32 resultados para Construction Industry Development


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this study is to explore the formative development of construction supply chain guidelines or proposals in a UK region’s schools’ estates procurement process to more effectively address a forthcoming increase in investment.

Design/methodology/approach – The research approach is interpretive. Using an action research approach, repeated semi-structured interviews and focus groups with a range of stakeholders are conducted.

Findings – The current construction supply chain in schools’ estate procurement has many difficulties, not least given the highly fragmented and disconnected nature of the projects. Synergies are being missed and there is little or no continuous improvement. Drawing on these findings, the research iteratively develops a range of proposals and guidelines to address this situation.

Research limitations/implications – This research adds weight to the current focus on pressing for change in the construction industry. It presents potentially valuable insights into the benefits of partnering arrangements and how these might usefully be incorporated into schools’ estate supply chain.

Practical implications – A set of guidelines is developed to guide the public procurement of schools’ estate in a UK region. These guidelines are set within the context of the Modernising and Rethinking Construction agenda.

Originality/value – The action research approach enabled the researchers to gain a unique insight into how public procurement and contractor personnel interact and to establish effective practical guidelines.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is inherently hazardous, with a significant number of accidents and incidents occurring, particularly on confined construction sites. This research identifies, clarifies and tabulates the various managerial health and safety issues encountered on confined construction sites, based on a qualitative approach, to aid in the management of the complex health and safety concerns. The methodology is based on qualitative research incorporating case studies, interviews, causal loop diagrams and mind mapping. The key findings in the managerial issues in the management of health and safety on confined construction sites can be summarised as follows; (1) A lack of space, (2) Increased management of site personnel, (3) Overcrowding of the work place. The implication for the industry is that due to the sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters. The value of such research is to aid management professionals successfully identify the various managerial issues highlighted, resulting in the successful management of health and safety on a confined construction site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.

Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.

Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.

Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.

Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The importance of inter-organizational trust to project success has been increasingly highlighted in the construction industry. This study aims to explore the role of trust between project parties. It adopts a combination of quantitative and qualitative methodologies. Based on the analysis of the responses of a questionnaire survey, trust is demonstrated to have a significant contribution to the development of cooperative or collaborative relationships; fostering trust proves to have a major influence on the improvement of project performance; and some relationship and performance indicators are found to have closer associations with trust than others so that trust is more important to
the development of relationship and the improvement of performance in these aspects. The analysis of questionnaire responses also provides significant evidence for the reduction in monitoring and control following the increase of mutual trust. The questionnaire survey is followed by a series of expert interviews, both of which contribute to the establishment of a model that links trust with relationship and performance and distinguishes the new approach that is based on trust from the traditional mechanism that relies on monitoring and control.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is continuing to evolve and develop as the construction industry progresses towards level 2 maturity. However, one of the core barriers in this progression is the aspect of interoperability between software packages. This research and paper stems from a Knowledge Transfer Partnership (KTP) where both industry and academia come together to address this shortcoming within the sector. One of the core objectives of this partnership and the aim of this study is investigating potential solutions to this barrier, while also developing best working practices to be applied in industry. Using one of the case studies from this partnership (a temporary steel structure), this paper demonstrates a potential solution to addressing interoperability within structural analysis and detailing packages, MasterSeries and Revit respectively. The findings of the research indicate that a process based approach rather than that of additional software coding as being the preferred solution. The results of this preliminary research will aid in the development of the topic of interoperability within the sector, while also developing the knowledge and competencies of the parties within the KTP. The findings are explored further, by providing an overview of the resolution process adopted in this case study, in overcoming the interoperability that arose as the project progressed. It is envisaged that this study will assist the construction sector and its adoption of BIM technologies, while also addressing the critical aspect of operability between software.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the near future, geopolymers or alkali-activated cementitious materials will be used as new high-performance construction materials of low environmental impact with a reasonable cost. This material is a good candidate to partially replace ordinary portland cement (OPC) in concrete as a major construction material that plays an outstanding role in the construction industry of different structures. Geopolymer materials are inorganic polymers based on alumina and silica units; they are synthesized from a wide range of dehydroxylated alumina-silicate powders condensed with alkaline silicate in a highly alkaline environment. Geopolymeric materials can be produced from a wide range of alumina-silica, including natural products--such as natural pozzolan and metakaolin--or coproducts--such as fly ash (coal and lignite), oil fuel ash, blast furnace or steel slag, and silica fume--and provide a route toward sustainable development. Using lesser amounts of calcium-based raw materials, lower manufacturing temperature, and lower amounts of fuel result in reduced carbon emissions for geopolymer cement manufacture up to 22 to 72% in comparison with portland cement. A study has been done by the authors to investigate the intrinsic nature of different types of Iranian natural pozzolans to determine the activators and methods that could be used to produce a geopolymer concrete based on alkali-activated natural pozzolan (AANP) and optimize mixture design. The mechanical behavior and durability of these types of geopolymer concrete were investigated and compared with normal OPC concrete mixtures cast by the authors and also reported in the literature. This paper summarizes the main conclusions of the research regarding pozzolanic activity, activator properties, engineering and durability properties, applications and evaluation of carbon footprint, and cost for AANP concrete.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The overall intent of this research is to provide architects with information that can be used to improve their performance so as to optimally satisfy the client's requirements and achieve high-quality overall project performance in Nigerian construction industry. Architect performance criteria were identified based on literature within the domain of architect responsibilities. The assessment of architects’ performance was carried out through a questionnaire survey of clients of recently completed building projects in Nigeria. Analysis of data includes comparison of criteria using importance–performance index analysis. Factor analysis was carried out on criteria where architects are falling below average, to group and explore the latent structure of the criteria in the data. The results showed that the architect needs to focus on management skills and ability, buildability, design quality, project communication, project integration and client focus. These results would encourage architects to perform better within their full responsibilities in the building delivery process and deliver high-quality projects within Nigerian construction industry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Poverty alleviation lies at the heart of contemporary international initiatives on development. The key to development is the creation of an environment in which people can develop their potential, leading productive, creative lives in accordance with their needs, interests and faith. This entails, on the one hand, protecting the vulnerable from things that threaten their survival, such as inadequate nutrition, disease, conflict, natural disasters and the impact of climate change, thereby enhancing the poor’s capabilities to develop resilience in difficult conditions. On the other hand, it also requires a means of empowering the poor to act on their own behalf, as individuals and communities, to secure access to resources and the basic necessities of life such as water, food, shelter, sanitation, health and education. ‘Development’, from this perspective, seeks to address the sources of human insecurity, working towards ‘freedom from want, freedom from fear’ in ways that empower the vulnerable as agents of development (not passive recipients of benefaction).

Recognition of the magnitude of the problems confronted by the poor and failure of past interventions to tackle basic issues of human security led the United Nations (UN) in September 2000 to set out a range of ambitious, but clearly defined, development goals to be achieved by 2015. These are known as the Millennium Development Goals (MDGs). The intention of the UN was to mobilise multilateral international organisations, non-governmental organisations and the wider international community to focus attention on fulfilling earlier promises to combat global poverty. This international framework for development prioritises: the eradication of extreme poverty and hunger; achieving universal primary education; promoting gender equality and empowering women; reducing child mortality; improving maternal health; combating HIV/AIDS, malaria and other diseases; ensuring environmental sustainability; and developing a global partnership for development. These goals have been mapped onto specific targets (18 in total) against which outcomes of associated development initiatives can be measured and the international community held to account. If the world achieves the MDGs, more than 500 million people will be lifted out of poverty. However, the challenges the goals represent are formidable. Interim reports on the initiative indicate a need to scale-up efforts and accelerate progress.
Only MDG 7, Target 11 explicitly identifies shelter as a priority, identifying the need to secure ‘by 2020 a significant improvement in the lives of at least 100 million slum dwellers’. This raises a question over how Habitat for Humanity’s commitment to tackling poverty housing fits within this broader international framework designed to allievate global poverty. From an analysis of HFH case studies, this report argues that the processes by which Habitat for Humanity tackles poverty housing directly engages with the agenda set by the MDGs. This should not be regarded as a beneficial by-product of the delivery of decent, affordable shelter, but rather understood in terms of the ways in which Habitat for Humanity has translated its mission and values into a participatory model that empowers individuals and communities to address the interdependencies between inadequate shelter and other sources of human insecurity. What housing can deliver is as important as what housing itself is.

