24 resultados para service performance
Resumo:
The performance of the surface zone of concrete is acknowledged as a major factor governing the rate of deterioration of reinforced concrete structures as it provides the only barrier to the ingress of water containing dissolved ionic species such as chlorides which, ultimately, initiate corrosion of the reinforcement. In-situ monitoring of cover-zone concrete is therefore critical in attempting to make realistic predictions as to the in-service performance of the structure. To this end, this paper presents developments in a remote interrogation system to allow continuous, real-time monitoring of the cover-zone concrete from an office setting. Use is made of a multi-electrode array embedded within cover-zone concrete to acquire discretized electrical resistivity and temperature measurements, with both parameters monitored spatially and temporally. On-site instrumentation, which allows remote interrogation of concrete samples placed at a marine exposure site, is detailed, together with data handling and processing procedures. Site-measurements highlight the influence of temperature on electrical resistivity and an Arrhenius-based temperature correction protocol is developed using on-site measurements to standardize resistivity data to a reference temperature; this is an advancement over the use of laboratory-based procedures. The testing methodology and interrogation system represents a robust, low-cost and high-value technique which could be deployed for intelligent monitoring of reinforced concrete structures.
Resumo:
This paper discusses the beneficial influence of compressive membrane action in fibre reinforced polymer (FRP)reinforced in-plane restrained slabs in bridge deck slabs and the improved service performance when archingaction occurs. Bridge deck slabs that are exposed to extreme environmental conditions can experience severecorrosion damage. Expansive corrosion in steel reinforcement significantly reduces the design life and durabilityof concrete structures; for example, on one short section of the M1 in Northern Ireland, nearly £1 million was spent last year on the maintenance and repair of bridges due to corrosion. Corrosion-resistant compositereinforcement such as basalt fibre reinforced polymer (BFRP) and glass fibre reinforced polymer (GFRP) provides adurable alternative to reinforcing steel. In this research, two BFRP reinforced slabs and two GFRP reinforced slabswere constructed using high-strength concrete with a target cube compressive strength of 65 N/mm2. The slabsrepresented typical full-scale dimensions of a real bridge deck slab 475 mm wide by 1425 mm long and 150 mmdeep. The service and ultimate behaviour of the slabs are discussed and the results are compared with the relevantdesign guidelines.
Resumo:
Improvements in the structural performance of glulam timber beams by the inclusion of reinforcing materials can increase both the service performance and ultimate capacity. This paper describes a series of four-point bending tests conducted, under service loads and to failure, on unreinforced, reinforced and post-tensioned glulam timber beams, where the reinforcing tendon used is 12 mm dia. basalt fibre-reinforced polymer. The research is designed to evaluate the benefits offered by including an active reinforcement in contrast to the passive reinforcement typically used within timber strengthening works, in addition to establishing the effect that bonding the reinforcing tendon has on the material's performance. Further experimental tests have also been developed to investigate the long-term implications of this research, with emphasis placed upon creep and loss of post-tensioning; however, this is ongoing and is not presented in this paper. The laboratory investigations establish that the flexural strength and stiffness increase for both the unbonded and bonded post-tensioned timbers compared to the unreinforced and reinforced beams. Timber that is post-tensioned with an unbonded basalt fibre-reinforced polymer tendon shows a flexural strength increase of 2ṡ8% and an increase in stiffness of 8ṡ7%. Post-tensioned beams with a bonded basalt fibre-reinforced polymer tendon show increases in flexural strength and stiffness of 15ṡ4% and 11ṡ5% respectively.
Resumo:
Improvements in the structural performance of glulam timber beams by the inclusion of reinforcing materials can improve both the service performance and ultimate capacity. In recent years research focusing on the addition of fibre reinforced polymers to strengthen members has yielded positive results. However, the FRP material is still a relatively expensive material and its full potential has not been realised in combination with structural timber. This paper describes a series of four-point bending tests that were conducted, under service and ultimate loads, on post-tensioned glulam timber beams where the reinforcing tendon used was 12 mm diameter Basalt Fibre Reinforced Polymer (BFRP). The research was designed to evaluate the additional benefits of including an active type of reinforcement, by post-tensioning the BFRP tendon, as opposed to the passive approach of simply reinforcing the timber beam.
