35 resultados para Construction equipment industry
Resumo:
With the continued diffusion of global boundaries coupled with the onset of increased environmental pressure, construction industry attitudes are also shifting. The aim of this paper is to evaluate the construction industry attitudes to global environmental change in both the United Kingdom and Japan. In order to achieve this goal, a qualitative mixed method approach is adopted, encompassing a desk based critique of the literature coupled with an industry interview from both regions. This methodology is adopted with the objective of ascertaining if there are any geographical similarities or differences with the regions in question. The resulting information is analyzed and the results deciphered utilizing mind mapping techniques in the dissemination of the data obtained with the objective of identifying various traits within the data. The results indicate that the United Kingdom and Japan both illustrate various attributes in relation to attitudes towards the global environment. In particular, research indicates that in the Japanese construction industry, there is a distinct lack of enthusiasm shown in construction industry attitudes to counteract environmental challenges currently being faced by implementing sustainable practices, compared to attitudes in the UK construction industry. One of the reasons identified for this, is the lack of leadership provided by the corresponding government, thus resulting in the lack of promotion of sustainable practices in the region. The benefit of this research is that it enables various industry leaders, regardless of geographical location, to actively consider the attitudes and perceptions of those around them, particularly in relation to the sensitive topic of global environmental change within the industry. Where the findings are acknowledged and also utilized, the results should aid in the improvement of the industry on an international scale, while also improving the overall persona of environmental change within the sector.
Resumo:
Sustainability is now recognised as a key issue that must be addressed in the design, construction and lifelong maintenance of civil engineering structures. This paper briefly discusses the generic aspects of sustainability, but the main focus is its application to bridges. Motorway bridges built in the 1960s and 1970s had design lives of 120 years; many, however, were showing signs of deterioration after only 20–40 years. This led to much (ongoing) debate on the issue of initial versus full life-cycle costing. In order to address the highly complex issue of the sustainability of bridges, this paper considers the following specific areas that impinge on this important subject: the impact on sustainability of different forms of bridge construction and maintenance/repair/replacement strategies; the utilisation of innovative in situ testing equipment for assessing the long-term durability of concrete; the development of innovative structural designs for bridges that inherently have greatly extended lives at minimal, if any, additional cost.
Resumo:
The change of supply chain relationships from the traditional adversarial to the collaborative has been increasing in the UK construction industry. To reflect this change, some attempts have been made to establish models for measuring and improving supply chain relationships in construction. However, there are obvious deficiencies in these existing models. This highlights the need for a systematic model for the assessment of construction supply chain relationships. Based on a review of the literature and an expert group discussion, an assessment framework is developed in this paper, which consists of assessment criteria, relationship levels, detailed descriptions, assessment classes and assessment procedures. The proposed framework is evaluated through expert interviews and case studies. This framework provides a roadmap for the improvement of supply chain relationships. It can help construction organisations to position their current relationship and identify key areas for relationship improvement in the future.
Resumo:
This study explores the special characteristics of the construction industry and develops a maturity model for measuring and improving the relationships between the key players of a construction supply chain. The model adopts the capability maturity methodology and defines four maturity levels of construction supply chain relationships. It is in a matrix format, consisting of 24 assessment criteria in eight categories at each maturity level. It also provides three different ways of using the model. The model is evaluated through a series of expert interviews. A case study is also presented to demonstrate the application of this model in practice.
Resumo:
Purpose – The purpose of this study is to explore the formative development of construction supply chain guidelines or proposals in a UK region’s schools’ estates procurement process to more effectively address a forthcoming increase in investment.
Design/methodology/approach – The research approach is interpretive. Using an action research approach, repeated semi-structured interviews and focus groups with a range of stakeholders are conducted.
Findings – The current construction supply chain in schools’ estate procurement has many difficulties, not least given the highly fragmented and disconnected nature of the projects. Synergies are being missed and there is little or no continuous improvement. Drawing on these findings, the research iteratively develops a range of proposals and guidelines to address this situation.
Research limitations/implications – This research adds weight to the current focus on pressing for change in the construction industry. It presents potentially valuable insights into the benefits of partnering arrangements and how these might usefully be incorporated into schools’ estate supply chain.
Practical implications – A set of guidelines is developed to guide the public procurement of schools’ estate in a UK region. These guidelines are set within the context of the Modernising and Rethinking Construction agenda.
Originality/value – The action research approach enabled the researchers to gain a unique insight into how public procurement and contractor personnel interact and to establish effective practical guidelines.
