41 resultados para Engineering, Industrial|Engineering, System Science|Operations Research
Resumo:
We consider the problem of train planning or scheduling for large, busy, complex train stations, which are common in Europe and elsewhere, though not in North America. We develop the constraints and objectives for this problem, but these are too computationally complex to solve by standard combinatorial search or integer programming methods. Also, the problem is somewhat political in nature, that is, it does not have a clear objective function because it involves multiple train operators with conflicting interests. We therefore develop scheduling heuristics analogous to those successfully adopted by train planners using ''manual'' methods. We tested the model and algorithms by applying to a typical large station that exhibits most of the complexities found in practice. The results compare well with those found by traditional methods, and take account of cost and preference trade-offs not handled by those methods. With successive refinements, the algorithm eventually took only a few seconds to run, the time depending on the version of the algorithm and the scheduling problem. The scheduling models and algorithms developed and tested here can be used on their own, or as key components for a more general system for train scheduling for a rail line or network.Train scheduling for a busy station includes ensuring that there are no conflicts between several hundred trains per day going in and out of the station on intersecting paths from multiple in-lines and out-lines to multiple platforms, while ensuring that each train is allowed at least its minimum required headways, dwell time, turnaround time and trip time. This has to be done while minimizing (costs of) deviations from desired times, platforms or lines, allowing for conflicts due to through-platforms, dead-end platforms, multiple sub-platforms, and possible constraints due to infrastructure, safety or business policy.
Resumo:
The divide-and-conquer approach of local model (LM) networks is a common engineering approach to the identification of a complex nonlinear dynamical system. The global representation is obtained from the weighted sum of locally valid, simpler sub-models defined over small regions of the operating space. Constructing such networks requires the determination of appropriate partitioning and the parameters of the LMs. This paper focuses on the structural aspect of LM networks. It compares the computational requirements and performances of the Johansen and Foss (J&F) and LOLIMOT tree-construction algorithms. Several useful and important modifications to each algorithm are proposed. The modelling performances are evaluated using real data from a pilot plant of a pH neutralization process. Results show that while J&F achieves a more accurate nonlinear representation of the pH process, LOLIMOT requires significantly less computational effort.
Resumo:
This paper describes the application of multivariate regression techniques to the Tennessee Eastman benchmark process for modelling and fault detection. Two methods are applied : linear partial least squares, and a nonlinear variant of this procedure using a radial basis function inner relation. The performance of the RBF networks is enhanced through the use of a recently developed training algorithm which uses quasi-Newton optimization to ensure an efficient and parsimonious network; details of this algorithm can be found in this paper. The PLS and PLS/RBF methods are then used to create on-line inferential models of delayed process measurements. As these measurements relate to the final product composition, these models suggest that on-line statistical quality control analysis should be possible for this plant. The generation of `soft sensors' for these measurements has the further effect of introducing a redundant element into the system, redundancy which can then be used to generate a fault detection and isolation scheme for these sensors. This is achieved by arranging the sensors and models in a manner comparable to the dedicated estimator scheme of Clarke et al. 1975, IEEE Trans. Pero. Elect. Sys., AES-14R, 465-473. The effectiveness of this scheme is demonstrated on a series of simulated sensor and process faults, with full detection and isolation shown to be possible for sensor malfunctions, and detection feasible in the case of process faults. Suggestions for enhancing the diagnostic capacity in the latter case are covered towards the end of the paper.
Resumo:
This study explores the special characteristics of the construction industry and develops a maturity model for measuring and improving the relationships between the key players of a construction supply chain. The model adopts the capability maturity methodology and defines four maturity levels of construction supply chain relationships. It is in a matrix format, consisting of 24 assessment criteria in eight categories at each maturity level. It also provides three different ways of using the model. The model is evaluated through a series of expert interviews. A case study is also presented to demonstrate the application of this model in practice.
