39 resultados para Project Approach
Resumo:
Exoplanet transit and Doppler surveys discover many binary stars during their operation that can be used to conduct a variety of ancillary science. Specifically, eclipsing binary stars can be used to study the stellar mass-radius relationship and to test predictions of theoretical stellar evolution models. By cross-referencing 24 binary stars found in the MARVELS Pilot Project with SuperWASP photometry, we find two new eclipsing binaries, TYC 0272-00458-1 and TYC 1422-01328-1, which we use as case studies to develop a general approach to eclipsing binaries in survey data. TYC 0272-00458-1 is a single-lined spectroscopic binary for which we calculate a mass of the secondary and radii for both components using reasonable constraints on the primary mass through several different techniques. For a primary mass of M 1 = 0.92 ± 0.1 M sun, we find M 2 = 0.610 ± 0.036 M sun, R 1 = 0.932 ± 0.076 R sun, and R 2 = 0.559 ± 0.102 R sun, and find that both stars have masses and radii consistent with model predictions. TYC 1422-01328-1 is a triple-component system for which we can directly measure the masses and radii of the eclipsing pair. We find that the eclipsing pair consists of an evolved primary star (M 1 = 1.163 ± 0.034 M sun, R 1 = 2.063 ± 0.058 R sun) and a G-type dwarf secondary (M 2 = 0.905 ± 0.067 M sun, R 2 = 0.887 ± 0.037 R sun). We provide the framework necessary to apply this analysis to much larger data sets.
Resumo:
This paper presents the findings from an innovative project funded by the
International Association of Schools of Social Work (IASSW) and undertaken by
an international team of academics investigating the development of a global
curriculum for social work in the context of political conflict. Coupled alongside
the emerging research and literature on the subject, our small-scale survey
findings indicate support for the need for social work educators to address
political conflict more systematically within social work curricula at both
undergraduate and post-qualifying levels of social work education. The paper
illuminates the opportunities for creative pedagogy whilst also examining the
threats and challenges permeating the realisation of such initiatives. In this way,
the implementation of a proposed curriculum for political conflict is given meaning within the context of IASSW’s Global Standards for social work education. Given the exploratory nature of this project, the authors do conclude that further research is warranted in regard to potential curriculum development and suggest using a comparative case study approach with more in-depth qualitative methods as a way to address this.
Resumo:
The European Commission has developed a set of common principles for marine spatial planning in the European Union. A critical examination of these principles in practice is undertaken through an evaluation of the Clyde Marine Spatial Planning Pilot Project. The principles are found to be lacking in specificity and somewhat inconsistent with the ecosystem based approach, which they advocate. Lessons for new marine spatial planning initiatives, relating particularly to stakeholder participation, governance, data requirements, objective setting, and skills and knowledge needs, are derived from the Clyde Pilot. © 2011.
Resumo:
Background: Increasing emphasis is being placed on the economics of health care service delivery - including home-based palliative care. Aim: This paper analyzes resource utilization and costs of a shared-care demonstration project in rural Ontario (Canada) from the public health care system's perspective. Design: To provide enhanced end-of-life care, the shared-care approach ensured exchange of expertise and knowledge and coordination of services in line with the understood goals of care. Resource utilization and costs were tracked over the 15 month study period from January 2005 to March 2006. Results: Of the 95 study participants (average age 71 years), 83 had a cancer diagnosis (87%); the non-cancer diagnoses (12 patients, 13%) included mainly advanced heart diseases and COPD. Community Care Access Centre and Enhanced Palliative Care Team-based homemaking and specialized nursing services were the most frequented offerings, followed by equipment/transportation services and palliative care consults for pain and symptom management. Total costs for all patient-related services (in 2007 CAN) were 1,625,658.07 - or 17,112.19 per patient/117.95 per patient day. Conclusion: While higher than expenditures previously reported for a cancer-only population in an urban Ontario setting, the costs were still within the parameters of the US Medicare Hospice Benefits, on a par with the per diem funding assigned for long-term care homes and lower than both average alternate level of care and hospital costs within the Province of Ontario. The study results may assist service planners in the appropriate allocation of resources and service packaging to meet the complex needs of palliative care populations. © 2012 The Author(s).
Resumo:
The main aims of the present study, conducted in the framework of the MONIQUA-Egadi Scientific Project, were twofold: first, to make the first step in the development and validation of an ecotoxicological approach for the assessment of marine pollution in coastal environments on the basis of a set of biomarker responses in new sentinel species; and second, to obtain preliminary information on environmental quality in an Italian marine protected area, the Egadi Islands (Sicily). Several cytochrome P450-dependent mixed-function oxidase activities were measured in the following sentinel species: rainbow wrasse Coris julis, gastropod limpet Patella caerulea, and sea urchin Paracentrotus lividus. The results suggest that specimens from the Favignana Harbor may be exposed to P450 inducers, whereas most of the other sites seem to share similar environmental quality. The proposed approach has potential for assessment of environmental quality in marine protected areas.
