214 resultados para usability issues


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In November 2014, a new EU Regulation to address Invasive Alien Species (IAS) and protect biodiversity was published. This entered into force across the EU in January 2015. The aim of the Regulation is to ‘prevent the introduction of, control or eradicate alien species which threaten ecosystems, habitats or species’. In an effort to provide focus to the Regulation prior to its publishing and to identify the major issues relating to Invasive Alien Species in Europe, the views of invasive species experts from around the world were sought. These were consolidated at an international conference (Freshwater Invasives - Networking for Strategy (FINS)) that was held in Ireland in April 2013. A major outcome from this meeting of experts was the production of the Top 20 IAS issues that relate primarily to freshwater habitats but are also directly relevant to marine and terrestrial ecosystems. This list will support policy makers throughout the EU as preparations are made to implement this important piece of legislation. A further outcome from the conference was the formation of an expert IAS Advisory Group to support EIFAAC in its work on invasive species

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Externally bonding of FRP composites is an effective technique for retrofitting historical masonry arch structures. A major failure mode in such strengthened structures is the debonding of FRP from the masonry. The bond behaviour between FRP and masonry thus plays a crucial role in these structures. Major challenges exist in the finite element modelling of such structures, such as modelling of mixed Mode-I and Mode-II bond behaviour between the FRP and the curved masonry substrate, modelling of existing damages in the masonry arches, consideration of loading history in the unstrengthened and strengthened structure etc. This paper presents a rigorous FE model for simulating FRP strengthened masonry arch structures. A detailed solid model was developed for simulating the masonry and a mixed-mode interface model was used for simulating the FRP-to-masonry bond behaviour. The model produces results in very close agreement with test results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper examines issues of capacity, delivery and quality in relation to the Planning Bill. It is one of four papers and follows a common format highlighting the key issues arising in the Bill; summarising the findings of the public consultation and the Government’s response; reviewing comparable arrangements in comparable jurisdictions and highlighting potential contentious issues.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Among Caucasians, it is well known that 75-95% of primary glaucoma is due to open-angle glaucoma (POAG), with angle-closure (PACG) comprising only a very small minority of cases. These figures are reversed among other groups such as Asians and Eskimos, where PACG makes up 80-90% of primary glaucoma. Among Eskimos, the prevalence of PACG has been reported as 2-8%, as compared to 0.1% among Caucasians. It appears that a population tendency toward shallow anterior chambers may explain the excess burden of PACG morbidity. Among Asians, the prevalence of PACG is intermediate between Caucasians and Eskimos. Existing biometrical data do not show a clear tendency toward shallower anterior chambers among Asians. PACG may be screened for on a population basis by means of various techniques that estimate axial or limbal anterior chamber depth, measure intraocular pressure, or evaluate the optic disc or visual fields. Demographic information and medical and family history will also be of great importance in screening for PACG in large populations. Groups at increased risk for the disease include women, individuals over 50, first-degree relatives of PACG probands, and hyperopes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A comprehensive continuum damage mechanics model [1] had been developed to capture the detailed
behaviour of a composite structure under a crushing load. This paper explores some of the difficulties
encountered in the implementation of this model and their mitigation. The use of reduced integration
element and a strain softening model both negatively affect the accuracy and stability of the
simulation. Damage localisation effects demanded an accurate measure of characteristic length. A
robust algorithm for determining the characteristic length was implemented. Testing showed that this
algorithm produced marked improvements over the use of the default characteristic length provided
by Abaqus. Zero-energy or hourglass modes, in reduced integration elements, led to reduced
resistance to bending. This was compounded by the strain softening model, which led to the formation
of elements with little resistance to deformation that could invert if left unchecked. It was shown,
through benchmark testing, that by deleting elements with excess distortions and controlling the mesh
using inbuilt distortion/hourglass controls, these issues can be alleviated. These techniques
contributed significantly to the viability and usability of the damage model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Large construction projects create numerous hazards, making it one of the most dangerous industries in which to work. This element of risk increases in urban areas and can have a negative impact on the external stakeholders associated with the project, along with their surrounding environments. The aim of this paper is to identify and document, in an urban context, the numerous issues encountered by on-site project managers from external stakeholders and how they affect a construction project. In addressing this aim, the core objective is to identify what issues are involved in the management of these stakeholders. In order to meet this requirement, a qualitative methodology encompassing an informative literature review followed by five individual case study interviews. The data gathered is assessed qualitatively using mind mapping software. A number of issues are identified which have an impact on the external stakeholders involved, and also how they affected proceedings on site. Collectively the most commonly occurring issues are environmental, legal, health and safety and communication issues. These ranged from road closures and traffic disruption to noise, dust and vibrations from site works. It is anticipated that the results of this study will assist and aid project managers in identifying issues considering external stakeholders, particularly on urban construction projects. A wide range of issues can develop depending on the complexity and nature of each project, but this research will illustrate and reinforce to project managers, that identifying issues early, effective communication and appropriate liaising can be used to manage the issues considering external stakeholders.