16 resultados para Wage dispute
Resumo:
This paper assesses the development and functioning of regional minimum wage regulation in Northern Ireland in the interwar period under a federal form of devolution. Unlike current devolution arrangements in Scotland and Wales, this gave the Stormont Parliament powers over employment and minimum wage regulation. Northern Ireland Trade Boards were set up by the Ulster Unionist Government under the Trade Boards (Northern Ireland) Act 1923 and functioned along the same lines as those in Great Britain. Uniquely in the UK in this period, employer opposition resulted in the main Trade Board in the Irish Linen Industry being replaced by voluntary collective bargaining machinery. About one-quarter of employees were covered by minimum wage regulation, including two-thirds of females in Belfast, keeping a protective floor under low pay.
Resumo:
This paper uses matched employee-employer LIAB data to provide panel estimates of the structure of labor demand in western Germany, 1993-2002, distinguishing between highly skilled, skilled, and unskilled labor and between the manufacturing and service sectors. Reflecting current preoccupations, our demand analysis seeks also to accommodate the impact of technology and trade in addition to wages. The bottom-line interests are to provide elasticities of the demand for unskilled (and other) labor that should assist in short-run policy design and to identify the extent of skill biases or otherwise in trade and technology.
Resumo:
The construction industry is renowned for spending vast sums in the resolution of disputes, but never in the prevention. The purpose of this paper is to analyse the New Engineering Contract (NEC) to determine whether or not adjudication has become misaligned with the contract’s objective of promoting effective management. In doing so, the paper examines dispute review boards in order to ascertain if they could be a viable alternative to adjudication. A sequential mixed methodology is adopted including a detailed literature review, eight semi-structured interviews, culminating in the circulation and analysis of a questionnaire, to record the significance of the factors identified. The research concludes that the majority of individuals agree that dispute review boards would be more aligned with the NEC. The familiarity of members, the potential to curb rogue behaviour of parties and the proactive nature of the board are flagged as positive features, however the cost aspect requires further investigation. The reservations made in the study about adjudication, such as the priority given to speed over accuracy and also the adversarial nature of the process, suggest that a preventative step prior to proceeding to adjudication would coincide more with the three core themes of the NEC Contract and therefore, be a positive addition.
Resumo:
The purpose of this paper is to identify best practice construction dispute resolution in small-to-medium enterprises (SMEs) within Ireland during the recent economic recession. A sequential mixed methodology encompassing a detailed literature review, case studies, and questionnaire survey is adopted, with results analyzed using both exploratory (data reduction) and confirmatory (structural equation modelling) factor analysis. The results show that four core aspects should be adopted by SMEs to achieve best practice construction dispute resolution in recession: third-party intervention, adoption of a streamlined process, proactive party characteristics, and the use of legal professionals. Numerous studies of this subject have been conducted; however, no research has been done to date documenting best practice in construction dispute resolution within SMEs, particularly in light of the economic recession in Ireland. It is clear that dispute resolution in Ireland is currently undergoing fundamental changes, and time is necessary to see if the new Construction Contracts Act 2013 will help this practice. Therefore, it is a fundamental requirement for project management and legal professionals to acknowledge the changing environment attributable to the economic downturn and the resultant SME best practices in dispute resolution. This paper fulfills a gap in knowledge with the emergence of the economic recession and the evolution of best practice in dispute resolution within SMEs in the Irish construction sector.