13 resultados para Wilkie, Gordon

em Greenwich Academic Literature Archive - UK


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The paper considers the single machine due date assignment and scheduling problems with n jobs in which the due dates are to be obtained from the processing times by adding a positive slack q. A schedule is feasible if there are no tardy jobs and the job sequence respects given precedence constraints. The value of q is chosen so as to minimize a function ϕ(F,q) which is non-decreasing in each of its arguments, where F is a certain non-decreasing earliness penalty function. Once q is chosen or fixed, the corresponding scheduling problem is to find a feasible schedule with the minimum value of function F. In the case of arbitrary precedence constraints the problems under consideration are shown to be NP-hard in the strong sense even for F being total earliness. If the precedence constraints are defined by a series-parallel graph, both scheduling and due date assignment problems are proved solvable in time, provided that F is either the sum of linear functions or the sum of exponential functions. The running time of the algorithms can be reduced to if the jobs are independent. Scope and purpose We consider the single machine due date assignment and scheduling problems and design fast algorithms for their solution under a wide range of assumptions. The problems under consideration arise in production planning when the management is faced with a problem of setting the realistic due dates for a number of orders. The due dates of the orders are determined by increasing the time needed for their fulfillment by a common positive slack. If the slack is set to be large enough, the due dates can be easily maintained, thereby producing a good image of the firm. This, however, may result in the substantial holding cost of the finished products before they are brought to the customer. The objective is to explore the trade-off between the size of the slack and the arising holding costs for the early orders.

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We consider a single machine due date assignment and scheduling problem of minimizing holding costs with no tardy jobs tinder series parallel and somewhat wider class of precedence constraints as well as the properties of series-parallel graphs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

It is shown that every connected, locally connected graph with the maximum vertex degree Δ(G)=5 and the minimum vertex degree δ(G)3 is fully cycle extendable. For Δ(G)4, all connected, locally connected graphs, including infinite ones, are explicitly described. The Hamilton Cycle problem for locally connected graphs with Δ(G)7 is shown to be NP-complete

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We consider various single machine scheduling problems in which the processing time of a job depends either on its position in a processing sequence or on its start time. We focus on problems of minimizing the makespan or the sum of (weighted) completion times of the jobs. In many situations we show that the objective function is priority-generating, and therefore the corresponding scheduling problem under series-parallel precedence constraints is polynomially solvable. In other situations we provide counter-examples that show that the objective function is not priority-generating.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Single machine scheduling problems are considered, in which the processing of jobs depend on positions of the jobs in a schedule and the due-dates are assigned either according to the CON rule (a due-date common to all jobs is chosen) or according to the SLK rule (the due-dates are computed by increasing the actual processing times of each job by a slack, common to all jobs). Polynomial-time dynamic programming algorithms are proposed for the problems with the objective functions that include the cost of assigning the due-dates, the total cost of disgarded jobs (which are not scheduled) and, possibly, the total earliness of the scheduled jobs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We consider single machine scheduling and due date assignment problems in which the processing time of a job depends on its position in a processing sequence. The objective functions include the cost of changing the due dates, the total cost of discarded jobs that cannot be completed by their due dates and, possibly, the total earliness of the scheduled jobs. We present polynomial-time dynamic programming algorithms in the case of two popular due date assignment methods: CON and SLK. The considered problems are related to mathematical models of cooperation between the manufacturer and the customer in supply chain scheduling.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present recession has prompted scholarly and journalistic questioning of the contributions of the cultural industries to the economy. The talent-rich metropolitan clusters of London and New York are well-placed to ride out a thoroughgoing shakeup of the media markets if they manage their infrastructure, space and resources strategically, as Richard Florida has recently argued. This seems to be the assumption behind the recent Digital Britain interim report, and Gordon Brown's remarks that a digital revolution "lies at the heart" of Britain's economic recovery and that broadband and the media industry can play a leading role in pulling the UK out of the recession. Focusing on the Digital Britain report and consultation documents, this presentation seeks to unpack some of the fundamental assumptions behind this link between digital infrastructure, creativity and profitability. In particular the implicit notion of an engaged audience of users, generating "content" as well as shaping new media platforms calls into question long-held theoretical constructions of the mass audience of consumers as spectators; instead, the audience emerges as a potential economic powerhouse, an underused resource for tomorrow's cultural industries.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present recession has prompted scholarly and journalistic questioning of the contributions of the cultural industries to the economy. The talent-rich metropolitan clusters of London and New York are well-placed to ride out a thoroughgoing shakeup of the media markets if they manage their infrastructure, space and resources strategically, as Richard Florida has recently argued. This seems to be the assumption behind the recent Digital Britain interim report, and Gordon Brown's remarks that a digital revolution "lies at the heart" of Britain's economic recovery and that broadband and the media industry can play a leading role in pulling the UK out of the recession. Focusing on the Digital Britain report and consultation documents, this presentation seeks to unpack some of the fundamental assumptions behind this link between digital infrastructure, creativity and profitability. In particular the implicit notion of an engaged audience of users, generating "content" as well as shaping new media platforms calls into question longheld theoretical constructions of the mass audience of consumers as spectators. [From the Author]

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper argues that contemporary literacy programmes are a mismatch for the expectations of both the government and employers as well as the goals of learners. It submits that the dominant discourses in literacy provision have led to the emergence of a learning culture which not only fails the learners but is also incapable of meeting the aspirations of both the government and employers. To support this argument, the paper reports a small scale research project that analyses the perceptions of learners, teachers and employers who were involved in a work placement scheme for young literacy learners in a college of further education. Data for the study were collected through focus group and face to face interviews and analysed using the framework of discourse analysis provided by Gill (2000) with findings codified and analysed thematically. The study found that teachers were aware that their learners were not adequately prepared for the world of work because of the demands of the dominant discourses of quality and performance measurement which were most obviously manifested in their assessment, teaching methods and the attitudes of learners. It found that employers perceive young learners as inadequate in terms of the workplace expectations. Learners in the study revealed that their workplace culture and expectations were totally different from the culture to which they had been socialised in their studies. The study concludes that unless the dominance of these discourses is ameliorated, young literacy learners will continue to be socialised into a discourse of failure.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents the perception of practitioners of the impact of the Moser Committee recommendations and the Skills for Life agenda it generated. The paper further explores areas of convergence and divergence between practitioners’ perceptions and the underpinning values of the Moser Committee recommendations. The study utilised a range of research tools including an online questionnaire, documentary analysis and elements of discourse analysis in the collection and analysis of data. It found that there is substantial divergence between the perception of practitioners and the values underpinning policy. It concludes by suggesting that a varying perception of what constitutes sustainable education and the lack of input from practitioners into policy might be responsible for this significant divergence of opinion and also raised a question on the perceived role of practitioners in the policy‐making process.