42 resultados para Durham Cathedral.
Resumo:
These results cover dating undertaken since the last published list of dated building from Ireland (Brown (2002)); one English church building is also included in the list. Thanks are due to the owners of the buildings and especially to everyone who assisted in taking of the samples: Phil Barrett, Sapphire Mussen, Charles Lyons, Jon Pilcher and Mike Baillie, Amanda Pedlow, Caimin O’Brien and Martin Timoney. Most of the descriptions of the buildings are taken from the National Inventory of Architectural Heritage http://www.buildingofi reland.ie/. The correlation values were generated by CROSS84 (Munro, 1984), which provides a signifi cance level for the date to be correct; *** (extremely signifi cant), ** (very signifi cant), * (signifi cant), nsm (not signifi cant). Estimated felling date ranges are based on the Belfast sapwood estimate of 32 ± 9 years. Date ranges have been calculated by adding and subtracting 9 years from the calculated estimated felling dates. Timbers from the following buildings could not be dated. Cork: St Finbarre’s Cathedral (W 675 715); Dublin: Christchurch Cathedral (O 152 341); Galway: Cloghan Castle (M 972 119); Kilkenny: Rothe House (S 506 563); Offaly: Boveen House (S 075 956); Waterford: Christchurch Cathedral (S 616 121). Generally only single oak samples were recovered from these structures. References: D.Brown, ‘Dendrochronological dating building from Ireland’, VA 33 (2002), 71–3; M. Munro, ‘An improved algorithm for crossdating tree-ring series’, Tree-Ring Bulletin 44 (1984), 17–27.
Resumo:
The Regional Cultural Centre in Letterkenny is a new 2000sqm arts center containing theatre, galleries, workshops and ancillary offices. The site is set back from the street, on high ground with good views. The form and envelope of the building was derived from geometrically connecting the site with the town’s two other main public buildings, the Cathedral (1901) and new Civic Offices (2002, also designed by MacGabhann Architects). This geometrical connection or vectors informed the geometry and shape of the building. This urban matrix of geometrically connecting three corner stones of society, namely the ecclesiastical headquarters, the administrative head quarters and the art centre helps to improve the town planning and urban design of the disparate and chaotic development that Letterkenny has become.
The large cantilever, which houses a 300sqm gallery, is aligned towards the Civic Offices, marks the entrance, and signifies a change of direction of the pedestrian route past the building, like a modern day obelisk.
The circulation routes and stairs internally provide views towards the civic offices and cathedral, thus reinforcing the connection between the three buildings and helps visitors make some sense of Letterkenny as an urban center. The main stairs and vertical circulation are contained behind the large glazed foyer, which is framed to be viewed externally like a proscenium stage, with visitors to the building passively acting their routes through the building.
Resumo:
A sociological examination of the concept of leadership and its application to understanding social interactions and power relations in local churches, based upon ethnographic investigation into London Methodist churches.
Resumo:
This piece argues that constitutions must be documents which meet the needs and demands of the nation's people and that, as a nation's relationship with the world beyond its borders has increased in complexity in recent years, so individuals' expectations of their nation's constitutions have also increased considerably compared with the past. Using Northern Ireland as an exemplar, the chapter argues that Turkey has the potential to re-make itself through the adoption of a more modern, pluralistic and outward-looking constitution.