33 resultados para Problem solving Graphic methods


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective: Communication skills can be trained alongside clinical reasoning, history taking or clinical examination skills. This is advocated as a solution to the low transfer of communication skills. Still, students have to integrate the knowledge/skills acquired during different curriculum parts in patient consultations at some point. How do medical students experience these integrated consultations within a simulated environment and in real practice when dealing with responsibility?

Methods: Six focus groups were conducted with (pre-)/clerkship students.

Results: Students were motivated to practice integrated consultations with simulated patients and felt like 'real physicians'. However, their focus on medical problem solving drew attention away from improving their communication skills. Responsibility for real patients triggered students' identity development. This identity formation guided the development of an own consultation style, a process that was hampered by conflicting demands of role models.

Conclusion: Practicing complete consultations results in the dilemma of prioritizing medical problem solving above attention for patient communication. Integrated consultation training advances this dilemma to the pre-clerkship period. During clerkships this dilemma is heightened because real patients trigger empathy and responsibility, which invites students to define their role as doctor.

Practice Implications: When training integrated consultations, educators should pay attention to students' learning priorities and support the development of students' professional identity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The study investigated problem solving ability in schizophrenia. Thirty DSM-IIIR schizophrenic patients and 27 matched normal controls were tested on the Three-Dimensional Computerised Tower of London Test (3-D CTL Test) (Morris et al., 1993). The patients took significantly more moves to solve a series of problems and solved significantly fewer problems in the predetermined minimum number of moves. The patients response times, as measured using a control version of the task (the 3-D CTL Control), were longer than those of the controls. However, when latencies were adjusted to take into account the slower responses overall, the patients planning times were not significantly increased. Inaccurate planning, as defined by taking more moves, did not correlate with either positive or negative symptoms, but the response times tended to be longer in patients who had more negative symptoms. The findings suggest that there is a deficit in problem solving activity in schizophrenia that may be associated with translating 'willed intentions' into action, independent of slower motor speed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Problem-solving ability was investigated in 25 DSM-IIIR schizophrenic (SC) patients using the Tower of Hanoi (TOH) task. Their performance was compared to that of: (1) 22 patients with neurosurgical unilateral prefrontal lesions, 11 left (LF) and 10 right hemisphere (RF); (2) 38 patients with unilateral temporal lobectomies, 19 left (LT) and 19 right (RT); and (3) 44 matched control subjects. Like the RT and LF group, the schizophrenics were significantly impaired on the TOH. The deficit shown by the schizophrenic group was equivalent whether or not the problems to be solved included goal-subgoal conflicts, unlike the LF group who were impaired specifically on these problems. The nature of the SC deficit was also distinct from that of the RT group, in that the problem-solving deficit remained after controlling for the effects of spatial memory performance. This study indicates, therefore, that neither focal frontal nor temporal lobe damage sustained in adult life is a sufficient explanation for the problem-solving deficits found in patients with schizophrenia. (C) 1999 Elsevier Science B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the first launch of the new engineering contract (NEC) in 1993, early warning of problems has been widely recognized as an important approach of proactive management during a construction or engineering project. Is early warning really effective for the improvement of problem solving and project performance? This is a research question that still lacks a good answer. For this reason, an empirical investigation was made in the United Kingdom (U.K.) to answer the question. This study adopts a combination of literature review, expert interview, and questionnaire survey. Nearly 100 questionnaire responses were collected from the U.K. construction industry, based on which the use of early warning under different forms of contract is compared in this paper. Problem solving and project performance are further compared between the projects using early warning and the projects not using early warning. The comparison provides clear evidence for the significant effect of early warning on problem solving and project performance in terms of time, cost, and quality. Subsequently, an input-process-output model is developed in this paper to explore the relationship among early warning, problem solving, and project
performance. All these help construction researchers and practitioners to better understand the role of early warning in ensuring project success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In a number of species, individuals showing lateralized hand/paw usage (i.e. the preferential use of either the right or left paw) compared to ambilateral individuals have been shown to be more proactive in novel situations. In the current study we used an established test to assess preferential paw usage in dogs (the Kong test) and then compared the performance of ambilateral and lateralized dogs as well as left- vs. right-pawed dogs in a novel manipulative problem solving task. Results showed an equal proportion of ambilateral and lateralized dogs but contrary to predictions non-lateralized dogs were faster at accessing the apparatus in test trials. No differences emerged between right- and left-pawed dogs. Results are discussed in relation to previous studies on lateralization. © 2013 Elsevier B.V.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

For a structural engineer, effective communication and interaction with architects cannot be underestimated as a key skill to success throughout their professional career. Structural engineers and architects have to share a common language and understanding of each other in order to achieve the most desirable architectural and structural designs. This interaction and engagement develops during their professional career but needs to be nurtured during their undergraduate studies. The objective of this paper is to present the strategies employed to engage higher order thinking in structural engineering students in order to help them solve complex problem-based learning (PBL) design scenarios presented by architecture students. The strategies employed were applied in the experimental setting of an undergraduate module in structural engineering at Queen’s University Belfast in the UK. The strategies employed were active learning to engage with content knowledge, the use of physical conceptual structural models to reinforce key concepts and finally, reinforcing the need for hand sketching of ideas to promote higher order problem-solving. The strategies employed were evaluated through student survey, student feedback and module facilitator (this author) reflection. The strategies were qualitatively perceived by the tutor and quantitatively evaluated by students in a cross-sectional study to help interaction with the architecture students, aid interdisciplinary learning and help students creatively solve problems (through higher order thinking). The students clearly enjoyed this module and in particular interacting with structural engineering tutors and students from another discipline

