3 resultados para Time-delayed feedback control
em Greenwich Academic Literature Archive - UK
Resumo:
We consider the optimum design of pilot-symbol-assisted modulation (PSAM) schemes with feedback. The received signal is periodically fed back to the transmitter through a noiseless delayed link and the time-varying channel is modeled as a Gauss-Markov process. We optimize a lower bound on the channel capacity which incorporates the PSAM parameters and Kalman-based channel estimation and prediction. The parameters available for the capacity optimization are the data power adaptation strategy, pilot spacing and pilot power ratio, subject to an average power constraint. Compared to the optimized open-loop PSAM (i.e., the case where no feedback is provided from the receiver), our results show that even in the presence of feedback delay, the optimized power adaptation provides higher information rates at low signal-to-noise ratios (SNR) in medium-rate fading channels. However, in fast fading channels, even the presence of modest feedback delay dissipates the advantages of power adaptation.
Resumo:
In this paper, a knowledge-based approach is proposed for the management of temporal information in process control. A common-sense theory of temporal constraints over processes/events, allowing relative temporal knowledge, is employed here as the temporal basis for the system. This theory supports duration reasoning and consistency checking, and accepts relative temporal knowledge which is in a form normally used by human operators. An architecture for process control is proposed which centres on an historical database consisting of events and processes, together with the qualitative temporal relationships between their occurrences. The dynamics of the system is expressed by means of three types of rule: database updating rules, process control rules, and data deletion rules. An example is provided in the form of a life scheduler, to illustrate the database and the rule sets. The example demonstrates the transitions of the database over time, and identifies the procedure in terms of a state transition model for the application. The dividing instant problem for logical inference is discussed with reference to this process control example, and it is shown how the temporal theory employed can be used to deal with the problem.
Resumo:
This paper considers a Markovian bulk-arriving queue modified to allow both mass arrivals when the queue is idle and mass departures which allow for the possibility of removing the entire workload. Properties of queues which terminate when the server becomes idle are developed first, since these play a key role in later developments. Results for the case of mass arrivals, but no mass annihilation, are then constructed with specific attention being paid to recurrence properties, equilibrium queue-size structure, and waiting-time distribution. A closed-form expression for the expected queue size and its Laplace transform are also established. All of these results are then generalised to allow for the removal of the entire workload, with closed-form expressions being developed for the equilibrium size and waiting-time distributions.