6 resultados para earliest Triassic
em Greenwich Academic Literature Archive - UK
Resumo:
The Triassic Argilo-Gréseux Inférieur Formation (TAG-I) is one of the principal hydrocarbon reservoirs in the Berkine Basin of Algeria. Sedimentological studies have shown that it exhibits marked spatial and temporal facies variations on both a local field scale and a regional basinal scale. This variability, combined with a lack of diagnostic flora and fauna, makes regional correlation within the unit difficult. In turn, the lack of a consistent regional stratigraphic framework hampers the comparison of the various correlation schemes devised by operators in the basin. Contrasting the TAG-I in Blocks 402 and 405a exemplifies the problems encountered when attempting regionally to define a correlation framework for the interval. Between these two blocks, a distance of approximately 200 km, there are marked changes in the style of deposition from sand-dominated, proximal fluvial systems in the SW (Block 405a, MLN, MLC, KMD and MLNW fields) to a more distal, more clay-prone system in the NE (Block 402, ROD/BRSE/BSFN, SFNE and BSF fields). A chemostratigraphic study of the TAG-I in these two blocks has allowed a four-fold correlation framework to be defined, where each chemostratigraphic package has distinctive geochemical features. Chemostratigraphic Package 10, the oldest unit, lies above the Hercynian Unconformity, but beneath a geochemically identifiable hiatal surface. Chemostratigraphic Package 20 lies above the hiatal surface but is separated from the overlying packages by a mineralogical change identifiable in both claystone and sandstone geochemistry. Chemostratigraphic Packages 30 and 40 are chemically somewhat similar, but are separated by a regional event interpreted as a period of dolocrete and lacustrine development. By combining the geochemical differentiation of the units and recognition of their stratal boundaries, it is possible to define a correlation for the TAG-I between Blocks 402 and 405a. The proposed correlation between the two blocks suggests that the northern parts of Block 405a may have been occupied by a spur or subsidiary channel from the main SW–NE-trending fluvial system, resulting in one of the chemically defined packages being demonstrably absent in the MLNW, MLN, KMD and MLC fields when compared with the other areas of the study.
Resumo:
The future of many companies will depend to a large extent on their ability to initiate techniques that bring schedules, performance, tests, support, production, life-cycle-costs, reliability prediction and quality control into the earliest stages of the product creation process. Important questions for an engineer who is responsible for the quality of electronic parts such as printed circuit boards (PCBs) during design, production, assembly and after-sales support are: What is the impact of temperature? What is the impact of this temperature on the stress produced in the components? What is the electromagnetic compatibility (EMC) associated with such a design? At present, thermal, stress and EMC calculations are undertaken using different software tools that each require model build and meshing. This leads to a large investment in time, and hence cost, to undertake each of these simulations. This paper discusses the progression towards a fully integrated software environment, based on a common data model and user interface, having the capability to predict temperature, stress and EMC fields in a coupled manner. Such a modelling environment used early within the design stage of an electronic product will provide engineers with fast solutions to questions regarding thermal, stress and EMC issues. The paper concentrates on recent developments in creating such an integrated modeling environment with preliminary results from the analyses conducted. Further research into the thermal and stress related aspects of the paper is being conducted under a nationally funded project, while their application in reliability prediction will be addressed in a new European project called PROFIT.
Resumo:
The future success of many electronics companies will depend to a large extent on their ability to initiate techniques that bring schedules, performance, tests, support, production, life-cycle-costs, reliability prediction and quality control into the earliest stages of the product creation process. Earlier papers have discussed the benefits of an integrated analysis environment for system-level thermal, stress and EMC prediction. This paper focuses on developments made to the stress analysis module and presents results obtained for an SMT resistor. Lifetime predictions are made using the Coffin-Manson equation. Comparison with the creep strain energy based models of Darveaux (1997) shows the shear strain based method to underestimate the solder joint life. Conclusions are also made about the capabilities of both approaches to predict the qualitative and quantitative impact of design changes.
