4 resultados para Fiber Optic Sensors in Quality evaluation
Resumo:
There have been over 3000 bridge weigh-in-motion (B-WIM) installations in 25 countries worldwide, this has led vast improvements in post processing of B-WIM systems since its introduction in the 1970’s. This paper introduces a new low-power B-WIM system using fibre optic sensors (FOS). The system consisted of a series of FOS which were attached to the soffit of an existing integral bridge with a single span of 19m. The site selection criteria and full installation process has been detailed in the paper. A method of calibration was adopted using live traffic at the bridge site and based on this calibration the accuracy of the system was determined.
Resumo:
In this study, fibre optic sensors (FOS) were used to investigate the interfacial stress-strain behaviour of bonded-in basalt fibre reinforced polymer (BFRP) rods loaded into glulam members. Pull-out tests were conducted to examine the effect of bonded length and load-to-grain direction on the distribution of stress at the BFRP rod/adhesive zone. It was observed that the stress concentration at the loaded end of the BFRP rod of the samples was significantly the highest while the unloaded end showed the lowest. Increasing the bonded length at the same loading configuration resulted in a decrease in stress concentration at the loaded end. The stress concentration at the loaded end of the perpendicular to the grain samples was relatively higher than that of the corresponding parallel to the grain samples.
Resumo:
In this paper, the level of dynamics, as described by the Assessment Dynamic Ratio (ADR), is measured directly through a field test on a bridge in the United Kingdom. The bridge was instrumented using fiber optic strain sensors and piezo-polymer weigh-in-motion sensors were installed in the pavement on the approach road. Field measurements of static and static-plus-dynamic strains were taken over 45 days. The results show that, while dynamic amplification is large for many loading events, these tend not to be the critical events. ADR, the allowance that should be made for dynamics in an assessment of safety, is small.