From the laboratory investigations, it was established that there was a 16% increase in load carrying capacity, in addition to a 14% reduction in deflection under service loads when members containing the post-tensioned BFRP composite are compared with control timber specimens. Additionally a more favourable ductile failure mode was witnessed compared to the brittle failure of an unreinforced timber beam. The results support the assumption that by initially stressing the embedded FRP tendon the structural benefits experienced by the timber member increase in a number of ways, indicating that there is significant scope for this approach in practical applications.
Resumo:
Improvements in the structural performance of glulam timber beams by the inclusion of reinforcing materials can increase both the service performance and ultimate capacity. In recent years research focusing on the addition of fibre reinforced polymers (FRP) to strengthen members has yielded positive results. However, the FRP material is still relatively expensive and its full potential in combination with structural timber has not been realised. This paper describes a series of four-point bending tests that were conducted, under service loads and to failure, on unreinforced, reinforced and post-tensioned glulam timber beams, where the reinforcing tendon used was 12mm diameter basalt fibre reinforced polymer (BFRP). The research was designed to evaluate the benefits offered by including an active reinforcement in contrast to the passive reinforcement typically used within timber strengthening works, in addition to establishing the affect that bonding the reinforcing tendon has on the material’s performance. Further experimental tests have been developed to investigate the long-term implications of this research, with emphasis placed upon creep and loss of post-tensioning.
The laboratory investigations established that the flexural strength and stiffness increased for both the unbonded and bonded post-tensioned timbers compared to the unreinforced beams. Timber that was post-tensioned with an unbonded BFRP tendon showed a flexural strength increase of 2.8% and an increase in stiffness of 8.7%. Post-tensioned beams with a bonded BFRP tendon showed increases in flexural strength and stiffness of 16.6% and 11.5% respectively.
Resumo:
Cloud data centres are implemented as large-scale clusters with demanding requirements for service performance, availability and cost of operation. As a result of scale and complexity, data centres typically exhibit large numbers of system anomalies resulting from operator error, resource over/under provisioning, hardware or software failures and security issus anomalies are inherently difficult to identify and resolve promptly via human inspection. Therefore, it is vital in a cloud system to have automatic system monitoring that detects potential anomalies and identifies their source. In this paper we present a lightweight anomaly detection tool for Cloud data centres which combines extended log analysis and rigorous correlation of system metrics, implemented by an efficient correlation algorithm which does not require training or complex infrastructure set up. The LADT algorithm is based on the premise that there is a strong correlation between node level and VM level metrics in a cloud system. This correlation will drop significantly in the event of any performance anomaly at the node-level and a continuous drop in the correlation can indicate the presence of a true anomaly in the node. The log analysis of LADT assists in determining whether the correlation drop could be caused by naturally occurring cloud management activity such as VM migration, creation, suspension, termination or resizing. In this way, any potential anomaly alerts are reasoned about to prevent false positives that could be caused by the cloud operator’s activity. We demonstrate LADT with log analysis in a Cloud environment to show how the log analysis is combined with the correlation of systems metrics to achieve accurate anomaly detection.
Resumo:
This paper explores the factors that determine innovation by service firms, and in particular the contribution of intra- and extra-regional connectivity. Subsequently, it is examined how service firms' innovation activity relates to productivity and export behaviour. The empirical analysis is based on matched data from the 2005 UK Innovation Survey - the UK component of the 4th Community Innovation Survey (CIS) - and the Annual Business Inquiry for Northern Ireland. Evidence is found of negative intra-regional embeddedness effects, but there is a positive contribution to innovation from extra-regional connectivity, particularly links to customers. Relationships between innovation, exporting, and productivity prove complex, but suggest that innovation itself is not sufficient to generate productivity improvements. Only when innovation is combined with increased export activity are productivity gains evident.