Examples of the ways in which Habitat for Humanity projects engage with the MDG framework include the incorporation of sustainable livelihoods strategies, up-grading of basic infrastructure and promotion of models of good governance. This includes housing projects that have also offered training to young people in skills used in the construction industry, microfinanced loans for women to start up their own home-based businesses, and the provision of food gardens. These play an important role in lifting families out of poverty and ensuring the sustainability of HFH projects. Studies of the impact of improved shelter and security of livelihood upon family life and the welfare of children evidence higher rates of participation in education, more time dedicated to study and greater individual achievement. Habitat for Humanity projects also typically incorporate measures to up-grade the provision of basic sanitation facilities and supplies of safe, potable drinking water. These measures not only directly help reduce mortality rates (e.g. diarrheal diseases account for around 2 million deaths annually in children under 5), but also, when delivered through HFH project-related ‘community funds’, empower the poor to mobilise community resources, develop local leadership capacities and even secure de facto security of tenure from government authorities.

In the process of translating its mission and values into practical measures, HFH has developed a range of innovative practices that deliver much more than housing alone. The organisation’s participatory model enables both direct beneficiaries and the wider community to tackle the insecurities they face, unlocking latent skills and enterprise, building sustainable livelihood capabilities. HFH plays an important role as a catalyst for change, delivering through the vehicle of housing the means to address the primary causes of poverty itself. Its contribution to wider development priorities deserves better recognition. In calibrating the success of HFH projects in terms of units completed or renovated alone, the significance of the process by which HFH realises these outcomes is often not sufficiently acknowledged, both within the organisation and externally. As the case studies developed in the report illustrate, the methodologies Habitat for Humanity employs to address the issue of poverty housing within the developing world, place the organisation at the centre of a global strategic agenda to address the root causes of poverty through community empowerment and the transformation of structures of governance.

Given this, the global network of HFH affiliates constitutes a unique organisational framework to faciliate sharing resources, ideas and practical experience across a diverse range of cultural, political and institutional environments. This said, it is apparent that work needs to be done to better to faciliate the pooling of experience and lessons learnt from across its affiliates. Much is to be gained from learning from less successful projects, sharing innovative practices, identifying strategic partnerships with donors, other NGOs and CBOs, and engaging with the international development community on how housing fits within a broader agenda to alleviate poverty and promote good governance.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This study explores the special characteristics of the construction industry and develops a maturity model for measuring and improving the relationships between the key players of a construction supply chain. The model adopts the capability maturity methodology and defines four maturity levels of construction supply chain relationships. It is in a matrix format, consisting of 24 assessment criteria in eight categories at each maturity level. It also provides three different ways of using the model. The model is evaluated through a series of expert interviews. A case study is also presented to demonstrate the application of this model in practice.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The election of February 2011 was dominated by the International Monetary Fund/European Central Bank bailout of November 2010, the state of the public finances, the ongoing Irish banking crisis, and the disastrous state of the economy with rising unemployment, emigration and collapsing international competiveness. After years of phenomenal economic growth (at least as measured by orthodox economic measurements such as gross domestic product (GDP) and foreign direct investment), known as the 'Celtic Tiger‘, during which a bloated construction industry accounted for a quarter of GDP and Irish banks sank nearly a third of their lending in construction projects, Ireland has entered a 'post-Celtic Tiger‘ era. This article offers a critical analysis outlining some political, economic and cultural issues of this election as heralding a decisive stage in the 'post-Celtic Tiger' development of the Republic of Ireland, and suggests that what is required at this present historical moment is that a different development model be articulated by the Irish state and wider society.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