Resumo:
This paper describes the ParaPhrase project, a new 3-year targeted research project funded under EU Framework 7 Objective 3.4 (Computer Systems), starting in October 2011. ParaPhrase aims to follow a new approach to introducing parallelism using advanced refactoring techniques coupled with high-level parallel design patterns. The refactoring approach will use these design patterns to restructure programs defined as networks of software components into other forms that are more suited to parallel execution. The programmer will be aided by high-level cost information that will be integrated into the refactoring tools. The implementation of these patterns will then use a well-understood algorithmic skeleton approach to achieve good parallelism. A key ParaPhrase design goal is that parallel components are intended to match heterogeneous architectures, defined in terms of CPU/GPU combinations, for example. In order to achieve this, the ParaPhrase approach will map components at link time to the available hardware, and will then re-map them during program execution, taking account of multiple applications, changes in hardware resource availability, the desire to reduce communication costs etc. In this way, we aim to develop a new approach to programming that will be able to produce software that can adapt to dynamic changes in the system environment. Moreover, by using a strong component basis for parallelism, we can achieve potentially significant gains in terms of reducing sharing at a high level of abstraction, and so in reducing or even eliminating the costs that are usually associated with cache management, locking, and synchronisation. © 2013 Springer-Verlag Berlin Heidelberg.
Resumo:
Anti-islanding protection is becoming increasingly important due to the rapid installation of distributed generation from renewable resources like wind, tidal and wave, solar PV, bio-fuels, as well as from other resources like diesel. Unintentional islanding presents a potential risk for damaging utility plants and equipment connected from the demand side, as well as to public and personnel in utility plants. This paper investigates automatic islanding detection. This is achieved by deploying a statistical process control approach for fault detection with the real-time data acquired through a wide area measurement system, which is based on Phasor Measurement Unit (PMU) technology. In particular, the principal component analysis (PCA) is used to project the data into principal component subspace and residual space, and two statistics are used to detect the occurrence of fault. Then a fault reconstruction method is used to identify the fault and its development over time. The proposed scheme has been used in a real system and the results have confirmed that the proposed method can correctly identify the fault and islanding site.
Resumo:
Waste management and sustainability are two core underlying philosophies that the construction sector must acknowledge and implement; however, this can prove difficult and time consuming. To this end, the aim of this paper is to examine waste management strategies and the possible benefits, advantages and disadvantages to their introduction and use, while also to examine any inter-relationship with sustainability, particularly at the design stage. The purpose of this paper is to gather, examine and review published works and investigate factors which influence economic decisions at the design phase of a construction project. In addressing this aim, a three tiered sequential research approach is adopted; in-depth literature review, interviews/focus groups and qualitative analysis. The resulting data is analyzed, discussed, with potential conclusions identified; paying particular attention to implications for practice within architectural firms. This research is of importance, particularly to the architectural sector, as it can add to the industry’s understanding of the design process, while also considering the application and integration of waste management into the design procedure. Results indicate that the researched topic had many advantages but also had inherent disadvantages. It was found that the potential advantages outweighed disadvantages, but uptake within industry was still slow and that better promotion and their benefits to; sustainability, the environment, society and the industry were required.
Resumo:
Since the first launch of the new engineering contract (NEC) in 1993, early warning of problems has been widely recognized as an important approach of proactive management during a construction or engineering project. Is early warning really effective for the improvement of problem solving and project performance? This is a research question that still lacks a good answer. For this reason, an empirical investigation was made in the United Kingdom (U.K.) to answer the question. This study adopts a combination of literature review, expert interview, and questionnaire survey. Nearly 100 questionnaire responses were collected from the U.K. construction industry, based on which the use of early warning under different forms of contract is compared in this paper. Problem solving and project performance are further compared between the projects using early warning and the projects not using early warning. The comparison provides clear evidence for the significant effect of early warning on problem solving and project performance in terms of time, cost, and quality. Subsequently, an input-process-output model is developed in this paper to explore the relationship among early warning, problem solving, and project
performance. All these help construction researchers and practitioners to better understand the role of early warning in ensuring project success.
Resumo:
The Irish and UK governments, along with other countries, have made a commitment to limit the concentrations of greenhouse gases in the atmosphere by reducing emissions from the burning of fossil fuels. This can be achieved (in part) through increasing the sequestration of CO2 from the atmosphere including monitoring the amount stored in vegetation and soils. A large proportion of soil carbon is held within peat due to the relatively high carbon density of peat and organic-rich soils. This is particularly important for a country such as Ireland, where some 16% of the land surface is covered by peat. For Northern Ireland, it has been estimated that the total amount of carbon stored in vegetation is 4.4Mt compared to 386Mt stored within peat and soils. As a result it has become increasingly important to measure and monitor changes in stores of carbon in soils. The conservation and restoration of peat covered areas, although ongoing for many years, has become increasingly important. This is summed up in current EU policy outlined by the European Commission (2012) which seeks to assess the relative contributions of the different inputs and outputs of organic carbon and organic matter to and from soil. Results are presented from the EU-funded Tellus Border Soil Carbon Project (2011 to 2013) which aimed to improve current estimates of carbon in soil and peat across Northern Ireland and the bordering counties of the Republic of Ireland.