Resumo:
Over the years, build-operate-transfer (BOT) has continuously attracted research interests. Many studies on BOT have been carried out. Variations of BOT such as build-own-operate-transfer and build-own-operate have also been reported in some relevant publications. However, few investigations thus far have been conducted for transfer-operate-transfer (TOT). Therefore, there is a knowledge gap in this particular field. TOT is a new model that is suitable for existing infrastructure and public utility projects formerly funded by the governments and currently operated by state-owned enterprises. It refers to the transfer of a running public project to a foreign business or domestic private entity. Based on four case studies carried out in the Chinese water supply industry, this paper examines why there is an increasing need for TOT projects and identifies the distinctive features of TOT practice in China. This is followed by an introduction of a framework of critical success factors (CSFs) for TOT projects. The most important factors include project profitability, asset quality, fair risk allocation, competitive tendering, internal coordination within government, employment of professional advisors, corporate governance, and government supervision. The identification of CSFs provides a useful guidance to project parties planning to participate in TOT practice.
Resumo:
Keeping a record of operator experience remains a challenge to operation management and a major source of inefficiency in information management. The objective is to develop a framework that enables an explicit presentation of experience based on information use. A purposive sampling method is used to select four small and medium-sized enterprises as case studies. The unit of analysis is the production process in the machine shop. Data collection is by structured interview, observation and documentation. A comparative case analysis is applied. The findings suggest experience is an accumulation of tacit information feedback, which can be made explicit in information use interoperatability matrix. The matrix is conditioned upon information use typology, which is strategic in waste reduction. The limitations include difficulty of participant anonymity where the organisation nominates a participant. Areas for further research include application of the concepts to knowledge management and shop floor resource management.
Resumo:
As the innovation process has become more open and networked, Government policy in the UK has sought to promote both research excellence in the university sector and the translation of this into economic benefit through university–business engagement. However, this policy approach has tended to be applied uniformly with little account for organisational differences within the sector. In this paper we consider if differences between universities in their research performance is reflected in their knowledge transfer activity. Specifically, as universities develop a commercialization agenda are the strategic priorities for knowledge transfer, the organisational supports in place to facilitate knowledge transfer and the scale and scope of knowledge transfer activity different for high research intensive (HRI) and low research intensive (LRI) universities? The findings demonstrate that universities’ approach to knowledge transfer is shaped by institutional and organisational resources, in particular their ethos and research quality, rather than the capability to undertake knowledge transfer through a Technology Transfer Office (TTO). Strategic priorities for knowledge transfer are reflected in activity, in terms of the dominance of specific knowledge transfer channels, the partners with which universities engage and the geography of business engagement.
Resumo:
After years of emphasis on leanness and responsiveness businesses are now experiencing their vulnerability to supply chain disturbances. Although more literature is appearing on this subject, there is a need for an integrated framework to support the analysis and design of robust food supply chains. In this chapter we present such a framework. We define the concept of robustness and classify supply chain disturbances, sources of food supply chain vulnerability, and adequate redesign principles and strategies to achieve robust supply chain performances. To test and illustrate its applicability, the research framework is applied to a meat supply chain.
Resumo:
The thermoforming industry has been relatively slow to embrace modern measurement technologies. As a result researchers have struggled to develop accurate thermoforming simulations as some of the key aspects of the process remain poorly understood. For the first time, this work reports the development of a prototype multivariable instrumentation system for use in thermoforming. The system contains sensors for plug force, plug displacement, air pressure and temperature, plug temperature, and sheet temperature. Initially, it was developed to fit the tooling on a laboratory thermoforming machine, but later its performance was validated by installing it on a similar industrial tool. Throughout its development, providing access for the various sensors and their cabling was the most challenging task. In testing, all of the sensors performed well and the data collected has given a powerful insight into the operation of the process. In particular, it has shown that both the air and plug temperatures stabilize at more than 80C during the continuous thermoforming of amorphous polyethylene terephthalate (aPET) sheet at 110C. The work also highlighted significant differences in the timing and magnitude of the cavity pressures reached in the two thermoforming machines. The prototype system has considerable potential for further development.