There has been an increasing highlight of supply chain collaboration in UK construction. However, few studies have provided evidence for the current status. Based on the analysis of over 100 questionnaire responses in this research, it is found that the UK construction industry as a whole is experiencing an important change and moving towards supply chain collaboration. On the other hand, an unbalance is found for the change movement. In addition to the questionnaire survey, a series of expert interviews help to explore the specific characteristics of supply chain collaboration in construction and provide practical implications for collaboration strategy implementation.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose - To identify the critical factors causing construction disputes in Small to Medium Enterprises (SMEs) in Ireland during the recent recession period of 2007 to 2013.
Design/Methodology/Approach - A mixed method approach incorporating a literature review, case studies and questionnaire survey, with results analysed using exploratory (data reduction) factor analysis.
Findings - The results indicate seven core critical factors which result in construction disputes in SMEs in Ireland during a recession: Payment and extras; Physical work conditions; Poor financial/legal practise; Changes to the agreed scope of works; Time overrun; Defects; and Requests for increase in speed of project and long-term defects.
Research Limitations/Implications - With Ireland emerging from the current economic recession and the prevalence of SMEs to the construction sector, it is essential to document the core critical factors of construction disputes which emerge within this particular segment of the built environment.
Practical Implications - To address the adversarial nature of the construction sector and the prevalence of SMEs, it is essential to identify and document the critical factors of construction disputes within this remit. It is envisaged that the results of this research will be acknowledged, and the recommendations adopted, by construction SMEs, particularly within Ireland, as they emerge from the economic recession.
Originality/Value - This paper fulfils a gap in knowledge with the emergence of the economic recession and the identification of critical factors of construction dispute within SMEs in the Irish construction industry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The growth of the construction industry worldwide poses a serious concern on the sustainability of the building material production chain, mainly due to the carbon emissions related to the production of Portland cement. On the other hand, valuable materials from waste streams, particularly from the metallurgical industry, are not used at their full potential. Alkali activated concrete (AAC) has emerged in the last years as a promising alternative to traditional Portland cement based concrete for some applications. However, despite showing remarkable strength and durability potential, its utilisation is not widespread, mainly due to the lack of broadly accepted standards for the selection of suitable mix recipes fulfilling design requirements, in particular workability, setting time and strength. In this paper, a contribution towards the design development of AAC synthetized from pulverised fuel ash (60%) and ground granulated blast furnace slag (40%) activated with a solution of sodium hydroxide and sodium silicate is proposed. Results from a first batch of mixes indicated that water content influences the setting time and that paste content is a key parameter for controlling strength development and workability. The investigation indicated that, for the given raw materials and activator compositions, a minimum water to solid (w/s) ratio of 0.37 was needed for an initial setting time of about 1 hour. Further work with paste content in the range of 30% to 33% determined the relationship between workability and strength development and w/s ratio and paste content. Strengths in the range of 50 - 60 MPa were achieved.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

There is a broad consensus surrounding the ability of building information modelling (BIM) to positively impact a project by enabling greater collaboration. This paper aims to examine the development of BIM and how it can contribute to the evermore present and growing cold-formed steel (CFS) industry. This is achieved thorough a comprehensive literature review and four exploratory interviews with industry experts. Work has been carried out, for the first time, alongside one of the UK’s largest CFS Designer/Fabricators in conjunction with Northern Ireland’s leading Architectural and Town Planning Consultants in the identification and dissemination of information. The capabilities of BIM have been investigated through modeling of simple CFS structures n consultation with the project partners. By scrutinising the literature and associated interviews, the primary opportunities, as well as barriers, of BIM implementation have been investigated in the context of these companies. It is essential to develop greater understanding of the flexibility, adaptability and interoperability of BIM software as the UK construction industry faces a daunting challenge; fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. This paper, and the wider study that it stems from, approaches the problem from a new angle, from sections of the construction industry that have not yet fully embedded BIM.