successful resource management in this restrictive environment is attainable.
Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) together with a questionnaire survey from the industry, investigating the managerial strategies in the management of plant and material in confined urban site environments
Resumo:
In comparison to the rest of the United Kingdom (UK) the Northern Irish Construction Industry was disproportionately affected by the recent economic recession. During this period, use of the New Engineering Contract (NEC) has proliferated in the public sector, however no study has been undertaken to examine the impact of the recession on this contract in Northern Ireland. The aim of this paper is to explore NEC contract implementation in Northern Ireland and the impact of the recession on its operation. A qualitative methodology is adopted using a literature review and semi structured interviews with six construction professionals. A qualitative analysis identifies themes and issues arising exploring connections and links between them using thematic coding. The initial findings are that the introduction of the NEC contract in Northern Ireland makes demands of contractors and consultants in terms of additional resources and training. Some consultants show a clear lack of understanding of the contract and its provisions. Whilst there is general agreement that the contract does help to stimulate good project management, the interviewees find the contract time consuming and complicated to administer, describing it as “unforgiving for the architect and unforgiving to the contractor.” Due to the impact of the recession, both contractors and consultants are still reporting a drop in income from pre-recession levels. Project resourcing levels have dropped significantly since the onset of the recession. Adversarial and opportunistic behaviour has increased. Many consultants and contractors are struggling to adequately administer the NEC contract at current income levels. The introduction of the NEC contract and the economic recession have exerted opposing forces on the implementation of the contract, hindering its execution. As the pressures exerted by the economic recession abate and a greater understanding of the contract develops, these opposing forces will ease leading to a more consistent implementation of the contract.