2 resultados para sequential exploitation
em Greenwich Academic Literature Archive - UK
Resumo:
The requirement for a very accurate dependence analysis to underpin software tools to aid the generation of efficient parallel implementations of scalar code is argued. The current status of dependence analysis is shown to be inadequate for the generation of efficient parallel code, causing too many conservative assumptions to be made. This paper summarises the limitations of conventional dependence analysis techniques, and then describes a series of extensions which enable the production of a much more accurate dependence graph. The extensions include analysis of symbolic variables, the development of a symbolic inequality disproof algorithm and its exploitation in a symbolic Banerjee inequality test; the use of inference engine proofs; the exploitation of exact dependence and dependence pre-domination attributes; interprocedural array analysis; conditional variable definition tracing; integer array tracing and division calculations. Analysis case studies on typical numerical code is shown to reduce the total dependencies estimated from conventional analysis by up to 50%. The techniques described in this paper have been embedded within a suite of tools, CAPTools, which combines analysis with user knowledge to produce efficient parallel implementations of numerical mesh based codes.
Resumo:
In this paper, we study a problem of scheduling and batching on two machines in a flow-shop and open-shop environment. Each machine processes operations in batches, and the processing time of a batch is the sum of the processing times of the operations in that batch. A setup time, which depends only on the machine, is required before a batch is processed on a machine, and all jobs in a batch remain at the machine until the entire batch is processed. The aim is to make batching and sequencing decisions, which specify a partition of the jobs into batches on each machine, and a processing order of the batches on each machine, respectively, so that the makespan is minimized. The flow-shop problem is shown to be strongly NP-hard. We demonstrate that there is an optimal solution with the same batches on the two machines; we refer to these as consistent batches. A heuristic is developed that selects the best schedule among several with one, two, or three consistent batches, and is shown to have a worst-case performance ratio of 4/3. For the open-shop, we show that the problem is NP-hard in the ordinary sense. By proving the existence of an optimal solution with one, two or three consistent batches, a close relationship is established with the problem of scheduling two or three identical parallel machines to minimize the makespan. This allows a pseudo-polynomial algorithm to be derived, and various heuristic methods to be suggested.