38 resultados para PROJECT MANAGEMENT COMPETENCY


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The ability of building information modeling (BIM) to positively impact projects in the AEC through greater collaboration and integration is widely acknowledged. This paper aims to examine the development of BIM and how it can contribute to the cold-formed steel (CFS) building industry. This is achieved through the adoption of a qualitative methodology encompassing a literature review, exploratory interviews with industry experts, culminating in the development of e-learning material for the sector. In doing so, the research team have collaborated with one of the United Kingdom’s largest cold-formed steel designer/fabricators. By demonstrating the capabilities of BIM software and providing technical and informative videos in its creation, this project has found two key outcomes. Firstly, to provide invaluable assistance in the transition from traditional processes to a fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. Secondly, to demonstrate BIM’s potential not only within CFS companies, but also within the AEC sector as a whole. As the flexibility, adaptability and interoperability of BIM software is alluded to, the results indicate that the introduction and development of BIM and the underlying ethos suggests that it is a key tool in the development of the industry as a whole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Large construction projects create numerous hazards, making it one of the most dangerous industries in which to work. This element of risk increases in urban areas and can have a negative impact on the external stakeholders associated with the project, along with their surrounding environments. The aim of this paper is to identify and document, in an urban context, the numerous issues encountered by on-site project managers from external stakeholders and how they affect a construction project. In addressing this aim, the core objective is to identify what issues are involved in the management of these stakeholders. In order to meet this requirement, a qualitative methodology encompassing an informative literature review followed by five individual case study interviews. The data gathered is assessed qualitatively using mind mapping software. A number of issues are identified which have an impact on the external stakeholders involved, and also how they affected proceedings on site. Collectively the most commonly occurring issues are environmental, legal, health and safety and communication issues. These ranged from road closures and traffic disruption to noise, dust and vibrations from site works. It is anticipated that the results of this study will assist and aid project managers in identifying issues considering external stakeholders, particularly on urban construction projects. A wide range of issues can develop depending on the complexity and nature of each project, but this research will illustrate and reinforce to project managers, that identifying issues early, effective communication and appropriate liaising can be used to manage the issues considering external stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Natural hazards trigger disasters, the scale of which is largely determined by vulnerability. Developing countries suffer the most from disasters due to various conditions of vulnerability which exist and there is an opportunity after disasters to take mitigative action. NGOs implementing post-disaster rehabilitation projects must be able to address the issues causing communities to live at risk of disaster and therefore must build dynamic capacity, capabilities and competencies, enabling them to operate in unstable environments. This research is built upon a theoretical framework of dynamic competency established by combining elements of disaster management, strategic management and project management theory. A number of NGOs which have implemented reconstruction and rehabilitation projects both in Sri Lanka following the Asian Tsunami and Bangladesh following Cyclone Sidr are being investigated in great depth using a causal mapping procedure. ‘Event’ specific maps have been developed for each organization in each disaster. This data will be analysed with a view to discovering the strategies which lead to vulnerability reduction in post-disaster communities and the competencies that NGOs must possess in order to achieve favourable outcomes. It is hypothesized that by building organizational capacity, capabilities and competencies to be dynamic in nature, while focusing on a more emergent strategic approach, with emphasis on adaptive capability and innovation, NGOs will be better equipped to contribute to sustainable community development through reconstruction. We believe that through this study it will be possible to glean a new understanding of social processes that emerge within community rehabilitation projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to summarize the accumulated body of knowledge on the performance of new product projects and provide directions for further research. Design/methodology/approach – Using a refined classification of antecedents of new product project performance the research results are meta-analyzed in the literature in order to identify the strength and stability of predictor-performance relationships. Findings – The results reveal that 22 variables have a significant relationship with new product project performance, of which only 12 variables have a sizable relationship. In order of importance these factors are the degree of organizational interaction, R&D and marketing interface, general product development proficiency, product advantage, financial/business analysis, technical proficiency, management skill, marketing proficiency, market orientation, technology synergy, project manager competency and launch activities. Of the 34 variables 16 predictors show potential for moderator effects. Research limitations/implications – The validity of the results is constrained by publication bias and heterogeneity of performance measures, and directions for the presentation of data in future empirical publications are provided. Practical implications – This study helps new product project managers in understanding and managing the performance of new product development projects. Originality/value – This paper provides unique insights into the importance of predictors of new product performance at the project level. Furthermore, it identifies which predictor-performance relations are contingent on other factors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Few studies to date have paid attention to relationship management when addressing performance problems. To bridge the knowledge gap, a questionnaire survey is conducted to analyze the impact of relationship management on project performance in construction. The analysis reveals that the deterioration of working relationships may increase the likelihood of poor performance. Poor performance can be effectively reduced by improving some aspects of working relationships. Collaborative working contributes to performance improvement, in which long-term collaboration is more effective than short-term collaboration. In addition to the questionnaire survey, a series of expert interviews provide a deeper insight into effective relationship management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