Resumo:
Water operators need to be efficient, accountable, honest public institutions providing a universal service. Many water services however lack the institutional strength, the human resources, the technical expertise and equipment, or the financial or managerial capacity to provide these services. They need support to develop these capacities. The vast majority of water operators in the world are in the public sector – 90% of all major cities are served by such bodies. This means that the largest pool of experience and expertise, and the great majority of examples of good practice and sound institutions, are to be found in existing public sector water operators. Because they are public sector, however, they do not have any natural commercial incentive to provide international support. Their incentive stems from solidarity, not profit. Since 1990, however, the policies of donors and development banks have focussed on the private companies and their incentives. The vast resources of the public sector have been overlooked, even blocked by pro-private policies. Out of sight of these global policy-makers, however, a growing number of public sector water companies have been engaged, in a great variety of ways, in helping others develop the capacity to be effective and accountable public services. These supportive arrangements are now called 'public-public partnerships' (PUPs). A public-public partnership (PUP) is simply a collaboration between two or more public authorities or organisations, based on solidarity, to improve the capacity and effectiveness of one partner in providing public water or sanitation services. They have been described as: “a peer relationship forged around common values and objectives, which exclude profit-seeking”.1 Neither partner expects a commercial profit, directly or indirectly. This makes PUPs very different from the public–private partnerships (PPPs) which have been promoted by the international financial institutions (IFIs) like the World Bank. The problems of PPPs have been examined in a number of reports. A great advantage of PUPs is that they avoid the risks of such partnerships: transaction costs, contract failure, renegotiation, the complexities of regulation, commercial opportunism, monopoly pricing, commercial secrecy, currency risk, and lack of public legitimacy.2 PUPs are not merely an abstract concept. The list in the annexe to this paper includes over 130 PUPs in around 70 countries. This means that far more countries have hosted PUPs than host PPPs in water – according to a report from PPIAF in December 2008, there are only 44 countries with private participation in water. These PUPs cover a period of over 20 years, and been used in all regions of the world. The earliest date to the 1980s, when the Yokohama Waterworks Bureau first started partnerships to help train staff in other Asian countries. Many of the PUP projects have been initiated in the last few years, a result of the growing recognition of PUPs as a tool for achieving improvements in public water management. This paper attempts to provide an overview of the typical objectives of PUPs; the different forms of PUPs and partners involved; a series of case studies of actual PUPs; and an examination of the recent WOPs initiative. It then offers recommendations for future development of PUPs.
Resumo:
Antimony,symbol Sb,one of the earliest elements to be recognised, demonstrates that there is much intriguing chemistry to be found in the nether regions of the Periodic Table. Ametalloid with a strong affinity for sulfur, antimony is pharmacologically active and hasbeen used in medicines, but is also a poison.
Resumo:
The recognition that urban groundwater is a potentially valuable resource for potable and industrial uses due to growing pressures on perceived less polluted rural groundwater has led to a requirement to assess the groundwater contamination risk in urban areas from industrial contaminants such as chlorinated solvents. The development of a probabilistic risk based management tool that predicts groundwater quality at potential new urban boreholes is beneficial in determining the best sites for future resource development. The Borehole Optimisation System (BOS) is a custom Geographic Information System (GIs) application that has been developed with the objective of identifying the optimum locations for new abstraction boreholes. BOS can be applied to any aquifer subject to variable contamination risk. The system is described in more detail by Tait et al. [Tait, N.G., Davison, J.J., Whittaker, J.J., Lehame, S.A. Lerner, D.N., 2004a. Borehole Optimisation System (BOS) - a GIs based risk analysis tool for optimising the use of urban groundwater. Environmental Modelling and Software 19, 1111-1124]. This paper applies the BOS model to an urban Permo-Triassic Sandstone aquifer in the city centre of Nottingham, UK. The risk of pollution in potential new boreholes from the industrial chlorinated solvent tetrachloroethene (PCE) was assessed for this region. The risk model was validated against contaminant concentrations from 6 actual field boreholes within the study area. In these studies the model generally underestimated contaminant concentrations. A sensitivity analysis showed that the most responsive model parameters were recharge, effective porosity and contaminant degradation rate. Multiple simulations were undertaken across the study area in order to create surface maps indicating areas of low PCE concentrations, thus indicating the best locations to place new boreholes. Results indicate that northeastern, eastern and central regions have the lowest potential PCE concentrations in abstraction groundwater and therefore are the best sites for locating new boreholes. These locations coincide with aquifer areas that are confined by low permeability Mercia Mudstone deposits. Conversely southern and northwestern areas are unconfined and have shallower depth to groundwater. These areas have the highest potential PCE concentrations. These studies demonstrate the applicability of BOS as a tool for informing decision makers on the development of urban groundwater resources. (c) 2007 Elsevier Ltd. All rights reserved.