Resumo:
The use of cathodic protection in reinforced concrete is becoming increasingly common with such systems being installed on a number of structures throughout the United Kingdom and Ireland. However the prescribed design lives (or service life) of each cathodic protection system vary widely. The aim of this project was to assess the effectiveness of a sacrificial anode cathodic protection system and to predict its design life through a series of laboratory based experiments. The experimental plan involved casting a number of slabs which represented a common road bridge structure. The corrosion of the steel within the experimental slabs was then accelerated prior to installation of a cathodic protection system. During the experiment corrosion potential of the steel reinforcement was monitored using half-cell measurement. Additionally the current flow between the cathodic protection system and the steel reinforcement was recorded to assess the degree of protection. A combination of theoretical calculations and experimental results were then collated to determine the design life of this cathodic protection system. It can be concluded that this sacrificial anode based cathodic protection system was effective in halting the corrosion of steel reinforcement in the concrete slabs studied. Both the corrosion current and half-cell potentials indicated a change in passivity for the steel reinforcement once sacrificial anodes were introduced. The corrosion current was observed to be sensitive to the changes to the exposure environment. Based on the experimental variables studied the design life of this sacrificial anode can be taken as 26 to 30 years.
Resumo:
Wireless enabled portable devices must operate with the highest possible energy efficiency while still maintaining a minimum level and quality of service to meet the user's expectations. The authors analyse the performance of a new pointer-based medium access control protocol that was designed to significantly improve the energy efficiency of user terminals in wireless local area networks. The new protocol, pointer controlled slot allocation and resynchronisation protocol (PCSAR), is based on the existing IEEE 802.11 point coordination function (PCF) standard. PCSAR reduces energy consumption by removing the need for power saving stations to remain awake and listen to the channel. Using OPNET, simulations were performed under symmetric channel loading conditions to compare the performance of PCSAR with the infrastructure power saving mode of IEEE 802.11, PCF-PS. The simulation results demonstrate a significant improvement in energy efficiency without significant reduction in performance when using PCSAR. For a wireless network consisting of an access point and 8 stations in power saving mode, the energy saving was up to 31% while using PCSAR instead of PCF-PS, depending upon frame error rate and load. The results also show that PCSAR offers significantly reduced uplink access delay over PCF-PS while modestly improving uplink throughput.
Resumo:
The provision of security in mobile ad hoc networks is of paramount importance due to their wireless nature. However, when conducting research into security protocols for ad hoc networks it is necessary to consider these in the context of the overall system. For example, communicational delay associated with the underlying MAC layer needs to be taken into account. Nodes in mobile ad hoc networks must strictly obey the rules of the underlying MAC when transmitting security-related messages while still maintaining a certain quality of service. In this paper a novel authentication protocol, RASCAAL, is described and its performance is analysed by investigating both the communicational-related effects of the underlying IEEE 802.11 MAC and the computational-related effects of the cryptographic algorithms employed. To the best of the authors' knowledge, RASCAAL is the first authentication protocol which proposes the concept of dynamically formed short-lived random clusters with no prior knowledge of the cluster head. The performance analysis demonstrates that the communication losses outweigh the computation losses with respect to energy and delay. MAC-related communicational effects account for 99% of the total delay and total energy consumption incurred by the RASCAAL protocol. The results also show that a saving in communicational energy of up to 12.5% can be achieved by changing the status of the wireless nodes during the course of operation. Copyright (C) 2009 G. A. Safdar and M. P. O'Neill (nee McLoone).
Resumo:
DeAuthentication Denial of Service attacks in Public Access WiFi operate by exploiting the lack of authentication of management frames in the 802.11 protocol. Detection of these attacks rely almost exclusively on the selection of appropriate thresholds. In this work the authors demonstrate that there are additional, previously unconsidered, metrics which also influence DoS detection performance. A method of systematically tuning these metrics to optimal values is proposed which ensures that parameter choices are repeatable and verifiable.