For those working in the humanitarian sector, achieving positive outcomes for postdisaster communities through reconstruction projects is a pressing concern. In the wake of recent natural disasters, NGOs have become increasingly involved in the permanent reconstruction of affected communities. They have encountered significant barriers as they implement reconstruction programmes and this paper argues that it is important to address the visible lack of innovation that is partially to blame. The theoretical bedrock of a current research project will be used as the starting point for this argument, the overall goal of which is to design a competency-based framework model that can be used by NGOs in post-disaster reconstruction projects. Drawing on established theories of management, a unique perspective has been developed from which a competency-based reconstruction theory emerges. This theoretical framework brings together 3 distinct fields; Disaster Management, Strategic Management and Project Management, each vital
to the success of the model. The objectives of this paper are a) to investigate the role of NGOs in post-disaster reconstruction and establish the current standard of practice b) to determine the extent to which NGOs have the opportunity to contribute to sustainable community development through reconstruction c) to outline the main factors of a theoretical framework first proposed by Von Meding et al. 2009 and d) to identify the innovative measures that can be taken by NGOs to achieve more positive outcomes in their interventions. It is important that NGOs involved in post-disaster reconstruction become familiar with concepts and strategies such as those contained in this paper. Competency-based organizational change on the basis of this theory has the potential to help define the standard of best practice to which future NGO projects might align themselves.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In the aftermath of recent natural disasters, NGOs have become increasingly involved in the permanent reconstruction of affected communities. These organizations, often operating well outside their expertise, encounter significant barriers as they implement reconstruction programmes. This paper presents the theoretical bedrock of a current research project, the overall goal of which is to design a competency-based framework model that can be used by NGOs in post-disaster reconstruction projects. Drawing on established theories of management, a unique perspective has been developed from which a competency-based reconstruction theory emerges. This theoretical framework brings together three distinct fields; Disaster Management, Strategic Management and Project Management, each vital to the success of the model. This theoretical study will incorporate a critical review of literature within each field. It is imperative that NGOs involved in post-disaster reconstruction familiarize themselves with concepts and strategies. It is hoped that the competence-based frame-work model that is produced on the basis of this theory will help define the standard of best practice to which future NGO projects might align themselves.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This case study examines how the lean ideas behind the Toyota production system can be applied to software project management. It is a detailed investigation of the performance of a nine-person software development team employed by BBC Worldwide based in London. The data collected in 2009 involved direct observations of the development team, the kanban boards, the daily stand-up meetings, semistructured interviews with a wide variety of staff, and statistical analysis. The evidence shows that over the 12-month period, lead time to deliver software improved by 37%, consistency of delivery rose by 47%, and defects reported by customers fell 24%. The significance of this work is showing that the use of lean methods including visual management, team-based problem solving, smaller batch sizes, and statistical process control can improve software development. It also summarizes key differences between agile and lean approaches to software development. The conclusion is that the performance of the software development team was improved by adopting a lean approach. The faster delivery with a focus on creating the highest value to the customer also reduced both technical and market risks. The drawbacks are that it may not fit well with existing corporate standards.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.

Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.

Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.

Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.

Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.