74 resultados para mega-projects
Resumo:
Sport Mega-event hosting faces opposition that is manifested with different intensity during the different phases of the event, from its inception as an idea to its delivery and legacy. Some Social Movements Organisations (SMOs) have acted as indefatigable monitors of the Sustainable Development (SD) dimension of sporting events in general and, in some of the most recent sport mega-events, in particular the Olympics, they have served as important advisors and facilitators. Nevertheless, in many cases we see enthusiastic supporters turning to vehemently challenging whatever positives have been associated with hosting the event. In addition, there is opposition to sport Mega-events in their entirety. That type of opposition tends to employ a holistic prism that manages to identify multiple interconnected negative aspects of hosting a sport mega-event and incorporate them into an anti-systemic discourse. It is important to bear in mind that irrespective of many proclamations to the opposite as far as megas are concerned (projects and/or events), a number of studies have demonstrated that citizen participation and democratic accountability in decision-making have been notoriously absent. After all, the idea of citizen participation in the planning of sport mega-event is essentially the public response to a plan conceived by others. There were, of course, some notable cases of democratic consultation at the early stages of bidding to host a sport mega-event but these more democratic approaches resulted in the failure of the bid (for e.g. Toronto 1996). The knowledge of this by the groups that initiated the hosting idea and the bidding process has led to discouraging in depth public consultation that may fit perfectly to the democratic process but not to the tight schedules of associated projects completion. That produces ‘autocracy against which opposition may arise’ (Hiller, 2000, p. 198). It is this democratic deficit that has led to important instances of social contestation and protest mobilizations by citizen groups as well as the more regular corps of social activists. From a perspective borrowed from the sociology of protest and social movements, sport mega-events hosting can operate as an issue that stimulates protest activities by an existing protest milieu and new actors as well as an important mobilizing resource. In fact, some scholars have also argued that the Olympic Games were an important frame for the transnational activism that was marked by anti-globalization protest in Seattle in 1999 (Cottrell & Nelson, 201; Lenskyj, 2008). In addition, it’s important not to lose sight of other acts dissent that take place in relatively close proximity, about a year before the event when most infrastructural and societal changes brought by hosting the event and impact start to become apparent by the host communities, like the rioting of August 2011 in the London Olympic Boroughs and the 2012 riots of June 2013 in Sao Paulo and other Brazilian cities. This paper starts by outlining the SD claims made in the bidding to host the summer Olympic Games by five prospective hosts (Sydney; Athens; Beijing; London and Rio) proceeds towards examining the opposition and challenges that was manifested in relation to these claims. In Particular it provides an assessment of protest-events over the aforementioned different phases of sport mega-events hosting. A different picture emerges for each of the host nation that is partly explained by local, national and global configuration of protest politics. Whereas the post-event legacy of the first two hosts of the Games can be assessed and that way see the validity of claims made by challengers in the other phases, in the other three cases, the implementation of Olympic Games Impact (OGI) studies offers the tool for discussing the post-event phase for Beijing and London and engage in a speculative exercise for the case of Rio. Judging by available findings, the paper concludes that the SD aspiration made in the bid documents are unlikely to be met and social contestation based on the same issues is likely to increase due to the current global economic crisis and BRICS, like China and Brazil, having entered the process of becoming global economic hegemons.
Resumo:
Abstract: Purpose – The aim of this paper is to examine and compare the performance of architects with respect to clients' rating of importance over a set of performance criteria in Nigerian public and private sector building projects. Design/methodology/approach – A survey involving clients from both public and private sectors of recently completed building projects in Nigeria was undertaken. Data analysis includes comparing similarities and differences using standardised ratio, Mann Whitney U and Wilcoxon tests. Findings – The results show that private sector clients are likely to be more concerned with cost, while public sector clients are more concerned with buildability of design. A total of 79 per cent of the criteria were similarly selected by both sectors with respect to importance of the criteria. Architects need to improve their performance significantly in about 82 per cent of the whole set of 28 criteria. The architects performed better in the public sector than the private sector and 14 per cent of the criteria were indicated as being statistically different in terms of architects' performance. Originality/value – The results provide feedback which can be incorporated in architects' future projects so as to ensure successful project implementation in the building delivery process.
Resumo:
We present a technique for simultaneous focusing and energy selection of high-current, mega-electron volt proton beams With the use of radial, transient electric fields (107 to 1010 volts per meter) triggered on the inner walls of a hollow microcylinder by an intense subpicosecond laser pulse. Because of the transient nature of the focusing fields, the proposed method allows selection of a desired range out of the spectrum of the polyenergetic proton beam. This technique addresses current drawbacks of laser-accelerated proton beams, such as their broad spectrum and divergence at the source.
Resumo:
In this paper we describe how an evidential-reasoner can be used as a component of risk assessment of engineering projects using a direct way of reasoning. Guan & Bell (1991) introduced this method by using the mass functions to express rule strengths. Mass functions are also used to express data strengths. The data and rule strengths are combined to get a mass distribution for each rule; i.e., the first half of our reasoning process. Then we combine the prior mass and the evidence from the different rules; i.e., the second half of the reasoning process. Finally, belief intervals are calculated to help in identifying the risks. We apply our evidential-reasoner on an engineering project and the results demonstrate the feasibility and applicability of this system in this environment.
Resumo:
The purpose of this study is to develop a decision making system to evaluate the risks in E-Commerce (EC) projects. Competitive software businesses have the critical task of assessing the risk in the software system development life cycle. This can be conducted on the basis of conventional probabilities, but limited appropriate information is available and so a complete set of probabilities is not available. In such problems, where the analysis is highly subjective and related to vague, incomplete, uncertain or inexact information, the Dempster-Shafer (DS) theory of evidence offers a potential advantage. We use a direct way of reasoning in a single step (i.e., extended DS theory) to develop a decision making system to evaluate the risk in EC projects. This consists of five stages 1) establishing knowledge base and setting rule strengths, 2) collecting evidence and data, 3) determining evidence and rule strength to a mass distribution for each rule; i.e., the first half of a single step reasoning process, 4) combining prior mass and different rules; i.e., the second half of the single step reasoning process, 5) finally, evaluating the belief interval for the best support decision of EC project. We test the system by using potential risk factors associated with EC development and the results indicate that the system is promising way of assisting an EC project manager in identifying potential risk factors and the corresponding project risks.
Resumo:
Software product development is recognised as difficult due to the intangible nature of the product, requirements elicitation, effective progress measurement, and so forth. In this paper, we describe some of the challenges of software product development and how the challenges are being met by lean management principles and techniques. Specifically, we examine lean principles and techniques that were devised by Toyota and other manufacturers over the last 50 years. Applying lean principles to software development projects has been advocated for over ten years and it will be shown that the extensive lean literature is a valuable source of ideas for software development. A case study with a software development organisation, Timberline Inc., will demonstrate that lean principles and techniques can be successfully applied to software product development.