Resumo:
The construction industry is inherently hazardous, with a significant number of accidents and incidents occurring, particularly on confined construction sites. This research identifies, clarifies and tabulates the various managerial health and safety issues encountered on confined construction sites, based on a qualitative approach, to aid in the management of the complex health and safety concerns. The methodology is based on qualitative research incorporating case studies, interviews, causal loop diagrams and mind mapping. The key findings in the managerial issues in the management of health and safety on confined construction sites can be summarised as follows; (1) A lack of space, (2) Increased management of site personnel, (3) Overcrowding of the work place. The implication for the industry is that due to the sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters. The value of such research is to aid management professionals successfully identify the various managerial issues highlighted, resulting in the successful management of health and safety on a confined construction site.
Resumo:
The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.
Resumo:
The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.
Resumo:
There has been an increasing highlight of supply chain collaboration in UK construction. However, few studies have provided evidence for the current status. Based on the analysis of over 100 questionnaire responses in this research, it is found that the UK construction industry as a whole is experiencing an important change and moving towards supply chain collaboration. On the other hand, an unbalance is found for the change movement. In addition to the questionnaire survey, a series of expert interviews help to explore the specific characteristics of supply chain collaboration in construction and provide practical implications for collaboration strategy implementation.
Resumo:
The purpose of this study was to investigate the occupational hazards within the tanning industry caused by contaminated dust. A qualitative assessment of the risk of human exposure to dust was made throughout a commercial Kenyan tannery. Using this information, high-risk points in the processing line were identified and dust sampling regimes developed. An optical set-up using microscopy and digital imaging techniques was used to determine dust particle numbers and size distributions. The results showed that chemical handling was the most hazardous (12 mg m(-3)). A Monte Carlo method was used to estimate the concentration of the dust in the air throughout the tannery during an 8 h working day. This showed that the high-risk area of the tannery was associated with mean concentrations of dust greater than the UK Statutory Instrument 2002 No. 2677. stipulated limits (exceeding 10 mg m(-3) (Inhalable dust limits) and 4 mg m(-3) (Respirable dust limits). This therefore has implications in terms of provision of personal protective equipment (PPE) to the tannery workers for the mitigation of occupational risk.
Resumo:
With the increase in construction in dense urban environments, the delays associated with managing the material supply chain to site is called into question. Purpose: The aim of this investigation is to gain the perspective of construction contractors operating in a dense urban environment and the resulting strategies adopted to reduce delays in the delivery of materials to site. Methodology: This is achieved through incorporating a comprehensive literature review on the subject in conjunction with industry interviews with construction professionals in the identification of various management issues and corresponding strategies in the reduction of delays in the delivery of materials to site. Findings: The key issue which emerges is the lack of space for unloading bays while the corresponding key strategy is to schedule deliveries outside peak congestion times. Practical Implication: With confined site construction evident throughout the industry and the noted importance of an effective supply chain, the findings here in further assist on-site management in the daily task of ensuring the effective delivery and off-loading of materials in a complex and hazardous environment. Originality/Value: This research aids on-site management of confined site environments in the coordination of the material supply chain to site.
Resumo:
This research assesses the effectiveness of current MSc. Construction Project Management programmes within the UK and Ireland. A review of published prospectuses is used to create questionnaires for universities, graduates and employers. Responses provide an insight into programme creation and their relative success in addressing the needs of industry and in achieving other educational objectives. Since the majority of learning institutions have attained professional accreditation, it is useful to review these awards and to assess their potential value to both graduates and industry alike. Interviews are conducted with representatives from the main professional accrediting bodies to understand their procedures and rigour in enforcing standards of education and training. The results show that project management education could be further enhanced by the inclusion of more practical learning and that current programmes place greater emphasis on hard skills at the expense of the softer human skills. There is clearly a need for a closer working relationship between academics and practitioners to tackle the perceived gap between theoretical learning and construction practice. Learning institutions can use the findings to improve their programmes and address the education deficiencies identified by the industry, by the professional institutions and by graduates.
Resumo:
The ability of building information modeling (BIM) to positively impact projects in the AEC through greater collaboration and integration is widely acknowledged. This paper aims to examine the development of BIM and how it can contribute to the cold-formed steel (CFS) building industry. This is achieved through the adoption of a qualitative methodology encompassing a literature review, exploratory interviews with industry experts, culminating in the development of e-learning material for the sector. In doing so, the research team have collaborated with one of the United Kingdom’s largest cold-formed steel designer/fabricators. By demonstrating the capabilities of BIM software and providing technical and informative videos in its creation, this project has found two key outcomes. Firstly, to provide invaluable assistance in the transition from traditional processes to a fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. Secondly, to demonstrate BIM’s potential not only within CFS companies, but also within the AEC sector as a whole. As the flexibility, adaptability and interoperability of BIM software is alluded to, the results indicate that the introduction and development of BIM and the underlying ethos suggests that it is a key tool in the development of the industry as a whole.