Historical reports and previous surveys provide baseline data. To monitor change in peat depth and soil organic carbon, these historical data are integrated with more recently acquired airborne geophysical (radiometric) data and ground-based geochemical data generated by two surveys, the Tellus Project (2004-2007: covering Northern Ireland) and the EU-funded Tellus Border project (2011-2013) covering the six bordering counties of the Republic of Ireland, Donegal, Sligo, Leitrim, Cavan, Monaghan and Louth. The concept being applied is that saturated organic-rich soil and peat attenuate gamma-radiation from underlying soils and rocks. This research uses the degree of spatial correlation (coregionalization) between peat depth, soil organic carbon (SOC) and the attenuation of the radiometric signal to update a limited sampling regime of ground-based measurements with remotely acquired data. To comply with the compositional nature of the SOC data (perturbations of loss on ignition [LOI] data), a compositional data analysis approach is investigated. Contemporaneous ground-based measurements allow corroboration for the updated mapped outputs. This provides a methodology that can be used to improve estimates of soil carbon with minimal impact to sensitive habitats (like peat bogs), but with maximum output of data and knowledge.
Resumo:
The primary purpose of the BASE Project was to establish how to help individuals with Autism Spectrum Disorder out of poverty by promoting social inclusion. In order to achieve this, a range of methodologies were utilised that aimed to provide a baseline against which the effect of the Autism Act (NI) 2011 and the associated Autism Strategy (2013-2020) and Action Plans can be measured. The BASE Project is reported in 5 volumes. Volume 2 reports on the analysis of the autism module of the Northern Ireland Life and Times (NILT) Survey that assessed public awareness, attitudes, knowledge, and projected behaviours with regard to individuals with ASD (all primary data and technical reports are available at www.ark.ac.uk/nilt/).
The NILT (2012) survey first ever autism module (n=1204) offered a baseline against which the impact of new autism legislation, policies, and strategies can be measured. Key findings:
• 82% awareness: Most people in Northern Ireland are aware of autism (n=989).
• 50% of all participants knew someone with autism personally (n=606).
Of those who were aware of autism:
• 19% had a close family member with autism (n=186), and/or a friends/acquaintance (n=296), and/or a work colleague (n=79) with autism.
• Autism awareness was particularly low for those from ethnic minorities and those with no internet access.
• Awareness of autism specific legislation was low (20%).
• Good levels of knowledge about autism strengths and challenges, slight tendency to overestimate the occurrence of special talents.
• Prevalence of autism was underestimated (62% thought autism was much less prevalent than official figures or did not know).
• Fairly accurate perception about causes of autism, i.e., not caused by poor parenting (84%).
• Strong support for evidence-based behavioural interventions (77%), but confusion about interventions that are not evidence-based (64%).
• Strong positive attitudes towards children and adults in social, educational and employment settings.
• Autism not viewed as necessarily ‘lifelong’ (58%); support for independent living (78%), e.g., driving a car (83%).
• More business for employers who employ people with autism (12%).
• Strong support for families caring rather than residential care (64%).
• Confusion about service responsibility: education (26%) health (33%) or both (28%).
Given increasing prevalence rates of ASD it is important that the general population is aware of autism and able to respond responsibly to the associated strengths and challenges. The results of the NILT (2012) first ever autism module show that the general public was well aware of autism, had positive attitudes, and was relatively knowledgeable about the issues faced by individuals and families affected directly. However, there was a lack of clarity about responsibility for effective service delivery. The NILT results show that a shift in focus is necessary from ‘awareness raising campaigns’ to an approach that delivers clarity with regard to intervention and accountability.
Resumo:
This paper describes the result of a project to develop climate adaptation design strategies funded by the UK’s Technology Strategy Board. The aim of the project was to look at the threats and opportunities presented by industrialized and house-building techniques in the light of predicted future increases in flooding and overheating due to anthropogenic climate change. The paper shows that the thermal performance of houses built to the current UK Building Regulations is not adequate to cope with changing weather patterns, and in light of this, develops a detailed design for a new house: one that is industrially produced and climatically resilient, but affordable. This detailed concept IDEAhaus of a modular house is not only flood-proof to a water depth of 750 mm, but also is designed to utilize passive cooling, which dramatically reduces the amount of overheating, both now and in the future.
Resumo:
A gap in the medical undergraduate curriculum on safe moving and handling of patients was identified, and a project to enhance moving and handling education for undergraduates in various healthcare disciplines was undertaken. A team of nurses, doctors, physiotherapists and e-learning professionals developed a cross-discipline e-learning resource, piloted with medical and nursing students at Queen’s University Belfast. One outcome of the project was the development of a deeper recognition of the common curriculum across healthcare disciplines.
Resumo:
As part of a UK-China science bridge project - a UK government funded initiative linking leading universities and businesses in selective partnering countries in 2009 a collaborative research programme was initiated between Queen's University and the Research Institute of High Performance Concrete (part of the Central Research Institute of Building and Construction) in Beijing.
For further details email b.magee@ulster.ac.uk
Resumo:
Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.