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Traditional business models in the aerospace industry are based on a conventional supplier to customer relationship based on the design, manufacture and subsequent delivery of the physical product. Service provision, from the manufacturer's perspective, is typically limited to the supply of procedural documentation and the provision of spare parts to the end user as the product passes through the latter stages of its intended lifecycle. Challenging economic and political conditions have resulted in end users re-structuring their core business activities, particularly in the defence sector. This has resulted in the need for original equipment manufacturers (OEMs) to integrate and manage support service activities in partnership with the customer to deliver platform availability. This improves the probability of commercial sustainability for the OEM through shared operational risks while reducing the cost of platform ownership for the customer. The need for OEMs to evolve their design, manufacture and supply strategies by focusing on customer requirements has revealed a need for reconstruction of traditional internal behaviours and design methodologies. Application of organisational learning is now a well recognised principle for innovative companies to achieve long term growth and sustained technical development, and hence, greater market command. It focuses on the process by which the organisation's knowledge and value base changes, leading to improved problem solving ability and capacity for action. From the perspective of availability contracting, knowledge and the processes by which it is generated, used and retained, become primary assets within the learning organisation. This paper will introduce the application of digital methods to asset management by demonstrating how the process of learning can benefit from a digital approach, how product and process design can be integrated within a virtual framework and finally how the approach can be applied in a service context.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: This study explores the experiences and sense of burden of family carers of survivors of malignant middle cerebral artery infarctions who had undergone decompressive hemicraniectomy. To date, there have been no studies examining carer outcomes among this unique population. This study, taken alongside an already published study of survivor outcomes, provides a more holistic picture with regard to sequelae within the sample. Method: Six family carers completed the Sense of Competence Questionnaire and the Hospital Anxiety and Depression Scale. These results were compared with existing normative data. Carers also consented to a semi-structured interview. Interview data were examined using thematic content analysis. Consistent with the mixed methods design, quantitative and qualitative findings were integrated for further analysis. Results: While carers experienced many losses, their overall sense of burden was not outside 'Average' limits, nor did they experience clinically significant symptoms of depression. All carers identified methods of coping with the demands of caregiving. These included intrapersonal, interpersonal and practical strategies. All carers apart from one were able to identify areas of post-traumatic growth. Conclusion: Carers will benefit from information, support and care. In addition, problem solving skills are essential in managing the myriad difficulties that arise in the aftermath of stroke. [Box: see text].

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The traditional planning process in the UK and elsewhere takes too long to develop, are demanding on resources that are scarce and most times tend to be unrelated to the needs and demands of society. It segregates the plan making from the decision making process with the consultants planning, the politicians deciding and the community receiving without being integrated into the planning and decision making process. The Scottish Planning system is undergoing radical changes as evidenced by the publication of the Planning Advice Note, PAN by the Scottish Executive in July 2006 with the aim of enabling Community Engagement that allow for openness and accountability in the decision making process. The Public Engagement is a process that is driven by the physical, social and economic systems research aimed at improving the process at the level of community through problem solving and of the city region through strategic planning. There are several methods available to engage the community in large scale projects. The two well known ones are the Enquiry be Design and the Charrette approaches used in the UK and US respectively. This paper is an independent and rigorous analysis of the Charrette process as observed in the proposed Tornagrain Settlement in the Highlands area of Scotland. It attempts to gauge and analyse the attitudes, perceptions of the participants the Charrette as well as the mechanics and structure of the Charrette. The study analyzes the Charrette approach as a method future public engagement in and its effectiveness within the Scottish Planning System in view of PAN 2005. The analysis revealed that the Charrette as a method of engagement could be effective in changing attitudes of the community to the design process under certain conditions as discussed in the paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This case study examines how the lean ideas behind the Toyota production system can be applied to software project management. It is a detailed investigation of the performance of a nine-person software development team employed by BBC Worldwide based in London. The data collected in 2009 involved direct observations of the development team, the kanban boards, the daily stand-up meetings, semistructured interviews with a wide variety of staff, and statistical analysis. The evidence shows that over the 12-month period, lead time to deliver software improved by 37%, consistency of delivery rose by 47%, and defects reported by customers fell 24%. The significance of this work is showing that the use of lean methods including visual management, team-based problem solving, smaller batch sizes, and statistical process control can improve software development. It also summarizes key differences between agile and lean approaches to software development. The conclusion is that the performance of the software development team was improved by adopting a lean approach. The faster delivery with a focus on creating the highest value to the customer also reduced both technical and market risks. The drawbacks are that it may not fit well with existing corporate standards.